Tender Value
Refer Docs
EMD Value
₹4 L
Closing Date
4 Mar 2025, 3:00 pmClosed
The Project Director,DRDA,Dindigul
The Project Director,DRDA,Dindigul
Formation of L.Malaiyur H-O Lingavadi gravel road with Drainage Protective works in Natham Block of Dindigul District Under Scheme Component of Pooled Assigned Revenue 2024-25. Package No. TN05-04
2025_RDTN_525507_1
DIPR.414.2025 date 03.02.2025
Open Tender
Civil Works
Item Wise
558 days
DRDA
Formation of L.Malaiyur H-O Lingavadi gravel road with Drainage Protective works in Natham Block of Dindigul District Under Scheme Component of Pooled Assigned Revenue 2024-25. Package No. TN05-04
2 documents required · 2 mandatory
₹0
₹4 L
21 Apr 2025
17 Feb 2025
4 Mar 2025
17 Feb 2025
4 Mar 2025
23 Feb 2025
Amount
1. Upgradation of Road at L.Malaiyur road in Lingavadi panchayat of Natham union KM 0/000 - 3/835. (R-190) Estimate Amount : RS.400.00 LAKHS
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation from borrow pits for filling in all classes of soils, such as gravelly soil hard red earth shales, murrams gravel stoney earth and earth mixed with 50% lair sized boulders and hard gravel soil exept sand and hard rock requiring blasting as per SS 20A (Box cutting)
Earth work excavation from cut earth in roadway for filling in all classes of soils, such as gravelly soil hard red earth shales, murrams gravel stoney earth and earth mixed with 50% lair sized boulders and hard gravel soil exept sand and hard rock requiring blasting as per SS 20A (Filling with cut earth)
Supplying and filling of conveyed earth with a lead of 1Km for basement filling within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A (Filling with borrow earth)
Supplying and filling of Gritty gravel from approved quarry including cost and conveyance of all materials and all labour charges
Construction of 2x5m span culvert @ Ch. Of 270 m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc, (Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Super structure)
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
RCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Wearing coat 75 mm thick in CC 1:1.5:3 mix using 65% 25mm, 25% 12mm and 10% 6mm IRC HBG metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Provision for Chute porvision
Construction of 5m span culvert @ Ch. Of 1655 m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for above sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
RCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Construction of 2x5m span culvert @ Ch. Of 1830 m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc, (Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Super structure)
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
RCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Wearing coat 75 mm thick in CC 1:1.5:3 mix using 65% 25mm, 25% 12mm and 10% 6mm IRC HBG metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Provision for Chute porvision
Construction of 6m span culvert @ Ch. Of 1855 m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for above sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
RCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Construction of 2x5m span culvert @ Ch. Of 1930 m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc, (Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Super structure)
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
RCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Wearing coat 75 mm thick in CC 1:1.5:3 mix using 65% 25mm, 25% 12mm and 10% 6mm IRC HBG metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Provision for Chute porvision
Construction of 2x5m span culvert @ Ch. Of 2150 m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc, (Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Super structure)
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
RCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Rein Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Wearing coat 75 mm thick in CC 1:1.5:3 mix using 65% 25mm, 25% 12mm and 10% 6mm IRC HBG metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplied departmentally at the Departmental section stores and the cost will be recovered at the rates noted in the special conditions appended and conveyance of the same from Departmental section stores to the actual workspot and handling charges at each and including cost of form work mixing concrete laying compacting and watering curing concrete including all leads for good soft, potable water, hire and fuel charges for all tools and plants and all other incidental charges such as baling out water forming protective bunds providing coffer dams etc., complete as directed by the Engineer.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Provision for Chute porvision
Construction of 6m span culvert @ Ch. Of 2665 m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for above sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
RCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Construction of 5m span culvert @ Ch. Of 2715 m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for above sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
RCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Construction of 5m span culvert @ Ch. Of 2840 m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for above sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
RCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Construction of 5m span culvert @ Ch. Of 3560 m
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill)
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for above sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
Sub structure
Super structure
RCC 1:2 :4 mix using 20mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer (Bed block)
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Back filling with Good gritty gravel behind the Abutment & inbetween the wings including all labour charges etc., complete
Providing Weep Holes in Brick masonry reinforced cc wih 100mm Dia AC pipe extending through the full witdh of the struction with standard specification
Provision for Expansion joint inbetween the dirt wall & Deck in Abutment and inbetween deck in Pier in standard specification
Providing and laying Kraft paper barring between deck slab and bed block to the full width of seating
Construction of Retaining wall
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B (for Core wall)
Cemant Concrete 1:4:8 using 40mm gauge hard broken stone jelly for foundation including watering necessary and laid in layers not more than 15cm thick compacting etc,
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes (Sub structure)
Cement concrete 1:3:6 mix using 40mm I SS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement and including all labour charges etc., complete as directed by the Engineer
Providion for name board
Providion for name board
Providion for name board
Providion for name board
Providion for name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SRI SIVASAKTHIBUILDES (BID ID -1262460)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .