Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.8 LAccepted-AOC 14 3RD CROSS ASHWATHNAGAR RMV 2ND STAGE SANJAY NAGAR POST HEBBAL BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹41.5 L+₹1.7 L (4.14%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹41.5 L+₹1.7 L (4.32%)Rejected-AOC 39 SR LAYOUT MAIN ROAD NAL WING TUNNEL ROAD MURUGESH PALYA BANGALORE 560 017 | BENGALURU URBAN | KARNATAKA | 560017 | L3 | Rejected-AOC Rejected | |
| 4 | L4₹41.8 L+₹1.9 L (4.87%)Rejected-AOC NO 45 5TH CROSS MALLAPPA LAYOUT BABUSAPALYA KALYAN NAGAR BANGALORE 560043 | BENGALURU URBAN | KARNATAKA | 560043 | L4 | Rejected-AOC Rejected | |
| 5 | L5₹41.9 L+₹2.1 L (5.20%)Rejected-AOC 20 1ST A CROSS SAI NAGAR AREHLLI UTTARHALLI BANGALORE 560 061 | BENGALURU URBAN | KARNATAKA | 560061 | L5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | P Ramesh and Co L2 | S SELVALAKSHMI ENGINEER AND CONTRACTOR L6 | GKR and CO L3 | K. VENKATESH NAIDU L5 | Sathya Sri Construction L9 | M/S Suresh Raju L4 | Moulya Builders L7 | M R CONSTRUCTIONS L1 | Kavitha Constructions L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (unreinforced) in ground floor and pavings not exceeding 15 cm thickness below or above ground level and removing material from site ofm work complete all as specified and directed. | 60 | Cum | 360 ₹21,600 | 600 ₹36,000 | 630 ₹37,800 | 249 ₹14,940 | 200 ₹12,000 Lowest | 510 ₹30,600 | 650 ₹39,000 | 260 ₹15,600 | 450 ₹27,000 |
| 2.00 | Demolition of brickwork or stone/boulder masanory,laid dry below or above ground level and removing material from site complete all as specified and directed. | 346 | Cum | 270 ₹93,420 | 400 ₹1,38,400 | 200 ₹69,200 | 149 ₹51,554 Lowest | 150 ₹51,900 | 510 ₹1,76,460 | 303 ₹1,04,838 | 200 ₹69,200 | 360 ₹1,24,560 |
| 3.00 | Excavation in trenches not exc 1.5m wide and n. exc 1.5m in depth, for foundation, etc. or for shafts, wells, cesspits, manhole, pier holes, etc. n exc 10 Sqm on plan and n exc 1.5m in depth and getting out in hard/dense soil complete all as specified and directed. | 300 | Cum | 360 ₹1,08,000 | 320 ₹96,000 | 450 ₹1,35,000 | 249 ₹74,700 Lowest | 400 ₹1,20,000 | 410 ₹1,23,000 | 460 ₹1,38,000 | 300 ₹90,000 | 405 ₹1,21,500 |
| 4.00 | Returning filling in, including spreading, levelling, watering and well ramming in layers not exc 25cm in hadr/dense soil complete all as specified and directed. | 107 | Cum | 27 ₹2,889 Lowest | 120 ₹12,840 | 70 ₹7,490 | 49 ₹5,243 | 150 ₹16,050 | 80 ₹8,560 | 75 ₹8,025 | 95 ₹10,165 | 36 ₹3,852 |
| 5.00 | Removing excavated material (soils) not exc. 50 m and depositing in soft/hard soil, where directed, complete all as specified and as directed. | 193 | Cum | 45 ₹8,685 Lowest | 160 ₹30,880 | 220 ₹42,460 | 249 ₹48,057 | 200 ₹38,600 | 98 ₹18,914 | 96 ₹18,528 | 390 ₹75,270 | 52 ₹10,036 |
| 6.00 | Demolition of reinforced cement concrete of any description and in any position not otherwise specially provided for including cutting of steel reinforcement as required to facilitate demolition,complete all as specified and directed. | 24 | Cum | 360 ₹8,640 | 620 ₹14,880 | 700 ₹16,800 | 499 ₹11,976 | 125 ₹3,000 Lowest | 560 ₹13,440 | 600 ₹14,400 | 280 ₹6,720 | 450 ₹10,800 |
| 7.00 | M&L for Reinforced concrete pipes, class NP2, of size 450mm laid and jointed complete with collars, complete all as specified and as directed. | 20 | RM | 700 ₹14,000 Lowest | 900 ₹18,000 | 900 ₹18,000 | 1,459 ₹29,180 | 3,200 ₹64,000 | 1,102 ₹22,040 | 1,250 ₹25,000 | 2,200 ₹44,000 | 900 ₹18,000 |
| 8.00 | M&L for Reinforced concrete pipes, class NP2, of size 600mm laid and jointed complete with collars, complete all as specified and as directed. | 20 | RM | 900 ₹18,000 Lowest | 1,200 ₹24,000 | 1,200 ₹24,000 | 2,499 ₹49,980 | 3,900 ₹78,000 | 1,520 ₹30,400 | 1,750 ₹35,000 | 3,300 ₹66,000 | 1,200 ₹24,000 |
| 9.00 | M&L Reinforced cement concrete Type B-1, 1:2:4 (using 20mm graded aggregate) Nominal Mix as in slabs supported on walls for culverts over open drains, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like, complete all as specified and as directed. | 6 | Cum | 7,000 ₹42,000 | 7,800 ₹46,800 | 6,000 ₹36,000 | 8,499 ₹50,994 | 7,000 ₹42,000 | 6,510 ₹39,060 | 7,500 ₹45,000 | 4,800 ₹28,800 Lowest | 8,100 ₹48,600 |
| 10.00 | Use and waste of formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work, not exceeding 200mm thick (horizontal or sloping), complete all as specified and as directed. | 65 | Sqm | 450 ₹29,250 | 400 ₹26,000 | 220 ₹14,300 Lowest | 599 ₹38,935 | 500 ₹32,500 | 321 ₹20,865 | 450 ₹29,250 | 300 ₹19,500 | 540 ₹35,100 |
Tender Value
Refer Docs
EMD Value
₹97,000
Closing Date
23 Oct 2025, 6:00 pmClosed
GE (AF) BANGALORE
GE (AF) BANGALORE, HQ TC AIR FORCE , BANGALORE - 560006
SPECIAL REPAIR TO DRAINAGE SYSTEM (PHASE-I) AND ITS LODGER UNITS AT CHAFB
2025_MES_732617_1
8416/E8
Open Tender
Civil Works
Item Rate
180 days
GE (AF) BANGALORE
AS PER NIT
5 documents required · 5 mandatory
₹500
GE (AF) BANGALORE
₹97,000
31 Oct 2025
25 Sept 2025
25 Oct 2025
25 Sept 2025
23 Oct 2025
9 Oct 2025
26 Sept 2025 - 3 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tender_8416.pdf
Tender Documents • 0.53 MB
BOQ_820281.xls
BOQ • 0.54 MB
SOC_8416.pdf
Additional Documents • 0.01 MB
2Tender_8416.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .