| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.0 LAccepted-AOC N NO 6 OLD NO 10 1ST STREET KASTHURI BAI NAGAR AVADI CHENNAI 600054 | CHENNAI | CHENNAI | TAMIL NADU | 600054 | L1 | Accepted-AOC Being the lowest | |
| 2 | L2₹15.2 L+₹16,915 (1.13%)Rejected-Finance NO 5 FIRST CROSS STREET GOPALAPURAM THIRUVIKANAGAR CHENNAI 600 082 | CHENNAI | CHENNAI | TAMIL NADU | 600082 | L2 | Rejected-Finance Being other than L1 | |
| 3 | L3₹17.3 L+₹2.3 L (15.6%)Rejected-Finance 88 30 RAMASAMY GARDEN ADYAR ARUNACHALAPURAM ADYAR CHENNAI TAMIL NADU 600020 | CHENNAI | TAMIL NADU | 600020 | L3 | Rejected-Finance Being other than L1 | |
| 4 | L4₹19.3 L+₹4.3 L (28.8%)Rejected-Finance OLD NO 2C NEW NO 7 1 THANGAVELU VAITHIYAR STREET CORPORATION MIDDLE SCHOOL TRIPLICANE CHENNAI 600005 | CHENNAI | TAMIL NADU | 600005 | L4 | Rejected-Finance Being other than L1 | |
| 5 | L5₹20.7 L+₹5.7 L (37.9%)Rejected-Finance N0 15 ASHOK NAGAR MAIN ROAD MES ROAD 3RD CROSS STREET EAST TAMBARAM CHENNAI 600 059 | CHENGALPATTU | TAMIL NADU | 600059 | L5 | Rejected-Finance Being other than L1 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
16 Jul 2025, 6:55 pmClosed
Garrison Engineer (I) (CG) Chennai
Garrison Engineer (I) (CG), P-16, CGRA Meenambakkam 4th Street NGO Colony, Nanganallur, Chennai 600 061
MAINTENANCE AND REPAIRS/PAINTING TO DISPERSAL AREA, APRON AREA AND HANGERS INSIDE AT ICGAS CHENNAI
2025_MES_715968_1
8222/E8
Open Tender
Civil Works
Item Rate
122 days
CHENNAI
As per tender documents
6 documents required · 6 mandatory
₹500
Garrison Engineer (I)(CG) Chennai
₹40,000
Yes
3 Aug 2025
21 Jun 2025
18 Jul 2025
21 Jun 2025
16 Jul 2025
3 Jul 2025
21 Jun 2025 - 26 Jun 2025
Amount
Removing the existing sealing compound and widening of expansion joint 25mm to 30mm width of rigid pavement by using joint cutting machine upto a depth of 45mm with cutting blade of appropriate size to make straight and smooth edge and removal of rubbish girt etc using suitable tools including air compressor cleaning concrete debris washing etc complete all as directed
Removing the existing sealing compound and widening of construction/dummy joint 12mm to 15mm width of rigid pavement by using joint cutting machine upto a depth of 31mm with cutting blade of appropriate size to make straight and smooth edge and removal of rubbish girt etc using suitable tools including air compressor cleaning concrete debris washing etc complete all as directed
Material and labour for making good of cracks, joints, pot hole stuffer in slabs (exposed rigid pavement) by 'CONCRE-FLO' Streaming Concrete Crack Stuffer of M/s Srijan Systems Pvt Ltd or equivalent of other specified makes in expansion/construction/dummy joint of following as per manufacturer's instruction and as directed by the Engineer-in-Charge.
Expansion joints 25 mm to 30 mm wide x upto 45mm deep over 30mm dia expanded baker rod
Construction/Dummy joints 12 to 15mm wide x upto 31mm deep over 15mm dia expanded backer rod
Material and labour for preparing joints by cutting, racking out existing cracks from joints of flexible pavements including raking spilled out dust blow or sweep out racks, removing all vegetation, dust, debris and laying 3MM THICK 'RUN-PATCH' of M/s Srijan Systems Pvt Ltd or its equivalent of other specified makes fixed with suitable adhesive to achieve required strength all as per manufacture instructions complete all as specified and as directed by Engineer-in-Charge. Note : Material shall be approved by Engr-in-charge in consultation with user. Contractor shall have no claim whatsoever on this account.
Material and labour for preparing the existing surface preparaton of gangway yellow, black and red marking on the floor by shot blasting scarification and cleaning by wire brushing etc., to remove all dirt, oil etc to expose clean sound base concrete Floor and excisting floor.
Material and labour for applying 150 mm (6 inches) width Gangway Yellow line marking in executor concrete floors, fixing of masking tapes on both sides and prepare and apply two coats of single component Cold Applied Water Based Acrylic Road Marking Paint ShaliMark® WB 60 of M/s STP Ltd or its equivalent of other specified makes within the reference lines by airless spray / roller / brush. In case of airless spray with specific gravity of 1.50 - 1.60, ensure that nozzle pressure is 1800 to 2200 psi with an orifice size ranging between 19 thou to 23 thou. and removing the masking tape followed by neat finish complete all as specified and as directed.
Material and Labour for 50 mm (2 inches) width Gangway Black line marking on both side of Yellow line marking in executor concrete floors, fixing of masking tapes on both sides and prepare and apply two coats of single component Cold Applied Water Based Acrylic Road Marking Paint ShaliMark® WB 60 within the reference lines by airless spray / roller / brush. In case of airless spray with specific gravity of 1.50 - 1.60, ensure that nozzle pressure is 1800 to 2200 psi with an orifice size ranging between 19 thou to 23 thou. and removing the masking tape followed by neat finish complete all as specified and as directed.
Material and Labour for 150 mm (6 inches) width Gangway Yellow line marking in excisting Epoxy flooring, fixing of masking tapes on both sides of the line and apply two component, epoxy-based Primer ShaliPrime® 2E or its equivalent of other specified makes on well prepared surface by brush or roller at a rate of 250 gm / Sqm and allow it to dry for 6 to 8 hrs. Over the primer coat apply Two coats of high build Epoxy floor coating with high resistance to abrasion of ShaliFloor® TC 2HBE or its equivalent of other specified makes as per manufacturer's instructions and as detailed below:-.
(a) Stir the Component A and Component B of ShaliFloor® TC 2HBE separately. If settling is observed in the Component A, loosen the settled material with the help of hand stirrer followed by power driven stirrer for quick homogenous mixing. Mix hardener gradually into the base under continuous stirring. (b) After mixing, apply first cot of ShaliFloor® TC 2HBE by brush or roller to the required thickness on the dried primer and allow first coat to dry for 10-12 hours to become tack free and then apply a Second coat of ShaliFloor® TC 2HBE by brush/roller/ airless spray perpendicular to the first coat for cross linkage and to cover any blemishes of the first coatas per the manufacturers instructions. (c) Generally, second coat shall be applied after overnight curing of first coat.
Material and Labour for 50 mm (2 inches) width Gangway Black line marking on both side of Yellow line marking in excisting Epoxy flooring, fixing of masking tapes on both sides of the line and apply two component, epoxy-based Primer ShaliPrime® 2E or its equivalent of other specified makes on well prepared surface by brush or roller at a rate of 250 gm / Sqm and allow it to dry for 6 to 8 hrs. Over the primer coat apply Two coats of high build Epoxy floor coating with high resistance to abrasion of ShaliFloor® TC 2HBE or its equivalent of other specified makes as per manufacturer's instructions and as detailed below:-.
(a) Stir the Component A and Component B of ShaliFloor® TC 2HBE separately. If settling is observed in the Component A, loosen the settled material with the help of hand stirrer followed by power driven stirrer for quick homogenous mixing. Mix hardener gradually into the base under continuous stirring. (b) After mixing, apply first cot of ShaliFloor® TC 2HBE by brush or roller to the required thickness on the dried primer and allow first coat to dry for 10-12 hours to become tack free and then apply a Second coat of ShaliFloor® TC 2HBE by brush/roller/ airless spray perpendicular to the first coat for cross linkage and to cover any blemishes of the first coatas per the manufacturers instructions. (c) Generally, second coat is applied after overnight curing of first coat.
Material and Labour for 100 mm (4 inches) width Gangway Red line marking in excisting Epoxy flooring, fixing of masking tapes on both sides of the line and apply two component, epoxy-based Primer ShaliPrime® 2E or its equivalent of other specified makes on well prepared surface by brush or roller at a rate of 250 gm / Sqm and allow it to dry for 6 to 8 hrs. Over the primer coat apply Two coats of high build Epoxy floor coating with high resistance to abrasion of ShaliFloor® TC 2HBE or its equivalent of other specified makes as per manufacturer's instructions and as detailed below:-.
(a) Stir the Component A and Component B of ShaliFloor® TC 2HBE separately. If settling is observed in the Component A, loosen the settled material with the help of hand stirrer followed by power driven stirrer for quick homogenous mixing. Mix hardener gradually into the base under continuous stirring. (b) After mixing, apply first cot of ShaliFloor® TC 2HBE by brush or roller to the required thickness on the dried primer and allow first coat to dry for 10-12 hours to become tack free and then apply a Second coat of ShaliFloor® TC 2HBE by brush/roller/ airless spray perpendicular to the first coat for cross linkage and to cover any blemishes of the first coatas per the manufacturers instructions. (c) Generally, second coat is applied after overnight curing of first coat.
SHREERAMFOUNDATION (BID ID -3361344)
YOGAA MANPOWER AGENCY (BID ID -3359612)
NAVEEN ENTERPRIESES (BID ID -3355571)
M/s KM Marimuthu Achary (BID ID -3353087)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .