Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.3 LAccepted-AOC 85 PANNADI KATTUVALAVU THOTTILPATTY SALEM CAMP METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | ₹2.3 L Quoted ₹2.0 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | aarthiconstruction L1 |
|---|---|---|---|---|
| 1.00 | Charges for cleaning the entire boiler structures, Buckstay beams, cable trays, walkways, staircase, handrail pipes, Burner corners, pipelines of various systems, PRDS system etc. free from fly ash, coal powder deposit etc. by using the Service air after the overhaul works of Boiler, including APH floors and Hot PA and SA ducts inside the boiler house including cleaning & Water washing the boiler ground floor area after overhauling of Boiler | 1 | Time | 1,89,200 ₹1.9 L |
| 2.00 | Charges for removal of all solid waste like cotton/wool waste, insulating materials and welding rod cut bits, spillage of oil etc. from boiler 0 mtr to 52 mtr floor areas and devolution of metal scrap to Central Stores/MTPS-I.(Lorry will be provided by board at free of cost ) | 1 | Time | 13,600 ₹13,600 |
| 3.00 | Charges for Consumables & Hire charges for T&Ps | 1 | LS | 1,500 ₹1,500 |
Tender Value
Refer Docs
EMD Value
₹2,100
Closing Date
18 Aug 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit IV Boiler Pressure Parts AOH 2025 Cleaning of boiler structures from 0 to 52 m Level etc
2025_EB_588947_1
CE / MTPS-I / SE / M-I / BM /OT. 200 / 2025-26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹2,100
Yes
27 May 2026
4 Aug 2025
19 Aug 2025
4 Aug 2025
18 Aug 2025
4 Aug 2025
Amount
Charges for cleaning the entire boiler structures, Buckstay beams, cable trays, walkways, staircase, handrail pipes, Burner corners, pipelines of various systems, PRDS system etc. free from fly ash, coal powder deposit etc. by using the Service air after the overhaul works of Boiler, including APH floors and Hot PA and SA ducts inside the boiler house including cleaning & Water washing the boiler ground floor area after overhauling of Boiler
Charges for removal of all solid waste like cotton/wool waste, insulating materials and welding rod cut bits, spillage of oil etc. from boiler 0 mtr to 52 mtr floor areas and devolution of metal scrap to Central Stores/MTPS-I.(Lorry will be provided by board at free of cost )
Charges for Consumables & Hire charges for T&Ps
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid