Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹34.4 LAccepted-AOC | 1 | Accepted-AOC L1 |
Tender Value
Refer Docs
Closing Date
17 May 2022, 3:00 pmClosed
DGM(Contracts)
R and D Centre , Faridabad
Inspection and Maintenance Support Contract for wartsila make 4.1 MW Diesel based DG set and its accessories for three years 2022-25.
2022_RND_150880_1
RDCCSt2204
Single
Services
Works
1095 days
R and D Centre
Please refer Tender documents.
2 documents required · 2 mandatory
Exempted
3 Nov 2023
9 May 2022
18 May 2022
9 May 2022
17 May 2022
9 May 2022
Amount
Yearly visit for inspection of Wartsila
1ST YEAR INSPECTION VISIT: 1st Year visits : One Mech. & one Electrical Service Engineer(s) will visit for routine check at quarterly intervals (i.e after three months) for AMC as per the details given in scope of work and direction of the EIC. Other than the routine AMC visit, Service engineers to be deputed for electrical and mechanical trouble shooting as and when required as directed by EIC.
2ND YEAR INSPECTION VISIT : 2nd Year visits : One Mech. & one Electrical Service Engineer(s) will visit for routine check at quarterly intervals (i.e after three months) for AMC as per the details given in scope of work and direction of the EIC. Other than the routine AMC visit, Service engineers to be deputed for electrical and mechanical trouble shooting as and when required as directed by EIC.
3RD YEAR INSPECTION VISIT : 3rd Year visits : One Mech. & one Electrical Service Engineer(s) will visit for routine check at quarterly intervals (i.e after three months) for AMC as per the details given in scope of work and direction of the EIC. Other than the routine AMC visit, Service engineers to be deputed for electrical and mechanical trouble shooting as and when required as directed by EIC.
Maintenance based on running hours
8000 hrs internal overhaul as per scope of work defined in Scope of work
Turbocharger overhaul as per the details mentioned in scope of work.
Overhaul of turbocharager
Balancing of rotor
Removal and reinstallation of gas inlet
Minor overhauling of LO separator as per the details mentioned in scope of work.
Major overhauling of LO separator as per the details mentioned in scope of work.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .