Tender Value
Refer Docs
EMD Value
₹26,000
Closing Date
12 Oct 2021, 2:00 pmClosed
Executive Engineer
Office of the Executive Engineer Electric Division Vijaypur
Augmentation of Transformer SubStations from Existing Capacity of 25 KVA to 63 KVA and 100 KVA, 63 KVA to 100 KVA and 250 KVA, 100KVA to 250 KVA , 250 KVA to 400 KVAand 400 KVA to 630 KVA on turnkey basis within the jurisdiction of ED Vijaypur
2021_PDD_138886_1
EDV/ 29 of 2021-22 Dated 11-09-2021
Open Tender
Electrical Works
Turn-key
30 days
Samba District
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
Executive Engineer Electric Division Vijaypur
₹26,000
Office of the Executive Engineer at Vijaypur
1 Jan 2022
11 Sept 2021
13 Oct 2021
13 Sept 2021
12 Oct 2021
13 Sept 2021
13 Sept 2021 - 4 Oct 2021
23 Sept 2021
Amount
Scope of work for Augmentation of 25 KVA Distribution Transformer to 63 KVA
Supply, Installation & commissioning of 11/0.433 KV, 63 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Aluminium Wound) alongwith LV Cable Box having detachable Alumnium Gland plate including Transportation
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,Vertical Type
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Supply Installation, Testing & Commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA withpolymer housing, Stn. Type
Providing & Fixing of 95 mm² Single Phase Cable, 1.1 KV grade,PVC insulated Stranded conductor FRLS type(44 mtrs for each)
Providing & Fixing of LT Distribution Box for 63 KVA DTR with MCCB for incomer & switch fuse unit for Out Going Ckts.
Providing of Earthing of Sub-Station - Excavation of Earth Pit650mm and depth 3000mm , Installation of Earth Pipe of 40 mm of nominal bore & 4 mm wall thickness with length 2.5 Mtr long as per IS 1239, GI Strip for neutral Earthing of Size 25mm x3mm thickness for connection of Transformer Body, GO Set, LA Set as per IS 2629/85 GI nuts and bolts refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover(3per S/stn)
Providing & fixing of Transformer Bed (60kg each)
Supply Erection Testing & commissioning of 9 mtrs ST poles(ST-410 SP33)
Cement bottoming 1:2:4 mix as per REC Standards 0.5cum/pole
Dismentalling of old 25 KVA transformer along with allied material
Transportaion of Dismentalled distribution Transformer along with allied material from dismentalling Site to Divisional Stores at Vijaypur
Scope of work for Augmentation of 25 KVA Distribution Transformer to 100 KVA
Supply, Installation & commissioning of 11/0.433 KV, 100 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Aluminium Wound) alongwith LV Cable Box having detachable Alumnium Gland plate including Transportation
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,Vertical Type
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Supply Installation, Testing & Commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA withpolymer housing, Stn. Type
Providing & Fixing of 120 mm² Single Phase Cable, 1.1 KV grade,PVC insulated Stranded conductor FRLS type(44 mtrs for each)
Providing & Fixing of LT Distribution Box for 100 KVA DTR with MCCB for incomer & switch fuse unit for Out Going Ckts.
Providing of Earthing of Sub-Station - Excavation of Earth Pit650mm and depth 3000mm , Installation of Earth Pipe of 40 mm of nominal bore & 4 mm wall thickness with length 2.5 Mtr long as per IS 1239, GI Strip for neutral Earthing of Size 25mm x3mm thickness for connection of Transformer Body, GO Set, LA Set as per IS 2629/85 GI nuts and bolts refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover(3per S/stn)
Providing & fixing of Transformer Bed (60kg each)
Supply Erection Testing & commissioning of 9 mtrs ST poles(ST-410 SP33)
Cement bottoming 1:2:4 mix as per REC Standards 0.5cum/pole
Dismentalling of old 25 KVA transformer along with allied material
Transportaion of Dismentalled distribution Transformer along with allied material from dismentalling Site to Divisional Stores at Vijaypur
Scope of work for Augmentation of 63 KVA Distribution Transformer to 100 KVA
Supply, Installation & commissioning of 11/0.433 KV, 100 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Aluminium Wound) alongwith LV Cable Box having detachable Alumnium Gland plate including Transportation
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,Vertical Type
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Supply Installation, Testing & Commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA withpolymer housing, Stn. Type
Providing & Fixing of 120 mm² Single Phase Cable, 1.1 KV grade,PVC insulated Stranded conductor FRLS type(44 mtrs for each)
Providing & Fixing of LT Distribution Box for 100 KVA DTR with MCCB for incomer & switch fuse unit for Out Going Ckts.
Providing of Earthing of Sub-Station - Excavation of Earth Pit650mm and depth 3000mm , Installation of Earth Pipe of 40 mm of nominal bore & 4 mm wall thickness with length 2.5 Mtr long as per IS 1239, GI Strip for neutral Earthing of Size 25mm x3mm thickness for connection of Transformer Body, GO Set, LA Set as per IS 2629/85 GI nuts and bolts refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover(3per S/stn)
Providing & fixing of Transformer Bed (60kg each)
Supply Erection Testing & commissioning of 9 mtrs ST poles(ST-410 SP33)
Cement bottoming 1:2:4 mix as per REC Standards 0.5cum/pole
Dismentalling of old 63 KVA transformer along with allied material
Transportaion of Dismentalled distribution Transformer along with allied material from dismentalling Site to Divisional Stores at Vijaypur
Scope of work for Augmentation of 63 KVA Distribution Transformer to 250 KVA
Supply, Installation & commissioning of 11/0.433 KV, 250 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Copper Wound) alongwith LV Cable Box having detachable Alumnium Gland plate including Transportation
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,Vertical Type
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Supply Installation, Testing & Commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA withpolymer housing, Stn. Type
Providing & Fixing of 185 mm² Double Circuit Single Core Cable, 1.1 KV grade,PVC insulated Stranded conductor FRLS type(44 mtrs for each)
Providing & Fixing of LT Distribution Box for 250 KVA DTR with MCCB for incomer & switch fuse unit for Out Going Ckts.
Providing of Earthing of Sub-Station - Excavation of Earth Pit650mm and depth 3000mm , Installation of Earth Pipe of 40 mm of nominal bore & 4 mm wall thickness with length 2.5 Mtr long as per IS 1239, GI Strip for neutral Earthing of Size 25mm x3mm thickness for connection of Transformer Body, GO Set, LA Set as per IS 2629/85 GI nuts and bolts refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover(3per S/stn)
Providing & fixing of Transformer Bed (60kg each)
Supply Erection Testing & commissioning of 9 mtrs ST poles(ST-410 SP33)
Cement bottoming 1:2:4 mix as per REC Standards 0.5cum/pole
Dismentalling of old 63 KVA transformer along with allied material
Transportaion of Dismentalled distribution Transformer along with allied material from dismentalling Site to Divisional Stores at Vijaypur
Scope of work for Augmentation of 100 KVA Distribution Transformer to 250 KVA
Supply, Installation & commissioning of 11/0.433 KV, 250 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Copper Wound) alongwith LV Cable Box having detachable Alumnium Gland plate including Transportation
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,Vertical Type
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Supply Installation, Testing & Commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA withpolymer housing, Stn. Type
Providing & Fixing of 185 mm² Double Circuit Single core Cable, 1.1 KV grade,PVC insulated Stranded conductor FRLS type(44 mtrs for each)
Providing & Fixing of LT Distribution Box for 250 KVA DTR with MCCB for incomer & switch fuse unit for Out Going Ckts.
Providing of Earthing of Sub-Station - Excavation of Earth Pit650mm and depth 3000mm , Installation of Earth Pipe of 40 mm of nominal bore & 4 mm wall thickness with length 2.5 Mtr long as per IS 1239, GI Strip for neutral Earthing of Size 25mm x3mm thickness for connection of Transformer Body, GO Set, LA Set as per IS 2629/85 GI nuts and bolts refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover(3per S/stn)
Providing & fixing of Transformer Bed (60kg each)
Supply Erection Testing & commissioning of 9 mtrs ST poles(ST-410 SP33)
Cement bottoming 1:2:4 mix as per REC Standards 0.5cum/pole
Dismentalling of old 100 KVA transformer along with allied material
Transportaion of Dismentalled distribution Transformer along with allied material from dismentalling Site to Divisional Stores at Vijaypur
Scope of work for Augmentation of 250 KVA Distribution Transformer to 400 KVA
Supply, Installation & commissioning of 11/0.433 KV, 400 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Copper Wound) alongwith LV Cable Box having detachable Alumnium Gland plate including Transportation
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,Vertical Type
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Supply Installation, Testing & Commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA withpolymer housing, Stn. Type
Providing & Fixing of 240 mm² Double Circuit Single Core Cable, 1.1 KV grade,PVC insulated Stranded conductor FRLS type(44 mtrs for each)
Providing & Fixing of LT Distribution Box for 400 KVA DTR with MCCB for incomer & switch fuse unit for Out Going Ckts.
Providing of Earthing of Sub-Station - Excavation of Earth Pit650mm and depth 3000mm , Installation of Earth Pipe of 40 mm of nominal bore & 4 mm wall thickness with length 2.5 Mtr long as per IS 1239, GI Strip for neutral Earthing of Size 25mm x3mm thickness for connection of Transformer Body, GO Set, LA Set as per IS 2629/85 GI nuts and bolts refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover(3per S/stn)
Providing & fixing of Transformer Bed/ Cement Concrete Plate form
Supply Erection Testing & commissioning of 9 mtrs ST poles(ST-410 SP33)
Cement bottoming 1:2:4 mix as per REC Standards 0.5cum/pole
Dismentalling of old 250 KVA transformer along with allied material
Transportaion of Dismentalled distribution Transformer along with allied material from dismentalling Site to Divisional Stores at Vijaypur
Scope of work for Augmentation of 400 KVA Distribution Transformer to 630 KVA
Supply, Installation & commissioning of 11/0.433 KV, 630 KVA 3-Phase Distribution Transformer with Bi-metallic terminal Connectors, Energy Level: 2, "BIS Marked" (Copper Wound) alongwith LV Cable Box having detachable Alumnium Gland plate including Transportation
Supply, Installation, Testing & Commissioning of 11kV GO, AB Switch 3-Phase, 3-Pole, 200 Amp,Vertical Type
Supply, Installation, Testing & Commissioning of 11 kV Horn Gap Fuse Set 3 Phase 200A
Supply Installation, Testing & Commissioning of Gapless Surge Arrestor,9 kV ,10 kA ,LA withpolymer housing, Stn. Type
Providing & Fixing of 400 mm² Double Circuit Single Core Cable, 1.1 KV grade,PVC insulated Stranded conductor FRLS type(44 mtrs for each)
Providing & Fixing of LT Distribution Box for 630 KVA DTR with MCCB for incomer & switch fuse unit for Out Going Ckts.
Providing of Earthing of Sub-Station - Excavation of Earth Pit650mm and depth 3000mm , Installation of Earth Pipe of 40 mm of nominal bore & 4 mm wall thickness with length 2.5 Mtr long as per IS 1239, GI Strip for neutral Earthing of Size 25mm x3mm thickness for connection of Transformer Body, GO Set, LA Set as per IS 2629/85 GI nuts and bolts refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover(3per S/stn)
Providing & fixing of Transformer Bed/ Cement Concrete Plate form
Supply Erection Testing & commissioning of 9 mtrs ST poles(ST-410 SP33)
Cement bottoming 1:2:4 mix as per REC Standards 0.5cum/pole
Dismentalling of old 400 KVA transformer along with allied material
Transportaion of Dismentalled distribution Transformer along with allied material from dismentalling Site to Divisional Stores at Vijaypur
M/S RATHER CONSTRUCTIONS AND TRADERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .