Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹42,820
Closing Date
29 Sept 2026, 2:00 pm2d left
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
230/110/33-11KV Oragadam Substation
2026_EB_704722_1
OT-28/2026-27 of SE/GCC-II/CNI
Open Tender
Civil Works
Works
120 days
Oragadam
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹42,820
Yes
15 Sept 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
29 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing juliflora jungle with uprooting including all cost of labour ,lead, lift etc., complete. | 222 | M2 | - | - |
| 2 | Earth work excavation in hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders, hard gravelly soil and depositing on bank with initial lead of 10m and lift of 2m etc. | 494 | M3 | - | - |
| 3 | Supplying and filling in foundation and basement with filling sand in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 37.45 | M3 | - | - |
| 4 | Re filling in foundation with excavated earth in layers not more than 15 cm thick well rammed and watered consolidated etc complete as per standard specification | 10 | M3 | - | - |
| 5 | Laying PCC 1:3:6 mix using 20mm HBG machine crushed metal for foundation matt concrete including cost of all labour, materials, lead, lift, curing etc. Complete. | 37.15 | M3 | - | - |
| 6 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. | 131 | M3 | - | - |
| 7 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal with form work including cost of all materials, curing, labour, lead, lift etc. complete. as per standard specification as directed by the dept. Engineer at site. For Precast slab | 17.55 | M3 | - | - |
| 8 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc.complete. | 10.05 | MT | - | - |
| 9 | Fabriaction, galvanising and supply of foundation bolt and nuts with 2 nos.washer in High Tensile Steel including 10 cm L at bottom and 15 cm threading with 2 nuts and washers at top including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site | 355.68 | Kgs | - | - |
| 10 | Fabrication of Template and assembling in correct position for various equipment plinth and grouting the foundation bolts including cost of all materials, labour, lead, lift etc. complete.as directed by the dept. Engineer at site | 9 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_847084.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .