| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC BANPHUL SEUZ PATH LAST GATE DISPUR GUWAHATI 781006 | GUWAHATI | KAMRUP METRO | ASSAM | 781006 | ₹2.6 Cr | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹2.8 Cr+₹11.8 L (4.48%)Rejected-Finance H NO 9 BISHNU JYOTI PATH HATIGAON GUWAHATI | KAMRUP METRO | ASSAM | 781001 | ₹2.8 Cr+₹11.8 L (4.48%) | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹2.8 Cr+₹16.9 L (6.41%)Rejected-Finance | ₹2.8 Cr+₹16.9 L (6.41%) | L3 | Rejected-Finance L3 BIDDER |
| 4 | L4₹2.9 Cr+₹24.1 L (9.12%)Rejected-Finance | ₹2.9 Cr+₹24.1 L (9.12%) | L4 | Rejected-Finance L4 BIDDER |
| 5 | L5₹3.3 Cr+₹63.0 L (23.9%)Rejected-Finance | ₹3.3 Cr+₹63.0 L (23.9%) | L5 | Rejected-Finance L5 BIDDER |
Tender Value
₹2.9 Cr
EMD Value
₹5.8 L
Closing Date
26 Dec 2023, 12:00 pmClosed
The CGM, OnM (LAR), AEGCL
AEGCL, Bijulee Bhawan, Paltan Bazar, Guwahati-01
Construction of 3 (three) Nos. of new tower with pile foundation in place of river eroded tower at Loc- 451, 452 and 453 of 220 KV D/C Rangia-Salakati Line
2023_AEGCL_34353_1
/Tech-314/RNG-SLKT/Restoration work
Open Tender
Electrical Works
Works
180 days
Rangia
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
₹5.8 L
7 Mar 2024
2 Dec 2023
28 Dec 2023
2 Dec 2023
26 Dec 2023
2 Dec 2023
2 Dec 2023 - 9 Dec 2023
Amount
Super structure
Super structure (DC+6) at loc. 451
Galvanized iron superstructure (DC+6) inclusive of galvanized D shackle, pack washer, spring washer, step bolt, nuts and bolts etc.
Stub and cleat (partly galvanized)
Stub and stub setting template
Super structure (DC+9) at loc. 452
Galvanized iron superstructure (DC+6) inclusive of galvanized D shackle, pack washer, spring washer, step bolt, nuts and bolts etc.
Stub and cleat (partly galvanized)
Stub and stub setting template
Super structure (DD+9) at loc. 453
Galvanized iron superstructure (DC+6) inclusive of galvanized D shackle, pack washer, spring washer, step bolt, nuts and bolts etc.
Stub and cleat (partly galvanized)
Stub and stub setting template
Tower accessories
Supply of Danger plate
Supply of Phase plate (set of three)
Supply of Number plate
Supply of Anti-Climbing device
Conductor Accessories
Single tension Hardware fittings (Dead end type) including all aceessories suitable for AAAC Zebra
Double tension Hardware fittings (Dead end type) including all aceessories suitable for AAAC Zebra
Ground wire accessories
GI Ground wire
Strain clamp
Cooper earth bond
Power Conductor
AAAC Zebra Conductor (37/4 mm)
Description of Work / Item(s)
Amount
Super structure
Super structure (DC+6) at loc. 451
Galvanized iron superstructure (DC+6) inclusive of galvanized D shackle, pack washer, spring washer, step bolt, nuts and bolts etc.
Stub and cleat (partly galvanized)
Stub and stub setting template
Super structure (DC+9) at loc. 452
Galvanized iron superstructure (DC+6) inclusive of galvanized D shackle, pack washer, spring washer, step bolt, nuts and bolts etc.
Stub and cleat (partly galvanized)
Stub and stub setting template
Super structure (DD+9) at loc. 453
Galvanized iron superstructure (DC+6) inclusive of galvanized D shackle, pack washer, spring washer, step bolt, nuts and bolts etc.
Stub and cleat (partly galvanized)
Stub and stub setting template
Tower accessories
Supply of Danger plate
Supply of Phase plate (set of three)
Supply of Number plate
Supply of Anti-Climbing device
Conductor Accessories
Single tension Hardware fittings (Dead end type) including all aceessories suitable for AAAC Zebra
Double tension Hardware fittings (Dead end type) including all aceessories suitable for AAAC Zebra
Ground wire accessories
GI Ground wire
Strain clamp
Cooper earth bond
Power Conductor
AAAC Zebra Conductor (37/4 mm)
Description of Work / Item(s)
Amount
Construction of Pile Foundation(Type DD+6, Qty -1 )
Detail & check survey as per specification
Mobilization (including preparation of work space, Approach road, dewatering, arrangement of electricity, jungle clearing, earth filling and making all arrangement for completion of the work) and construction and supply of all materials & labours of temporary island/platform to faciallitate the construction of foundation including platform for storage of construction materials such as stone chips, sand, cement, steel reinforcement bar, mixture machines, tools & plants all foundation materials keeping & mixing.
Providing ,driving with hydralic piling rigs with power unit and installing driven cast-in-situ reinforced cement concrete piles of grade M25 including the cost of reinforcement steel, cost of boring with temporary guide casting bentonite solution (length of the pile for payment shall be measured from the bottom of pile cap). All necessary labour materials plants, tools and tackles etc. complete as necessary for proper execution of the job. The pile top should be chipped of to remove laitance concrete above cut off level 1m from the top of the pile (no additional payment shall be done) The unit rate should include excavation, dewatering, socketing, anchoring (if required), backfilling, form work for placing plain or reinforced cement concrete, supply & providing MS liner of 6 mm thick in piles up to 10 metre depth from the bottom of the pile cap, conducting standard penetration test and integrity test. Each leg will require 1 nos RCC bored pile of 1200 mm diameter i.e. 4 nos of pile each tower foundation. (Payment will be made as per actual length of the piles as per site condition necessary and approved drawing.) (A) 1200 mm dia piles 4 nos of pile: 4 X 28 = 112
Providing and laying in M25 grade concrete of specified 28 days strength for pile cap, chimney and tie beam including reinforcement steel form work all necessary materials and equipments, transportation, batching, mixing, vibrating, dewatering etc. complete. Chimney = 4 X 3.14159 X 0.60 X 0.60 X 3.50 = 15.834 Tie- Beam =4 X 11.394 X 0.50 X 0.75 = 17.091 Total = 32.925
Setting of stubs (sets of four) including transportation & distribution of stub and accessories from store to site excluding the cost of excavation, concreting & back filling.
Description of Work / Item(s)
Amount
Construction of Pile Foundation(Type DD+9, Qty -1 )
Detail & check survey as per specification
Mobilization (including preparation of work space, Approach road, dewatering, arrangement of electricity, jungle clearing, earth filling and making all arrangement for completion of the work) and construction and supply of all materials & labours of temporary island/platform to faciallitate the construction of foundation including platform for storage of construction materials such as stone chips, sand, cement, steel reinforcement bar, mixture machines, tools & plants all foundation materials keeping & mixing.
Providing ,driving with hydralic piling rigs with power unit and installing driven cast-in-situ reinforced cement concrete piles of grade M25 including the cost of reinforcement steel, cost of boring with temporary guide casting bentonite solution (length of the pile for payment shall be measured from the bottom of pile cap). All necessary labour materials plants, tools and tackles etc. complete as necessary for proper execution of the job. The pile top should be chipped of to remove laitance concrete above cut off level 1m from the top of the pile (no additional payment shall be done) The unit rate should include excavation, dewatering, socketing, anchoring (if required), backfilling, form work for placing plain or reinforced cement concrete, supply & providing MS liner of 6 mm thick in piles up to 10 metre depth from the bottom of the pile cap, conducting standard penetration test and integrity test. Each leg will require 1 nos RCC bored pile of 1200 mm diameter i.e. 4 nos of pile each tower foundation. (Payment will be made as per actual length of the piles as per site condition necessary and approved drawing.) (A) 1200 mm dia piles 4 nos of pile: 4 X 28 = 112
Providing and laying in M25 grade concrete of specified 28 days strength for pile cap, chimney and tie beam including reinforcement steel form work all necessary materials and equipments, transportation, batching, mixing, vibrating, dewatering etc. complete. Chimney = 4 X 3.14159 X 0.60 X 0.60 X 3.50 = 15.834 Tie- Beam =4 X 11.379 X 0.50 X 0.75 = 17.069 Total = 32.902
Setting of stubs (sets of four) including transportation & distribution of stub and accessories from store to site excluding the cost of excavation, concreting & back filling.
Description of Work / Item(s)
Amount
Construction of Pile Foundation(Type DD+9, Qty -1 )
Detail & check survey as per specification
Mobilization (including preparation of work space, Approach road, dewatering, arrangement of electricity, jungle clearing, earth filling and making all arrangement for completion of the work) and construction and supply of all materials & labours of temporary island/platform to faciallitate the construction of foundation including platform for storage of construction materials such as stone chips, sand, cement, steel reinforcement bar, mixture machines, tools & plants all foundation materials keeping & mixing.
Providing ,driving with hydralic piling rigs with power unit and installing driven cast-in-situ reinforced cement concrete piles of grade M25 including the cost of reinforcement steel, cost of boring with temporary guide casting bentonite solution (length of the pile for payment shall be measured from the bottom of pile cap). All necessary labour materials plants, tools and tackles etc. complete as necessary for proper execution of the job. The pile top should be chipped of to remove laitance concrete above cut off level 1m from the top of the pile (no additional payment shall be done) The unit rate should include excavation, dewatering, socketing, anchoring (if required), backfilling, form work for placing plain or reinforced cement concrete, supply & providing MS liner of 6 mm thick in piles up to 10 metre depth from the bottom of the pile cap, conducting standard penetration test and integrity test. Each leg will require 1 nos RCC bored pile of 1200 mm diameter i.e. 4 nos of pile each tower foundation. (Payment will be made as per actual length of the piles as per site condition necessary and approved drawing.) (A) 1200 mm dia piles 4 nos of pile: 4 X 28 = 112
Providing and laying in M25 grade concrete of specified 28 days strength for pile cap, chimney and tie beam including reinforcement steel form work all necessary materials and equipments, transportation, batching, mixing, vibrating, dewatering etc. complete. Chimney = 4 X 3.14159 X 0.60 X 0.60 X 3.50 = 15.834 Tie- Beam =4 X 12.551 X 0.50 X 0.75 = 18.827 Total = 34.660
Setting of stubs (sets of four) including transportation & distribution of stub and accessories from store to site excluding the cost of excavation, concreting & back filling.
Description of Work / Item(s)
Amount
Erection and dismantling of ERS
Dismantling of ERS towers including de-anchoring
ERS tower material shifting from work site to the site camp by head loading
ERS tower material sorting, loading and carrying from camp site and unloading at Kahilipara store. Weight per ERS= 5.2 MT 1st (30KM)
For next 55KM Weight of 2 Nos. of ERS= 8X2= 16MT 55 KM X 16 MT= 880 KM/MT
Description of Work / Item(s)
Amount
Erection of super structure at loc. 451, 452 and 453
At loc. 451 (DC+6), weight: 10.142 MT
At loc. 452 (DC+9), weight: 11.076 MT
At loc. 453 (DD+9), weight: 12.855 MT
Stringing of conductors in between tower loc. 450 to Loc.No.-454
Stringing of conductors including all hardware fittings Span length (450-454): 1589 mtrs = 1.589 kMs For both ckts: 1.589 X 2 = 3.178 kMs
Jumpering of all jumpers in both circuits at loc. 450,451,452,453 and 454 Total: 30 nos. for both ckt-1 and ckt-2
Stringing of ground wire from loc. 450 to 454 Total distance : 1.589 Ckm
Dismantling of conductors in between tower loc. 450 to Loc.No.-454
Opening and lowering of conductors including all hardware fittings Span length (450-454): 1589 mtrs = 1.594 kMs Total conductors : 06 (ckt-1 and ckt-2) 1.594 kMs X 6 nos = 9.564 kMs
De-jumpering of all jumpers in both circuits at loc. 450,451,453 and 454 Total: 24 nos. for both ckt-1 and ckt-2
De-Stringing of ground wire from loc. 450 to 454 Total distance : 1.594 Ckm
Earthing per tower including supply of all earthing materials
Painting of towers with bituminous paints of approved quality to 3 mts from ground level including the cost of the paint. (Loc.No.-451,452 & 453)
Dismantling of complete towers at loc. 451 and 453 and transport the same to Rangia Store
At 451 (DB+9) , weight: 9.005 MT
At 453 (DD+9) , weight: 12.855 MT
M/s Habibar Rahman
Vision Engineers
M/S POWER GRID ASSOCIATES
KAZI MAHMADUL HASSAN
KAZI MAHMADUL HASSAN
Sun Steel Industries Pvt Ltd
M/S POWER GRID ASSOCIATES
M/s Habibar Rahman
KAZI MAHMADUL HASSAN
M/S POWER GRID ASSOCIATES
Sun Steel Industries Pvt Ltd
Vision Engineers
KAZI MAHMADUL HASSAN
M/S POWER GRID ASSOCIATES
Sun Steel Industries Pvt Ltd
Vision Engineers
KAZI MAHMADUL HASSAN
M/S POWER GRID ASSOCIATES
Sun Steel Industries Pvt Ltd
Vision Engineers
KAZI MAHMADUL HASSAN
M/S POWER GRID ASSOCIATES
Sun Steel Industries Pvt Ltd
M/s Habibar Rahman
KAZI MAHMADUL HASSAN
Sun Steel Industries Pvt Ltd
M/s Habibar Rahman
M/S POWER GRID ASSOCIATES
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .