| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-Finance | L1 | Accepted-Finance Lowest bid amount | |
| 2 | L2₹7.6 L+₹56,460.64 (8.07%)Rejected-Finance | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹7.6 L+₹60,981.69 (8.71%)Rejected-Finance | L3 | Rejected-Finance Not L1 |
| Sl No | Description | Qty | Unit | M/s Maa Sharda Associates L1 | Shri Krishna Construction Company L3 | RAJENDRA BHARDWAJ L2 |
|---|---|---|---|---|---|---|
| 1.00Carrying out the following works under deposit head upto the execution/completion and commissioning of works. | ||||||
| 2.00 | Carriage of 8.5 Mtr Long PCC Pole from Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) | 69 | Nos. | 800 ₹65,136 Lowest | 815 ₹66,357.3 | 810 ₹65,950.2 |
| 3.00 | Carriage of 11 Mtr Long ST Pole from Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.) | 4 | Nos. | 900 ₹4,248 Lowest | 915 ₹4,318.8 | 910 ₹4,295.2 |
| 4.00 | Carriage of 100 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends | 1 | No. | 3,500 ₹4,130 Lowest | 3,545 ₹4,183.1 | 3,540 ₹4,177.2 |
| 5.00 | Carriage of 250 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends | 2 | No. | 4,500 ₹10,620 Lowest | 4,550 ₹10,738 | 4,600 ₹10,856 |
| 6.00 | Carriage of 11 KV XLPE Cable size 3x70 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends. | 367 | Mtr. | 100 ₹43,306 Lowest | 105 ₹45,471.3 | 102 ₹44,172.12 |
| 7.00 | Carriage of ABC size 3x95 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends. | 1,439 | Mtr. | 8 ₹13,584.16 Lowest | 8.2 ₹13,923.76 | 8.5 ₹14,433.17 |
| 8.00 | Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends. | 15 | Qntl. | 300 ₹5,310 Lowest | 302 ₹5,345.4 | 305 ₹5,398.5 |
| 9.00 | Erection of single pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. | 61 | Nos. | 1,280 ₹92,134.4 Lowest | 1,295 ₹93,214.1 | 1,290 ₹92,854.2 |
| 10.00 | Erection of Double pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms. | 4 | Nos. | 5,000 ₹23,600 Lowest | 5,102 ₹24,081.44 | 5,100 ₹24,072 |
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
17 Nov 2025, 12:00 pmClosed
SE, EDC-II, Mathura
Near Kali Mata Mandir, Cant, Mathura
Electrification work of Braj Bhumi Enclave, Residential Colony, Gokul, Mathura under Deposit head in the area of EDD-Laxminagar, Mathura
2025_DVVNL_1087163_1
24/EDC-II(M)/2025-26
Open Tender
Electrical Works
Item Rate
180 days
Mathura
Please see technical documents
2 documents required · 2 mandatory
₹1,180
Dvvnl, Agra
₹7,000
27 Nov 2025
30 Oct 2025
17 Nov 2025
30 Oct 2025
17 Nov 2025
30 Oct 2025
Amount
Carrying out the following works under deposit head upto the execution/completion and commissioning of works.
Carriage of 8.5 Mtr Long PCC Pole from Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of 11 Mtr Long ST Pole from Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70 Kms.)
Carriage of 100 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends
Carriage of 250 KVA Transformer from Store Centre, Mathura to pit site with loading & unloading at both ends
Carriage of 11 KV XLPE Cable size 3x70 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.
Carriage of ABC size 3x95 sq.mm. Cable form Store Center Mathura/Agra including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.
Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends.
Erection of single pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of Double pole structure 8.5 Mtrs on PCC Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Erection of Double pole structure 11 Mtrs on ST Pole by digging of pits fitting of all relevant accessories as per RESPO norms.
Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
Laying, sagging stringing and binding of Arial Bunch Conductor size 3x95 on the erected PCC pole/STP including jumpering as per RESPO manual.
Providing & fixing/filling jointing kits O/D, I/D suitable for cable size 3*70 as per direction of supervising engineer.
Mounting of 100 KVA Transformer on the Double pole/Plinth structures and connections thereof.
Mounting of 250 KVA Transformer on the Double pole/Plinth structures and connections thereof.
Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material.
Providing & Fixing of three phase Distribution Box 1 No. with 4 Nos. clamp and LT insulating connectors 8 Nos. in each job.
Chemical earthing (Neutral/Body) including all required material & work as per Respo norms.
Laying of overhead 11 KV XLPE 3x70 mm2 as per direction of supervising engineer.
Constructions of transformer plinth of size 5.5x5.5x6 feet, with the help of first class brick and masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely as per norms with RCC top 1:2:4 cement, sand coarse and stone grit with MS Bar and MS channel for resting transformer wheel (100x50x1650mm) and plaster. All material shall be provided by the contractor. Old good conditioned bricks, stronegrit and MS bar/MS channel etc will be used after approval of Supervisory Engineer to lower the cost of work. Work includes Removal of T/F from old plinth and re-energize the T/F on earth safely till new plinth construction. Then after remounting the T/F on newly constructed plinth and making all connections to energize the T/F.
Providing and fixing of welded wire mesh fencing around transformer plinth with MS Angle of size 40x40x6 mm length and 1.20 mtrs height. Such panels shall be supported on MS angle from of size 40x40x6 mm having 04 nos corner supports of height 1.65 mtrs including extended legs for grouting which will be used as a door for entry of the personnel or removal/shifting of transformer with welded hinges, sliding belt etc for locking arrangement as per drawing and specifications. The fencing will be painted in the green colour synthetic enamel paint after painting with one coat of red oxide primer. The rates should be inclusive of all materials required for completion of above work. (Length of each fencing approx. 11 mtrs) with T& P labour etc.
The contractor shall provide F clamps, D/P clamps, stay clapms, cross arm clamps, LT clamps, ABC clamps, suspension clamps, piercing connectors, I-hooks, dead end clamps, any other clamps, nut & bolts and shackle insulators without charging any extra cost, in case the same are not available in the stores. Contractor shall also provide/perform any contingent material/work at his own cost, which is not included in the boq/estimates but is required for execution/completion of the work. Further, any fabrication work, if required, shall also be carried out by the contractor at his own cost, for which no additional payment shall be admissible.
RAJENDRA BHARDWAJ (BID ID -5682144)
Shri Krishna Construction Company (BID ID -5682130)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
Tendernotice_2.pdf
PDF • 0.67 MB
BOQ_1993820.xls
BOQ • 0.24 MB
Technical.rar
Tender Documents • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .