Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAccepted-Finance | ₹5.4 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹5.5 CrAccepted-Finance | ₹5.5 Cr | L2 | Accepted-Finance Accepted |
| 3 | L3₹6.5 CrAccepted-Finance | ₹6.5 Cr | L3 | Accepted-Finance Accepted |
| 4 | L4₹6.5 CrAccepted-Finance | ₹6.5 Cr | L4 | Accepted-Finance Accepted |
Updated dates
Tender Value
₹7.2 Cr
EMD Value
₹14.4 L
Closing Date
18 May 2026, 3:00 pmClosed
EE CD XI IFC DEPTT
OFFICE OF EE CD XI IFC DEPTT SECTOR-15 ROHINI DELHI
Construction of Double Lane Bridge near RD. 25075m on Supplementary Drain for the year 2025 26
2026_IFC_290680_1
EE/CD-XI/NIT-04/2026-27
Open Tender
Civil Works
365 days
Delhi
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹14.4 L
19 May 2026
30 Apr 2026
18 May 2026
30 Apr 2026
18 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 30 | Cum | 2,064.71 | ₹61,941.3 |
| 2 | Care and diversion of standing water, spring water, river water or drains and the like in working area including construction and removal of earth/coffer bundies upto DBL/existing lever where required including pumping and baliling out of the surface flowing water for keeping the working area free from standing water, flowing water seepage water for execution of entire work. Cost includes arrangement of earth by agency at their own cost with all leads and lifts including by mechanical transport, the cost of royalty of earth etc complete. Scope of item includes cost of empty cement bags required for bandies, watch and ward, pumping out of water and removal of bundies after execution of work. | 312 | Meter | 40,238.78 | ₹1,25,54,499.36 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 2,426 | Cum | 177.89 | ₹4,31,561.14 |
| 3.1 | Extra for Ist lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil. | 527 | Cum | 127.08 | ₹66,971.16 |
| 3.2 | Extra for IInd lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil. | 392 | Cum | 127.08 | ₹49,815.36 |
| 3.3 | Extra for IIIrd lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials. All kinds of soil. | 261 | Cum | 127.08 | ₹33,167.88 |
| 4.1 | Centering and shuttering including strutting, propping etc. and removal of form for all heights :Foundations, footings, bases of columns, etc. for mass concrete | 569 | Sqm | 393.01 | ₹2,23,622.69 |
| 4.2 | Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 615 | Sqm | 844.35 | ₹5,19,275.25 |
| 4.3 | Columns, Pillars, Piers, Abutments, Posts and Struts | 45 | Sqm | 963.41 | ₹43,353.45 |
| 4.4 | Extra for shuttering in circular work (20% of respective centering and shuttering items) | 45 | Sqm | 192.68 | ₹8,670.6 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 29.72 MB
BOQ_385718.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid