| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 CrAccepted-AOC | ₹15.4 Cr Quoted ₹15.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹16.3 CrRejected-Finance | ₹16.3 Cr | L2 | Rejected-Finance 2ND BIDDER LOWEST |
| 3 | L3₹16.8 CrRejected-Finance | ₹16.8 Cr | L3 | Rejected-Finance 3RD BIDDER LOWEST |
| 4 | L4₹17.0 CrRejected-Finance 292C FRIENDS COLONY ETAWAH | ₹17.0 Cr | L4 | Rejected-Finance 4TH BIDDER LOWEST |
| 5 | L5₹17.9 CrRejected-Finance | ₹17.9 Cr | L5 | Rejected-Finance 5TH BIDDER LOWEST |
Tender Value
₹24.8 Cr
EMD Value
₹37.1 L
Closing Date
19 Dec 2024, 12:00 pmClosed
SE
ETAWAH CIRCLE PWD ETAWAH
Widening and Strengthening work of Bharthana Bakewar Lakhna Sindosh Road (MDR142) (Including 05 Years Maintenance)
2024_CEKNP_981509_1
5930/55C-EC/2024 DATE 26-11-2024
Open Tender
Civil Works - Roads
450 days
ETAWAH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹37.1 L
Yes
ETAWAH
20 Feb 2025
7 Dec 2024
19 Dec 2024
7 Dec 2024
19 Dec 2024
7 Dec 2024
13 Dec 2024
Amount
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading of stablized graded stone aggregates (WMM) after mixing with water at OMC in mechanicla mix plant carriage of mixed Material by tipper to site, laying with 1% OPC cement and 3.5% Emulsion in uniform single layer on subbase /Sub grade and compacting with the roller to achieve the desire density.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 (For Patri)
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per Technical Specification Clause 503 (For DBM)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. As per MoRTH specification clause No. 505 complete in all respects
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per Technical Specification Clause 503 (For BC)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Construction of U-Type RCC Drain 600x600 mm in abadi portion.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (RCC GRADE M20)
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications.
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Cement concrete with 2 cm gauge approved stone ballast approved coarse sand cement in the proportion of 4:2:1 including supply of all material T&P etc. required for proper completion of work. (As per S.I. No. 279 a)
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
NP-3 dia 1000 mm pipe
Sand Fillling over hume pipe for cushion including suppply of necessary quantity fo sand including watering ramming and dresssing etc. required for proper completion of work.
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications
Supply & Fixing Km, HM Stone, Road Sign/Caution Board etc complete
Part-B Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 28 (Excluding G.S.T.) Maintainance of First Year (@ 0.00% of Total Work Amount of 1 to 28)
Part-B Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 28 (Excluding G.S.T.) Maintainance of Second Year (@0.25% of Total Work Amount of 1 to 28)
Part-B Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 28 (Excluding G.S.T.) Maintainance of Third Year (@0.50% of Total Work Amount of 1 to 28)
Part-B Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 28 (Excluding G.S.T.) Maintainance of Fourth Year (@0.75% of Total Work Amount of 1 to 28)
Part-B Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. Total of Work Amount 1 to 28 (Excluding G.S.T.) Maintainance of Fifth Year (@1% of Total Work Amount of 1 to 28)
M/S SHUBH CONSTRUCTION (BID ID -4795627)
M/S JAI BUILDERS (BID ID -4791058)
M/S DEV BUILDERS (BID ID -4796823)
B.P.Construction (BID ID -4774910)
M/s Raj Laxmi Enterprises (BID ID -4798367)
Shri M P Singh Tomar (BID ID -4790823)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf