| 1 | 1st₹8.5 LAccepted-Finance VILLAGE DUBOR P O TIMBI TEHSIL SHILLAI DISTRICT SIRMOUR H P | TIMBI | SIRMOUR | HIMACHAL PRADESH | 173027 | 1st | Accepted-Finance lowest | |
| 2 | 2nd₹9.4 L+₹90,092.50 (10.6%)Rejected-Finance VILLAGE PO PALKWAH TEHSIL HAROLI DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | 2nd | Rejected-Finance not lowest | |
| 3 | 3rd₹9.8 L+₹1.3 L (15.7%)Rejected-Finance | 3rd | Rejected-Finance not lowest |
| Sl No | Description | Qty | Unit | M/S MOHAN SINGH L3 | SURENDER SINGH L1 | SUMIT KUMAR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Removal of slips in all kinds of soil/Snow including saturated soil but excluding boulders and rocky portion requiring blasting) upto a distance of 20 metres, disposing of un-serviceable materials, stacking serviceable materials and neatly dressing the surface. | 76.8 | cum | 660 ₹50,688 | 550 ₹42,240 Lowest | 650 ₹49,920 |
| 2.00 | Felling trees of the girth (measured at a height of 1 metre above ground level) including cuttng of trunks and branches removing the roots and stacking of serviceable material and disposal of unserviceable materials. | 6 | Nos | 13,010 ₹78,060 | 12,000 ₹72,000 Lowest | 13,000 ₹78,000 |
| 3.00Excavation in foundation, trenches etc. in earth work in all kinds of soil lift upto all height, stacking the excavated soil not more than 3 mrs. Clear from the edge of excation & then returning the stacked soil in 15cm. Layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming & watering and then disposing of all surplus excavated earth as directed within all leads and lifts. | ||||||
| 3.01 | Pick Work | 247.5 | cum | 700 ₹1,73,250 | 580 ₹1,43,550 Lowest | 650 ₹1,60,875 |
| 3.02 | pick jumper | 141.75 | cum | 1,120 ₹1,58,760 | 1,050 ₹1,48,837.5 Lowest | 1,100 ₹1,55,925 |
| 4.00Laying, jointing and commissioning of HDPE (High Density Polyethylene pipes) of following diameter and class confirming to IS 4984-1995 with fusion welding process including all necessary fittings & bends in all leads and lifts to the entire satisfaction of Engineer-in-charge. (Earth work in trenches to be measured and paid separately) (PE-63 PN-8) | ||||||
| 4.01 | 25mm | 1,000 | Rmt | 50 ₹50,000 | 40 ₹40,000 Lowest | 45 ₹45,000 |
| 4.02 | 32mm | 500 | Rmt | 60 ₹30,000 | 45 ₹22,500 Lowest | 55 ₹27,500 |
| 4.03 | 40mm | 500 | Rmt | 65 ₹32,500 | 55 ₹27,500 Lowest | 65 ₹32,500 |
| 4.04 | 50mm | 500 | Rmt | 85 ₹42,500 | 75 ₹37,500 Lowest | 85 ₹42,500 |
Tender Value
₹6.9 L
EMD Value
₹13,740
Closing Date
10 Sept 2025, 5:00 pmClosed
Executive Engineer
Division reckong Peo
LJ andTesting of HDPE pipes of various Dia and Removal of the same temporary arrangments and other miscelenious work
2025_HPIPH_113023_1
KNR-JSD-Peo-EA-I-Tender
Open Tender
Civil Works
Item Rate
60 days
GP Nichar
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Yes
₹13,740
Yes
15 Nov 2025
27 Aug 2025
11 Sept 2025
28 Aug 2025
10 Sept 2025
28 Aug 2025
Amount
Removal of slips in all kinds of soil/Snow including saturated soil but excluding boulders and rocky portion requiring blasting) upto a distance of 20 metres, disposing of un-serviceable materials, stacking serviceable materials and neatly dressing the surface.
Felling trees of the girth (measured at a height of 1 metre above ground level) including cuttng of trunks and branches removing the roots and stacking of serviceable material and disposal of unserviceable materials.
Excavation in foundation, trenches etc. in earth work in all kinds of soil lift upto all height, stacking the excavated soil not more than 3 mrs. Clear from the edge of excation & then returning the stacked soil in 15cm. Layers when required into plinth sides of foundation etc. consolidating each deposited layer by ramming & watering and then disposing of all surplus excavated earth as directed within all leads and lifts.
Pick Work
pick jumper
Laying, jointing and commissioning of HDPE (High Density Polyethylene pipes) of following diameter and class confirming to IS 4984-1995 with fusion welding process including all necessary fittings & bends in all leads and lifts to the entire satisfaction of Engineer-in-charge. (Earth work in trenches to be measured and paid separately) (PE-63 PN-8)
Removal of the HDPE pipe (Dismental) after completion of purpose (Temporary arrngement of water supply winter damages) and placing in the sage custody of Engineer-in-Charge as per his direction.
Providing and fixing Gun metal full way peet valve Unik/Kirti/Unique/Jindal make of following dia.
Sealing the cut point of existing Gl pipes where temporary arrangement inserted after restoration of main source lines including required fitting and provide PPR fitting to Athaaro Programme at Nichar Devi Temple other miscelenious requirement as per commette requirement.
SUMIT KUMAR (BID ID -551832)
M/S MOHAN SINGH (BID ID -551882)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .