Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.0 L+₹206.50 (0.10%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.1 L+₹5,310.01 (2.66%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.1 L+₹6,490.02 (3.25%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹5,900
Closing Date
17 Jul 2026, 4:00 pmClosed
Xen Rew Office Kathua
Xen Rew Office Kathua
Construction of Foot Bridge on Nallah NHO Vakil Chand S/o Kansu Ram, Ward no. 2, Dhar Jhanker Block Dhar Mahanpur
2026_RDPR_314987_5
e-NIT No.86/REW/K of 2026-27 Dated 08/07/2026
Open Tender
Civil Works
Percentage
90 days
Dhar Mahanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹5,900
22 Jul 2026
8 Jul 2026
18 Jul 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (exceeding 30 cm and upto 1.5 m in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth upto one metre from cutting edge, disposed earth to be levelled and neatly dressed in 70% all kinds of soil | 4.05 | m3 | 479.3 | ₹1,941.17 |
| 2 | Earth work in excavation by manual means over areas (exceeding 30 cm and upto 1.5 m in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth upto one metre from cutting edge, disposed earth to be levelled and neatly dressed in 30% ordinary rock | 1.73 | m3 | 924.8 | ₹1,599.9 |
| 3 | Providing and laying in position cement concrete of (1:5:10)grade excluding the cost of centering and shuttering using 40mm size agg. | 0.55 | m3 | 4,826.5 | ₹2,654.58 |
| 4 | Providing and laying in position cement concrete of (1:3:6) grade excluding the cost of centering and shuttering -with 30% boulder | 11.1 | m3 | 4,294.89 | ₹47,673.28 |
| 5 | Providing and laying in position (1:1.5:3) grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement | 6.05 | m3 | 9,395.7 | ₹56,843.99 |
| 6 | Reinforcement for RCC work including cutting,straightening ,bending ,binding etc. | 598 | kg | 123.2 | ₹73,673.6 |
| 7 | Centring & shuttering including strutting , propping & removal of formwork | 6.9 | m2 | 286.35 | ₹1,975.82 |
| 8 | Walls (any thickness) including attached pilasters, buttresses | 38 | m2 | 628.95 | ₹23,900.1 |
| 9 | Beam | 2.4 | m2 | 577.55 | ₹1,386.12 |
| 10 | Suspended floor | 13.2 | m2 | 718.2 | ₹9,480.24 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.01 MB
BOQ_1020402.xls
BOQ • 0.30 MB
ExtensionTenderId86.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .