Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹2.3 LAccepted-Finance | ₹2.3 L | 1ST | Accepted-Finance 1st Lowest |
| 2 | 2ND₹2.5 L+₹12,820.01 (5.51%)Rejected-Finance | ₹2.5 L+₹12,820.01 (5.51%) | 2ND | Rejected-Finance 2nd Lowest |
| 3 | 3RD₹2.5 L+₹13,773.95 (5.92%)Rejected-Finance 53 67 R N GUHA RD KOLKATA 700028 | 24 PARAGANAS NORTH | WEST BENGAL | 700028 | ₹2.5 L+₹13,773.95 (5.92%) | 3RD | Rejected-Finance 3rd Lowest |
Tender Value
₹2.3 L
EMD Value
₹5,700
Closing Date
25 Aug 2026, 11:00 amClosed
EE(C)/BR-IV
213B, C.R. AVENUE, KOL - 6
REPAIRING OF ASPHALTUM ROAD AT PATHURIA GHATA STREET IN WARD NO-21
2026_KMC_1038214_1
KMC/BR-IV/21/7/26-27/R
Open Tender
CIVIL WORKS
Percentage
15 days
BOROUGH-IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,700
3 Sept 2026
14 Aug 2026
27 Aug 2026
14 Aug 2026
25 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm. | 1,767.48 | SQM | 14.4 | ₹25,451.71 |
| 2 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) (For compacted thickness 75mm) | 117.35 | SQM | 188.23 | ₹22,088.79 |
| 3 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular surfaces treated with primer. (Using Bitumen emulsion at the rate of 0.25 to 0.30 kg per sqm.) | 117.35 | SQM | 11.07 | ₹1,299.06 |
| 4 | Transportation and laying 40 mm thick hot asphaltum mixture from kmc plant to the work site including rolling but excluding the cost of tack coat (covered area- 1250 square meter per 100 mt hot-mixture) a) without paver finisher i) Day Time | 1,761.53 | SQM | 41 | ₹72,222.68 |
| 5 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) On Bituminous Surface. (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.) | 1,644.18 | SQM | 10.18 | ₹16,737.74 |
| 6 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. | 306.9 | MTR | 8.17 | ₹2,507.37 |
| 7 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. | 306.9 | MTR | 8.17 | ₹2,507.37 |
| 8 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. | 306.9 | MTR | 18.24 | ₹5,597.86 |
| 9 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb | 306.9 | MTR | 21.34 | ₹6,549.25 |
| 10 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 1. Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation (b) 1:4:8 proportion | 9.21 | M3 | 4,373 | ₹40,262.21 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_2550400.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .