Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 CrAccepted-Finance | ₹2.9 Cr | 1 | Accepted-Finance Responsive |
| 2 | 2₹2.9 Cr+₹7,268.25 (0.03%)Accepted-Finance | ₹2.9 Cr+₹7,268.25 (0.03%) | 2 | Accepted-Finance Responsive |
| Sl No | Description | Qty | Unit | M/s NL Enterprises L1 | M/s CY Enterprises L2 |
|---|---|---|---|---|---|
| 1.00SH: BUILDING | |||||
| 2.00EXCAVATION AND EARTH WORK | |||||
| 3.00 | Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30cm size, saturated soil and rock), lift upto 1.50m and stacking the excavated soil not more than 3m clear from the edge of the excavation and returing the stacked soil in 15cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m. | 600.6 | Cum | 282.12 ₹1,69,441.27 Lowest | 285.12 ₹1,71,243.07 |
| 4.00 | Re-filling excavated earth in foundations and plinth etc. In 15 cm layer including ramming and water etc. Complete | 380.37 | Cum | 156.8 ₹59,642.02 Lowest | 156.8 ₹59,642.02 Lowest |
| 5.00 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete | 52.53 | Cum | 1,036.72 ₹54,458.9 Lowest | 1,036.72 ₹54,458.9 Lowest |
| 6.004.CONCRETE WORK | |||||
| 7.00 | Providing and laying in foundations and plinth cement concrete 1:4:8 (1 cement: 4 coarse sand : 8 graded stone aggregate 40mm nominal size) excluding the cost of centring and shuttering. | 64.31 | Cum | 5,830.88 ₹3,74,983.89 Lowest | 5,830.88 ₹3,74,983.89 Lowest |
| 8.00 | Providing and laying damp proof course 38mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 stone aggregate 12.5 mm nominal size) | 58.37 | Sqm | 367.87 ₹21,472.57 Lowest | 367.87 ₹21,472.57 Lowest |
| 9.00 | Extra for providing and mixing water proofing material in cement concrete work in the proportion recommended by manufacturers. | 14.94 | Per bag | 305.03 ₹4,557.15 Lowest | 305.03 ₹4,557.15 Lowest |
| 10.00 | Applying a coat of hot bitumen (mashphalte 80/100 or equivalent) using 1.70 kg. per sqm. on damp proof course after cleaing the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil. | 58.37 | Sqm | 276.73 ₹16,152.73 Lowest | 276.73 ₹16,152.73 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
19 Nov 2025, 11:00 amClosed
Block Development Officer
O/o BDO- Bana, RD, East Kameng District, AP.
Construction of School Building with Standard Designed G Plus 1 at Govt Middle School, Seba with Boundary Wall under Bana Block, East Kameng District.
2025_DRDAP_2837_1
CD/BNA/PMJVK-01/2025-26
Open Tender
Civil Works
Item Rate
365 days
Bana
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
BDO, Bana, RD, East kameng District
₹2.9 L
Seppa
19 Nov 2025
14 Nov 2025
19 Nov 2025
14 Nov 2025
19 Nov 2025
14 Nov 2025
17 Nov 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
Tender_Documents1.pdf
Tender Documents • 26.25 MB
BOQ_3037.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .