| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.7 LAccepted-AOC | ₹32.7 L | L1 | Accepted-AOC Addmited |
| 2 | L2₹33.8 L+₹1.1 L (3.27%)Rejected-AOC | ₹33.8 L+₹1.1 L (3.27%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹34.5 L+₹1.8 L (5.59%)Rejected-AOC | ₹34.5 L+₹1.8 L (5.59%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹35.8 L+₹3.1 L (9.42%)Rejected-AOC KARUR | ₹35.8 L+₹3.1 L (9.42%) | L4 | Rejected-AOC Rejected |
| 5 | L5₹36.0 L+₹3.2 L (9.93%)Rejected-AOC | ₹36.0 L+₹3.2 L (9.93%) | L5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SPE Construction L4 | K Sundaramoorthy L5 | V Vediyappan L3 | Veeraa Constructions L1 | M/s Vaishnavi Constructions L2 |
|---|---|---|---|---|---|---|---|---|
| 1.001. Construction of Two Class Room Building at PUPS, Gotletti village H/o Karakuppam- Rs. 36.25 Lakhs | ||||||||
| 2.00 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. | 117.22 | cu.m | 263.46 ₹30,882.78 | 264.68 ₹31,025.79 | 250 ₹29,305 | 250 ₹29,305 | 165 ₹19,341.3 Lowest |
| 3.00 | Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications. | 18.59 | cu.m | 1,699.54 ₹31,594.45 | 1,707.37 ₹31,740.01 | 1,640 ₹30,487.6 | 1,300 ₹24,167 Lowest | 1,500 ₹27,885 |
| 4.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 23.9 | cu.m | 5,290.71 ₹1,26,447.97 | 5,315.08 ₹1,27,030.41 | 5,110 ₹1,22,129 | 5,000 ₹1,19,500 | 4,500 ₹1,07,550 Lowest |
| 5.00 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | 67.46 | cu.m | 45.79 ₹3,088.99 | 46.01 ₹3,103.83 | 40 ₹2,698.4 Lowest | 40 ₹2,698.4 Lowest | 95 ₹6,408.7 |
| 6.00 | Supplying and filling of good earth filling locally available earth transported from the outside including consolidation, leveling specified in layers of not exceeding 200 mm thick., etc. complete. | 77.58 | cu.m | 120.84 ₹9,374.77 | 121.4 ₹9,418.21 | 116 ₹8,999.28 Lowest | 250 ₹19,395 | 200 ₹15,516 |
| 7.00Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | ||||||||
| 8.00 | Footing Plinth Beam | 71.6 | Sq.m | 546.84 ₹39,153.74 | 549.36 ₹39,334.18 | 528 ₹37,804.8 | 500 ₹35,800 Lowest | 500 ₹35,800 Lowest |
| 9.00 | Plain surfaces such as roof slab, floor slab, beams, lintels, loft, sill slab, staircase waist, portico slab and other similar works. | 189.63 | Sq.m | 1,093.69 ₹2,07,396.43 | 1,098.72 ₹2,08,350.27 | 1,050 ₹1,99,111.5 | 850 ₹1,61,185.5 | 800 ₹1,51,704 Lowest |
| 10.00 | Square and rectangular columns and small quantities such as sunshades, parapet cum drops, window boxing, fin projections and other similar works. | 137.65 | Sq.m | 1,093.69 ₹1,50,546.43 | 1,098.72 ₹1,51,238.81 | 1,050 ₹1,44,532.5 | 850 ₹1,17,002.5 Lowest | 1,000 ₹1,37,650 |
Tender Value
₹36.3 L
EMD Value
₹37,000
Closing Date
27 Jul 2026, 3:00 pmClosed
The Block Development Officer
The Block Development Officer
Krishnagiri Dt Bargur Block Union General Fund 2025_26 Construction of PUS 2 Class Room School Building at Gotletti Village at Karakuppam Panchayat BRG_01
2026_RDTN_685438_1
1918_2025_A5_dt_12_.03_2026
Open Tender
Civil Works - Others
Item Rate
180 days
The Block Development Officer
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹37,000
The Block Development Officer
21 Sept 2026
13 Jul 2026
27 Jul 2026
13 Jul 2026
27 Jul 2026
13 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. Construction of Two Class Room Building at PUPS, Gotletti village H/o Karakuppam- Rs. 36.25 Lakhs | - | - | - | - |
| 2 | Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. | 117.22 | cu.m | - | - |
| 3 | Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications. | 18.59 | cu.m | - | - |
| 4 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 23.9 | cu.m | - | - |
| 5 | Refilling the approved good quality earth in plinths, area development etc. wherever specified in layers is not exceeding 200 mm thick, with available earth at site. | 67.46 | cu.m | - | - |
| 6 | Supplying and filling of good earth filling locally available earth transported from the outside including consolidation, leveling specified in layers of not exceeding 200 mm thick., etc. complete. | 77.58 | cu.m | - | - |
| 7 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | - | - | - | - |
| 8 | Footing Plinth Beam | 71.6 | Sq.m | - | - |
| 9 | Plain surfaces such as roof slab, floor slab, beams, lintels, loft, sill slab, staircase waist, portico slab and other similar works. | 189.63 | Sq.m | - | - |
| 10 | Square and rectangular columns and small quantities such as sunshades, parapet cum drops, window boxing, fin projections and other similar works. | 137.65 | Sq.m | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.12 MB
PB-36.pdf
Tender Documents • 0.59 MB
TB-36.pdf
Tender Documents • 0.65 MB
BOQ_823946.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .