Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-Finance | ₹5.1 Cr | L1 | Accepted-Finance L-1 Bidder |
| 2 | L2₹5.2 CrRejected-Finance 0 7 372 2 | ₹5.2 Cr | L2 | Rejected-Finance L-2 Bidder |
| 3 | Not Admitted-Fee/PreQual/Technical C 863 85 GOVIND PURAM GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6.6 Cr
EMD Value
₹13.2 L
Closing Date
17 Apr 2026, 5:00 pmClosed
Chief Project Manager (Gzb)
Office of the Chief Project Manager (Gzb), F-Block, New Kavi Nagar, Ghaziabad
Construction of Bridge, Approach Road, Addiditional Approach Road and Protection work at Krishna River at Asara Tikri Road in dist. Baghpat
2026_UPSBC_1126637_1
4683/30ET/CPM(GZB)/2025-2026
Open Tender
Civil Works - Bridges
Percentage
540 days
Krishna River at Asara Tikri in distt Bagpat
Please refer Tender documents.
8 documents required · 8 mandatory
₹20,000
As Per Tender Documents
₹13.2 L
F-Block, New Kavi Nagar, Ghaziabad
4 Jun 2026
18 Mar 2026
18 Apr 2026
18 Mar 2026
17 Apr 2026
18 Mar 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Foundation work | |||||
| 1.01 | Providing and Constructing Temporary Island for Construction of Well Foundation for 5.50 m dia. Well
Assuming depth of water 4.0 m and height of island 4.5 m. complete the work as per MoRTH Specification. 12.9 (B) | 1 | Nos | 0.58 | ₹0.58 |
| 1.02 | Making Temporary Pile Bridge 22.00 Mtr Length for the purpose of during construction work in running water. | 22 | RM | - | - |
| 1.03 | Providing and laying of Cutting Edge of Mild Steel for foundation (M-30) complete the work as per MoRTH Specification 12.10 (1200 & 1900) | 2.19 | MT | - | - |
| 1.04 | Providing and laying of Concrete in Well Curb for Abutment for foundation (M-30) complete the work as per MoRTH Specification 12.11 A (ii) | 46 | Cum | - | - |
| 1.05 | Providing and laying of Concrete in Well Steining for Abutment for foundation (M-30) complete the work as per MoRTH Specification 12.11 B (ii) | 540 | Cum | - | - |
| 1.06 | Providing and laying of Concerete in Well Steining for Pier in well foundation (M-30) complete the work as per MoRTH Specification 12.11 B (ii) | 567.18 | Cum | - | - |
| 1.07 | Providing and laying of Concrete in Bottom Plugging for well foundation (M-25) complete the work as per MoRTH Specification 12.11 © | 179.84 | Cum | - | - |
| 1.08 | Providing and laying of Concrete in Intermediate Plugging for well foundation (M-15) complete the work as per MoRTH Specification 12.11 D (i) | 13.6 | Cum | - | - |
| 1.09 | Providing and laying of Concrete in False Steining for Well Foundation (M-15) complete the work as per MoRTH Specification 12.11 B (ii) | 30.24 | Cum | 0.4 | ₹12.07 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Ashara_GAD.pdf
Additional Documents • 1.19 MB
Asara_Google_Location.pdf
Additional Documents • 0.41 MB
BOQ_2101071.xls
BOQ • 0.39 MB
Tender_Document_Asara.pdf
Tender Documents • 35.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].