Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.4 L+₹1,460.72 (1.05%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹1.4 L
EMD Value
₹2,800
Closing Date
17 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Constt of Concrete Path from Qabristhan to NHO Mohd Ayoub W.No 7 Panchayat Malhar, Block Lohai Malhar
2026_RDPR_320254_18
e-NIT No.176/REW/K of 2026-27 Dated 10/08/2026 2nd call
Open Tender
Civil Works
Percentage
90 days
LOHAI MALHAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹2,800
31 Aug 2026
10 Aug 2026
18 Aug 2026
10 Aug 2026
17 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressingof the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in All kind of soil. | 77.02 | sqm | 24.12 | ₹1,857.72 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kind of Soil. | 2.55 | cum | 479.3 | ₹1,222.22 |
| 3 | Providing and laying in position dry stone aggregate. All work upto plinth level with stone including spreading, compacting and consolidation in all respect. | 9.03 | cum | 1,700 | ₹15,351 |
| 4 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 12.93 | cum | 5,733.6 | ₹74,135.45 |
| 5 | Dumping of Stone Including Cost of Stones | 3.45 | cum | 937.9 | ₹3,235.76 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 17.08 | sqm | 286.35 | ₹4,890.86 |
| 7 | Carriage of Sand + Agg for 64 KM by MT and 600 m HL | 24.58 | cum | 1,576.96 | ₹38,761.68 |
| 8 | Add Cost for CIB | 1 | no | 1,000 | ₹1,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.97 MB
BOQ_1063985.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .