Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.9 CrAccepted-AOC AT KUSHALWADI POST DHARMAPURI TQ AMBAJOGAI DIAT BEED 431517 | AMBAJOGAI | BEED | MAHARASHTRA | 431517 | L1 | Accepted-AOC L1 | |
| 2 | L2₹25.1 Cr+₹1.2 Cr (4.99%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical PARALI V | PARBHANI | MAHARASHTRA | 431401 | - | Rejected-Technical Reject |
Tender Value
₹25.8 Cr
EMD Value
₹12.9 L
Closing Date
2 Aug 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E E Office P.W.Division, Parbhani.
E E Office P.W.Division, Parbhani.
IMPROVEMENT TO TWO LANE WITH PAVED SHOLDER GAGAKHED AKOLI KODRI ANTARVALI ROAD SH-234 KM 10/00 TO 18/00 And 25/00 TO 31/500 TQ.GANGAKHED Dist. Parbhani
2024_PWR_1046815_1
pwd/pbn/etno05/24-25
Open Tender
Civil Works
Item Rate
545 days
Parbhani
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,000
₹12.9 L
C E Office Public works Region, Nanded.
6 Jan 2025
18 Jul 2024
5 Aug 2024
18 Jul 2024
2 Aug 2024
18 Jul 2024
26 Jul 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part A (Work Portion) | - | - | - | - |
| 2 | ITEM 1: Cutting down trees including trunks and branches with girths above 30cm to 60cm and stacking the materials neatly with all lifts and lead of 1000m as directed and earth filling in the depression / pit if any. | 69 | Per Number | 511 | ₹35,259 |
| 3 | ITEM 2: Cutting down trees including trunks and branches with girths above 60cm to 90cm and stacking the materials neatly with all lifts and lead of 1000m. as directed and earth filling in the depression/pit if any. | 54 | Per Number | 847 | ₹45,738 |
| 4 | ITEM 3: Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. | 42,600 | Per Square Metre | 12 | ₹5,11,200 |
| 5 | ITEM 4: Dismantling of Ordinary Km. Stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit. | 5 | Per Number | 437 | ₹2,185 |
| 6 | ITEM 5: Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. | 35,586.19 | Per Cubic Metre | 119 | ₹42,34,756.61 |
| 7 | ITEM 6: Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m.and spreading for embankment or stacking as directed. | 8,252.65 | Per Cubic Metre | 139 | ₹11,47,118.35 |
| 8 | ITEM 7: Excavation for roadway in soft rock, including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading or stacking as directed. | 1,178.95 | Per Cubic Metre | 177 | ₹2,08,674.15 |
| 9 | ITEM 8: Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | 9,727.65 | Per Cubic Metre | 119 | ₹11,57,590.35 |
| 10 | ITEM 9: Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97 percent of standard Proctor density after laying them in layers of 20 cm. to 30 cm. with vibratory roller. | 8,266.05 | Per Cubic Metre | 91 | ₹7,52,210.55 |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1840573.xls
BOQ • 0.46 MB
148511068.pdf
Tender Documents • 0.56 MB
148511070.html
Tender Documents • 0.05 MB
1a.pdf
Tender Documents • 3.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .