| 1 | L1₹15.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹15.2 L+₹8,574.52 (0.57%)Rejected-AOC 4 3 42 GANGAI NAGAR SALEM STEEL PLANT POST OFFICE SALEM SALEM TAMIL NADU 636013 | SALEM | TAMIL NADU | 636013 | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Contractor withdrawed the E Tender Application |
Tender Value
₹15.2 L
EMD Value
₹15,500
Closing Date
4 Jul 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO (BP)
BDO Office, Kadayampatti Block
Renovation of the West facing 3 Class RCC Building (G Plus 1) in PUMS at Poosaripatty H/O Poosaripatty Panchayat Kadayampatti Block at Salem District - SIUS - 2025-26
2025_RDTN_574842_1
Roc.No.3439/2024/A3
Open Tender
Civil Works
Item Wise
120 days
BDO Office, Kadayampatti Block
As per tender document
3 documents required · 3 mandatory
₹0
₹15,500
2 Aug 2025
27 Jun 2025
4 Jul 2025
27 Jun 2025
4 Jul 2025
27 Jun 2025
Amount
1.)Renovation of the West facing 3 Class RCC Building (G+1) in PUMS at Poosaripatty H/O Poosaripatty
Chipping of concrete and roughing the surface (Sl no 31 item no.38 A)
Paving the top of Roof with solar Reflective ceramic tiles of size 305x305x7 mm thick approved quality and colour laid in cement martor 1:3 (one cement and Three msand) 12mm thick and pointed with tile grout (nitotile Grout or equivalant) and cement in the ratio of 1:3 for Joint Curing etc... complete
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Paving the floor with pre-polished concrete anti-skid tiles (Required shape and design) of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three crushed stone M.Sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works) Using anti-skid tiles (Observed Data)
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc complete
Distembering two coats with best approved oil bound distember including cost of painting priming coat over new plastered surface and conveyance of all materials to site and all labour charges
Painting two coats with approved Plastic Emulsion over one coat of Primaring coat of Cement Paint over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc.
Painting two coats over Old iron works using Synthetic enamel paint including cost and conveyance of paint and all labour charges etc complete
Painting two coats with approved Black Oxide for Black board including cost and conveyance of paint and all labour charges etc complete
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD 18
Supply and fixing of single box type 4'-40W flourescent tube fitting with copper choke and condenser with TW round block on wall or ceiling with flourescent tube with PVC unsheathed copper leads from terminals to the fitting of Tube Light [SD 88 ]
Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 106
Provisions for drawing Bala painting including all cost and conveyance of men and materials etc.,(the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Provisions for Chappal rack No.1
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Provisions for Chappal rack No.2
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Provisions for Chappal rack No.3
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Provisions for Chappal rack No.4
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Provisions for Chappal rack No.5
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Provisions for Chappal rack No.6
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Provisions for Cubboard arrangements for (Stutents) No.1
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Provisions for Cubboard arrangements for (Stutents) No.2
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Provisions for Cubboard arrangements for (Stutents) No.3
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Provisions for Cubboard arrangements for (Stutents) No.4
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Provisions for Cubboard arrangements for (Stutents) No.5
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Provisions for Cubboard arrangements for (Stutents) No.6
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Provisions for Cubboard arrangements for (Teachers) No.1
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provision for Lock&Key arrangements
Provisions for Cubboard arrangements for (Teachers) No.2
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provision for Lock&Key arrangements
Provisions for Cubboard arrangements for (Teachers) No.3
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provision for Lock&Key arrangements
Provisions for Cubboard arrangements for (Teachers) No.4
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provision for Lock&Key arrangements
Provisions for Cubboard arrangements for (Teachers) No.5
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provision for Lock&Key arrangements
Provisions for Cubboard arrangements for (Teachers) No.6
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Distempering two coats with approved Distemper over two coat of Priming coat of Cement Paint cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers
Providing Cup-board Shutter with frame using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work (P. No.52 sl. No.124)
Provision for Lock&Key arrangements
Provisions for Rainwater harvesting structure No.1
Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Brick Work in CM 1:5 mix using II Class Bricks including cost and conveyance of materials and labour charges etc complete. - 100.00 Cft
Cost and Supply of Sand filling from approved quarry including cost and conveyance of all material etc completed
Cost and Supply of 40mm HBG Metal from approved quarry including cost and conveyance of all material etc completed
Cost and Supply of 20mm HBG Metal from approved quarry including cost and conveyance of all material etc completed
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion two coats to the outside of the Building using best approved best quality of Ccement Paint including cost of Cement Paint, brushes,scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.for Out side of the Building (New Wall)
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
arumugam and co (BID ID -1387691)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .