| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC H NO 02 NEAR GOVT BOYS SR SEC SCHOOL 121102 | PALWAL | HARYANA | 121102 | ₹1.3 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹1.4 CrRejected-Finance | ₹1.4 Cr | L2 | Rejected-Finance Reject due to higher rate quoted |
| 3 | L3₹1.4 CrRejected-Finance | ₹1.4 Cr | L3 | Rejected-Finance Reject due to higher rate quoted |
| 4 | L4₹1.4 CrRejected-Finance FCA68 JAIN COLONY BALLABGRAH 121004 | NA | NA | 121004 | ₹1.4 Cr | L4 | Rejected-Finance Reject due to higher rate quoted |
| 5 | Not Admitted-Fee/PreQual/Technical CIVIL LINE 4 BEHIND DEV VAHAN PALWAL 2021R1824 | NA | NA | 121004 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | RASHID KHAN CONTRACTOR L2 | Yogesh Kumar Mangla L4 | Anees, Contractor L3 | THE TEWATIA CO-OP L & C SOCIETY LTD. L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Recovery of 80mm thick old Interlocking Paver Blocks/Vibrated/Hydraulic Block completed in all respect | 21,663 | NO. | 4 -₹86,652 | 4.5 -₹97,483.50 | 4 -₹86,652 | 4.5 -₹97,483.50 |
| 2.00 | EARTH WORK IN FILLING (Excluding GST) Include all Leads and Carriage | 1,432.06 | cum | 500 ₹7.2 L | 427 ₹6.1 L | 600 ₹8.6 L | 449 ₹6.4 L |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
18 Dec 2025, 5:00 pmClosed
MANOJ KUMAR
Municipal Council Palwal
Construction of RMC Road and Drain From Ranjit to Aligarh Road ,Ward No.03, MC Palwal
2025_HRY_488785_1
202599855428 CC87 4540 9DDF 924F341E22BD294ULB
Open Tender
Civil Works
300 days
Palwal
2 documents required · 2 mandatory
₹5,000
₹2.5 L
Yes
11 Feb 2026
9 Dec 2025
19 Dec 2025
9 Dec 2025
18 Dec 2025
9 Dec 2025
Recovery of 80mm thick old Interlocking Paver Blocks/Vibrated/Hydraulic Block completed in all respect
EARTH WORK IN FILLING (Excluding GST) Include all Leads and Carriage
BoQ_Ver3.0
Bidder Name :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[11.8.2]12 mm cement plaster of mix : 2. 1:6 (1 cement: 6 coarse sand) [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[17.23.2]Water Bound Macadam Grading - II 2. Water Bound Macadam (53mm to 22.4 mm)Grading II with screenings Type “B” (11.2 mm aggregates) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate]
[17.70]Removal of existing IPB by manual means and disposal of dismantled material with all lead and lift as per technical specification clause 202.3. [Through Rate]
[17.72]Construction of unreinforced plain cement concrete pavement in M-30 mix design over a prepared sub base with OPC 43 grade conforming to IS:383 mixed with concrete mixer using batch type concrete mixer as per IS:1791, laid in position, compacted with needle vibrator, screed vibrator and plate vibrator, dewatering of free water with vaccum pump, finishing the surface with power floater, finishing to required lines and grades as per drawings and technical clause 1501 of MORTH specifications [Through Rate]
[21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.23.2.2]Providing and laying in position ready mixed plain cement concrete, using fly ash and cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 2.2. All works up to plinth level M-10 grade plain cement concrete (cement content considered @ 220 kg/cum) [Through Rate]
[6.24.1]Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 1. All works up to plinth level [Through Rate]
[6.26.2]Extra for providing richer mixes up to plinth and at all floor levels. 2. Providing M-35 grade concrete instead of M-25 grade BMC/ RMC. (Note : Cement content considered in M-35 is @ 350 kg/ cum) [Through Rate]
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate]
[6.30.2]Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. [Through Rate]
[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate]
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_566954.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid