| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC HOLDING NO 206 7 B 15 JJ SARANI BIDHANNAGAR DURGAPUR DIST PASCHIM BARDHAMAN PIN 713212 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713212 | ₹4.0 L | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹4.0 L+₹39.57 (0.01%)Rejected-Finance | ₹4.0 L+₹39.57 (0.01%) | L2 | Rejected-Finance 2ND LOWEST |
| 3 | L3₹4.0 L+₹7,952.81 (2.01%)Rejected-Finance | ₹4.0 L+₹7,952.81 (2.01%) | L3 | Rejected-Finance 3RD LOWEST |
Tender Value
₹4.0 L
EMD Value
₹7,913
Closing Date
22 May 2026, 11:00 amClosed
EE-I/DAMODAR CANAL DIVISION
EE-I/DAMODAR CANAL DIVISION
M/R of two number Outlets at ch. 742.00 (R/B) and ch. 751.00 (L/B)) of canal DMC at Mouza- Goligram, Block- Galsi- I under Sanko(I) Section of D.C. Hd Qtr Sub-Division within D.C. Division (2nd Call).
2026_IWD_1024197_5
WBIW/EE-I/DCD/e-NIT-01/2026-27
Open Tender
CIVIL WORKS
Percentage
30 days
Sanko(I) Section
Please refer Tender documents.
7 documents required · 7 mandatory
₹7,913
Yes
17 Jun 2026
15 May 2026
22 May 2026
15 May 2026
22 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
Depth of excavation not exceeding 1,500 mm. | 83.39 | %Cum. | 14,214.6 | ₹11,85,355.49 |
| 2 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
Do - by fine sand. | 2.94 | %Cum. | 76,377.69 | ₹2,24,550.41 |
| 3 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 29.44 | Sqm. | 28.6 | ₹841.98 |
| 4 | Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.
Medium Sand. | 5.96 | Cum. | 909.07 | ₹5,418.06 |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes
Pakur Variety. | 33.24 | Cum. | 5,708.31 | ₹1,89,744.22 |
| 6 | Cast-in-situ cement concrete blocks or lining units as per designed section and specification, in nominal mix propotion 1:1.5:3 (corresponding to M20 Grade)with well graded 20 mm down stone metal aggregate, laid in position by casting in alternative panels or otherwise to keep a gap of 12mm between the adjacent units, over a layer of polythene sheet of thickness not less than 100 micron to act as a separator between the bottom surface of the block and the sand cushion/ filter material laid below the blocks, including dressing, ramming, shuttering, finishing the exposed surface by trowel without adding any additional cement and sand mortar, curing and filling the gaps between the adjacent units by 5.6mm down coarse aggregate to be compacted properly, with all leads and lifts including supply and carriage of all materials, complete, without the cost of sand cushion/ filter.
(The rate is exclusive of the cost of stone aggregate and its carriage upto site. Construction wing has to add the cost of same from the SoR of PW (Roads) to derive the consolidated rate. Consumption chart of the USoR may be used for assessing the quantity of coarse aggregates per cum of concrete).
With Stone aggregatesl (Pakur, North Bengal or Rajmahal varieties. | 8.92 | Cum. | 6,983.3 | ₹62,291.04 |
| 7 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
25 mm to 30 mm thick wooden shuttering as per decission & direction of Engineer-In-Charge. | 157.21 | Sqm. | 390.91 | ₹61,454.96 |
| 8 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 17.76 | %Cum. | 9,241.22 | ₹1,64,124.07 |
| 9 | Supplying RC spun pipe (NP2) and matching collar as per specification including carraige upto a distance of 50 km from factory,loading,unloading and stacking properly at destination(Departmental stack yard/site of work)inclusive of all taxes.
For 30 cm dia pipe & 2.50 m Length | 6 | Each | 1,729.92 | ₹10,379.52 |
| 9.01 | For collar. | 4 | Each | 307.77 | ₹1,231.08 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
2911i.pdf
Tender Documents • 1.26 MB
BOQ_2517189.xls
BOQ • 0.29 MB
1.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .