| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.1 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹3.1 L+₹1,586 (0.51%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹3.3 L+₹19,784.69 (6.37%)Rejected-Finance | L-3 | Rejected-Finance L-3 |
Tender Value
₹3.2 L
EMD Value
₹6,460
Closing Date
22 Sept 2022, 10:00 amClosed
EE. BDGC, BSR
EE. BDGC, BSR
RECONSTRUCTION OF VRB AT KM. 0.975 OF LEFT DARYAPUR MR
2022_UPIDC_726534_94
03/EE/2022-23
Open Tender
Civil Works - Canal
Item Rate
60 days
BULANDSHAHR
FEE/EMD/TECH
2 documents required · 2 mandatory
₹677
₹6,460
26 Apr 2023
17 Sept 2022
22 Sept 2022
17 Sept 2022
22 Sept 2022
17 Sept 2022
Amount
Earth work in excavation for Making and Removing bundha With initial lead & Lift and earth to be disposed as per direction of Engineer in charge
E/W in Cutting/filling for making road diversion all type of soil including lead upto 1.0 km and lift 1.50 m with proper dressing and ramming etc.
Making Diversion
Removing Diversion
Supply & fixing of caution /informatory board with painting writing as per direction of Engineer in charge including cost of all material labour and T&P complete.
Dismentling of old Brick work of VRB and disposal with in 60 m. including cost of all labour and T&P complete
E/W in excavation of foundation in all type of soil including all initial Lead and lift etc.
Cement concrete 1:3:6 in cement, course sand and stone ballast 22.5-53mm mixing & laying in foundation including cost of all material labour and T&P complete
Brick work in 1:4 cement, course sand mortar and 1st class Brick including cost of all material labour and T&P complete
Cement pointing struck deep in 1:2 cement fine sand mortarincluding cost of all material labour and T&P complete
Centering & shuttering for RCC work in slab & bed block etc including cost of all material labour and T&P complete
Providing and laying RCC M20(1:1.5:3) with cement , coarse sand , and 10mm to 25mm stone grit including cost of all material, labour and T&P etc.complete.
C.C. work in 1:1.5:3 in wearing coat on top of slab including cost of all material labour and T&P complete
Steel Reinforcement Work i/c Cutting, Bending, Binding & Placing of i/c cost of binding wire & Steelincluding cost of all material, labour and T&P etc.complete.
Supply and Fixing 75mm dia PVC (6 kg/cm2 Presssure) drainage pipe etc.
Supply and Fixing Stone wheel guard size 750x200x200 mm with Front side Fluorescent paint including cost of all material, labour and T&P etc.complete.
Painting latters 2.5cm but up to 8.0 cm size including all cost of material, labour and T&P etc. complete
Finishing wall with two coat of water proof cement Paint approved quality as asian etc including supply of all material, labour, Tool & Plant etc.
Cement concrete 1:2:4 in 'Cement cooarse sand and stone grit mixing & laying including cost of all material labour and T&P complete
M/S PRABHAT CONTRACTOR AND ENGINEERS
Arvind Kumar
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .