Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19.8 L
EMD Value
₹19,800
Closing Date
11 Jan 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development Officer(BP), Lathur Block
Block Development Office, Lathur Block
Construction of Compound Wall in Panchayat Union office East Side at Lathur panchayat Union Under Panchayat union General Fund 2021-22
2021_RDTN_217816_1
Rc.No.823/2021/A4 Pt Dated 10.12.2021
Open Tender
Civil Works - Buildings
Lump-sum
120 days
Lathur Panchayat office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹19,800
Yes
11 Jan 2022
29 Dec 2021
11 Jan 2022
29 Dec 2021
11 Jan 2022
29 Dec 2021
90 days
Amount
Earth work excavation for foundation in all soils and sub - soils etc., complete as per SS 20B
Supplying and filling in foundation and basement with Filling Sand in layers not more than15 cm thick etc. complete.
Cement concrete 1:4:8 for foundation using 40mm HBG metal etc. complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm HBG metal for foundation and basement etc. complete.
Supplying and erecting centering of sides and soffits including supports and strutting up to 3.29m height for plane surfaces in all floors etc. complete.
Supplying and fabrication of steel including cost and conveyance and cutting, bending, tying and placing in position.etc.complete
Brick work in cement Mortar 1:5 for super structure using country bricks etc., complete.
Plastering with Cement Mortar 1:5 (one cement and five sand) 12mm thick in all floor including curing etc. complete.
Color washing Two coat with Best quality Plastic Emulsion Paint including cost of all materials brushes and scaffolding charges etc. complete.as per std specifications
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.RADHAKRISHNAN
A.SANTHAKUMAR
P.RAJARAJAN
M.THANIGACHALAM
stage.html
html • 0.03 MB
finance_257689.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .