Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Finance | ₹7.2 L | L1 | Admitted-Finance |
| 2 | L2₹7.4 L+₹12,592.96 (1.74%)Admitted-Finance | ₹7.4 L+₹12,592.96 (1.74%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SPARK SOLUTIONS L1 | KG MECH TECH ENGINEERING L2 |
|---|---|---|---|---|---|
| 1.01 | Dismantling and Lowering of Existing 3 Ton EOT Crane: Complete controlled dismantling and lowering of the existing 3- Ton Electric Overhead Travelling (EOT) crane, including the provision and use of hydraulic lifters, necessary straightening of hydraulics, and engagement of heavy labour at the site. | 1 | EACH | 69,950 ₹82,541 Lowest | 71,000 ₹83,780 |
| 1.02 | Overhaul and Testing of Flexible DSL System: Complete repair overhauling and functional testing of the flexible DSL system Scope includes replacement/repair of couplers and counter plates Gl wiring, holding systems, rigorous electrical twisting of all existing Associated motors and others electrical components / accessories. | 1 | EACH | 86,970 ₹1,02,624.6 Lowest | 87,500 ₹1,03,250 |
| 1.03 | Repair of gantry girder for existing rail. | 1 | EACH | 24,930 ₹29,417.4 Lowest | 25,500 ₹30,090 |
| 1.04 | Comprehensive repair and reconditioning of the main electrical control panel., including the supply and incorporation of all required materials (e.g., replacement of contractors, transformers, relays. wirings, and terminal blocks) to restore full operational capability. | 1 | EACH | 37,980 ₹44,816.4 Lowest | 38,500 ₹45,430 |
| 1.05 | Repair of power trolley of above mentioned hoist | 1 | EACH | 30,475 ₹35,960.5 Lowest | 31,000 ₹36,580 |
| 1.06 | Replacement of Limit switches for up-down & cross travel | 2 | EACH | 47,960 ₹56,592.8 Lowest | 49,400 ₹58,292 |
| 1.07 | Supply of wire rope for existing hoist | 24 | EACH | 26,208 ₹30,925.44 Lowest | 27,600 ₹32,568 |
| 1.08 | Supply of pendent cable with support wire | 15 | EACH | 17,910 ₹21,133.8 Lowest | 18,375 ₹21,682.5 |
| 1.09 | Wire rope Maintenance and treatment with comprehensive cleaning ailing greasing and application of suitable wire rope compound to the hoist wire rope | 1 | EACH | 20,950 ₹24,721 Lowest | 22,000 ₹25,960 |
| 1.10 | Re-assembled Panel box, wire rope, limit switch, etc. | 1 | EACH | 79,950 ₹94,341 Lowest | 81,000 ₹95,580 |
Tender Value
Refer Docs
EMD Value
₹14,500
Closing Date
12 Jun 2026, 3:00 pmClosed
Executive Engineer (EM) M-1
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Repairing of EOT crane (Make-Morris) with allied accessories at Kanti Nagar BPS.
2026_DJB_292811_6
NIT No-06 EE (EM) M-1/ (26-27)
Open Tender
Electrical Works
Works
30 days
Chitra Vihar BP Station Laxmi Nagar Delhi-110092
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
A/c.50448339804
₹14,500
16 Jun 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
12 Jun 2026
6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling and Lowering of Existing 3 Ton EOT Crane: Complete controlled dismantling and lowering of the existing 3- Ton Electric Overhead Travelling (EOT) crane, including the provision and use of hydraulic lifters, necessary straightening of hydraulics, and engagement of heavy labour at the site. | 1 | EACH | 80 | ₹80 |
| 1.02 | Overhaul and Testing of Flexible DSL System: Complete repair overhauling and functional testing of the flexible DSL system Scope includes replacement/repair of couplers and counter plates Gl wiring, holding systems, rigorous electrical twisting of all existing Associated motors and others electrical components / accessories. | 1 | EACH | 80 | ₹80 |
| 1.03 | Repair of gantry girder for existing rail. | 1 | EACH | 80 | ₹80 |
| 1.04 | Comprehensive repair and reconditioning of the main electrical control panel., including the supply and incorporation of all required materials (e.g., replacement of contractors, transformers, relays. wirings, and terminal blocks) to restore full operational capability. | 1 | EACH | 80 | ₹80 |
| 1.05 | Repair of power trolley of above mentioned hoist | 1 | EACH | 80 | ₹80 |
| 1.06 | Replacement of Limit switches for up-down & cross travel | 2 | EACH | 80 | ₹160 |
| 1.07 | Supply of wire rope for existing hoist | 24 | EACH | 80 | ₹1,920 |
| 1.08 | Supply of pendent cable with support wire | 15 | EACH | 80 | ₹1,200 |
| 1.09 | Wire rope Maintenance and treatment with comprehensive cleaning ailing greasing and application of suitable wire rope compound to the hoist wire rope | 1 | EACH | 80 | ₹80 |
| 1.1 | Re-assembled Panel box, wire rope, limit switch, etc. | 1 | EACH | 80 | ₹80 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_388984.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .