Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4,199Admitted-Finance | ₹4,199 | L1 | Admitted-Finance |
| 2 | L2₹4,345+₹146 (3.48%)Admitted-Finance | ₹4,345+₹146 (3.48%) | L2 | Admitted-Finance |
| 3 | L3₹4,600+₹401 (9.55%)Admitted-Finance | ₹4,600+₹401 (9.55%) | L3 | Admitted-Finance |
| 4 | L4₹4,700+₹501 (11.9%)Admitted-Finance MANSA | MANSA | MANSA | PUNJAB | ₹4,700+₹501 (11.9%) | L4 | Admitted-Finance |
| 5 | L5₹4,750+₹551 (13.1%)Admitted-Finance | ₹4,750+₹551 (13.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MS BOPARAI ENGINEERS L1 | aman electrical and engg works L2 | SIDHIVINAYAK POWER AND INFRASTRUCTURE L7 | GILL ELECTRICALS AND INSTRUMENTATIONS L3 | BRAR ELECTRICALS L5 | BOMBAY ELECTRIC COMPANY L6 | ASHOKA ENGINEERING WORKS L4 | AMANDEEP SINGH ELECTRICAL CONTRACTOR L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00For Description of Material can be checked in DNIT | |||||||||||
| 1.01 | For the execution of works comprising only labour component for execution of various works such as releasing of T/Well connection, Deloading of overloaded T/F, Bifurcation of feeders, Releasing ISC/GSC Connection or any development work to be executed on labour rate during year 2022-23 All Divisions under DS Circle, Ropar | 1 | Nos | 4,199 ₹4,199 Lowest | 4,345 ₹4,345 | 5,200 ₹5,200 | 4,600 ₹4,600 | 4,750 ₹4,750 | 5,000 ₹5,000 | 4,700 ₹4,700 | 4,750 ₹4,750 |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
4 Jul 2022, 5:00 pmClosed
Dy. Chief Engineer Ropar
DY.CE.DS Circle Near 132kva sub station Ropar
For the execution of works comprising only labour component for execution of various works such as releasing of T/Well connection, Deloading of overloaded T/F, Bifurcation of feeders, Releasing ISC/GSC Connection or any development work to be execute
2022_POWER_87070_1
03/DY.CE./DS, Circle Ropar/2022-23
Open Tender
Electrical Works
Item Rate
365 days
works
please refer tender documents
3 documents required · 3 mandatory
₹2,360
₹3.5 L
Yes
21 Sept 2023
22 Jun 2022
5 Jul 2022
22 Jun 2022
4 Jul 2022
22 Jun 2022
Amount
For Description of Material can be checked in DNIT
For the execution of works comprising only labour component for execution of various works such as releasing of T/Well connection, Deloading of overloaded T/F, Bifurcation of feeders, Releasing ISC/GSC Connection or any development work to be executed on labour rate during year 2022-23 All Divisions under DS Circle, Ropar
aman electrical and engg works
GILL ELECTRICALS AND INSTRUMENTATIONS
ASHOKA ENGINEERING WORKS
BRAR ELECTRICALS
AMANDEEP SINGH ELECTRICAL CONTRACTOR
BOMBAY ELECTRIC COMPANY
SIDHIVINAYAK POWER AND INFRASTRUCTURE
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
DNIT-03-22-23-of-Ropar-Circle.pdf
Tender Documents • 2.48 MB
BOQ_186178.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .