| 1 | L1₹4.4 LQualified BABA SADAN NEAR MARUTI AGENCY DEGREE COLLEGE SHARDA MANDIR ROAD OBRA ORA SONBHADRA UTTAR PRADESH 231219 INDIA UDYAM UP 72 0008378 | SONBHADRA | UTTAR PRADESH | 231219 | ₹4.4 L | L1 | Qualified |
| 2 | L2₹4.7 LQualified | ₹4.7 L | L2 | Qualified MSE, Category: General |
| 3 | L3₹4.9 LQualified 14 126 SECTOR 08 NEAR GAYTRI MANDIR OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | ₹4.9 L | L3 | Qualified |
| 4 | Disqualified 1614 A UIDHAN PUR NAVEEN SHAHDARA DELHI 110032 | SHAHDARA | DELHI | 110032 | - | - | Disqualified |
Tender Value
₹3.8 L
EMD Value
Exempted
Closing Date
26 Dec 2025, 1:00 pmClosed
Work of miscellaneous mechanical works in Ash handling
8694048
GEM/2025/B/6983412
Two Packet Bid
Fabrication and Erection of Conical portion at Ash collecting Tower,Fabrication of Tail pipe instal
90 days
Uttar Pradesh; Sonbhadra
Total value wise evaluation
BOQ
1 document required · 1 mandatory
Exempted
2 Jan 2026
10 Dec 2025
26 Dec 2025
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Fabrication and Erection of Conical portion at Ash collecting Tower | Fabrication and Erection of Conical portion at Ash collecting Tower | 6 | No | Naveen Kumar Of Tail Pipe 231219,Obra Thermal Power Plant Installed At Ash Collecting Tower | 90 |
| 2 | Fabrication of Tail pipe installed at Ash collecting Tower | Fabrication of Tail pipe installed at Ash collecting Tower | 12 | No | Naveen Kumar 231219,Obra Thermal Power Plant | 90 |
| 3 | Barricading work by MS plate at ECO hopper at Unit 11 and strengthening work of ECO Platform in unit 9 and 10. | Barricading work by MS plate at ECO hopper at Unit 11 and strengthening work of ECO Platform in unit 9 and 10. | 1 | Job | Naveen Kumar 231219,Obra Thermal Power Plant | 90 |
| 4 | Interconnection of vacuum line of Unit 11 to Unit 10 | Interconnection of vacuum line of Unit 11 to Unit 10 | 1 | Job | Naveen Kumar 231219,Obra Thermal Power Plant | 90 |
| 5 | Strengthening of Seal box of 9B by channel and beam support at ash collecting tower unit 9. | Strengthening of Seal box of 9B by channel and beam support at ash collecting tower unit 9. | 1 | Job | Naveen Kumar 231219,Obra Thermal Power Plant | 90 |
| 6 | Erection of 6 inch or 8 inch M.S. pipe from AWRS intermediate sump pit to Ash Dam | Erection of 6 inch or 8 inch M.S. pipe from AWRS intermediate sump pit to Ash Dam | 1 | Job | Naveen Kumar 231219,Obra Thermal Power Plant | 90 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8694048.pdf
GEM_BID
scope_of_work_2025-12-10-12-49-00_8266aca87ff24bf43c5cbe0631f6ee18.pdf
BOQ
boq_item_sample_file_2025-12-10-12-49-00_8a5c90ed57e44bc084d2a53cd36ed9d7.csv
BOQ
6000010261_af1da954-942c-44c5-b8cc1765352358021_ee_ahd1_btps_obra.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid