Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹21.5 LAccepted-Finance | L-1 | Accepted-Finance Admitted | |
| 2 | L-2₹25.9 L+₹4.5 L (20.9%)Accepted-Finance 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | L-2 | Accepted-Finance Admitted | |
| 3 | L-3₹26.7 L+₹5.3 L (24.5%)Accepted-Finance | L-3 | Accepted-Finance Admitted |
Tender Value
₹24.2 L
EMD Value
₹25,000
Closing Date
14 Oct 2024, 4:00 pmClosed
Superintending Engineer
Electricity Transmission Circle, 220 KV S/S Natwa, Mirzapur
Increasing capacity from (2x63) MVA to (2x63 1x40) MVA including dismantling and shifting of Bus coupler bay and 250 KVA station transformer, installation of 40 MVA T/F including transportation from 132 KV S/S Jigna to 132 KV S/S Mirzapur.
2024_UPTCL_955719_1
03/2024-25/ETC/Mzp
Open Tender
Electrical Works
Fixed-rate
90 days
Mirzapur
As per tender specification
2 documents required · 2 mandatory
₹590
Superintending Engineer, ETC, Mirzapur
₹25,000
25 Oct 2024
13 Sept 2024
15 Oct 2024
13 Sept 2024
14 Oct 2024
13 Sept 2024
Amount
Supply
PG Clamp suitable for ACSR Zebra to Zebra conductor.
PG clamp suitable for ACSR Moose to Zebra conductor.
PG Clamp for Panther to Panther
PG Clamp for Moose to Panther
PG Clamp for Deer to Deer
Bolted type single tension fittings suitable for single panther conductor
Single suspension fitting suitable for ACSR Panther conductor
Bolted type twin tension fitting along with 5 G.I.U bolt suitable for ACSR Zebra conductor
Twin Suspension fitting suitable for ACSR Zebra conductor
Spacer suitable for Zebra conductor
75x10 mm MS Flat
50x6 mm MS Flat
40mm MS Rod for Main Earthmat
U-Bolt,with nut ,bolt and washer ,22 mm
100 Watt outdoor LED Street light ,water proof,rust proof yellow light for street wall mounted ledure Havells/Crompton/oreva/Bajaj make
Complete installation, commissioning & cable connection of following equipments as per instruction mannual of various equipments and technical specifications of UPPTCL including shifting of materials/equipments from store to erection site and including all other associated work to complete the job.
Circuit breaker
132 KV SF6 Circuit Breaker
33 KV Vaccum Circuit Breaker
Current Transformer
132 KV Current Transformers
33 KV Current Transformers
132 KV CT Juction Boxes
33 KV CT Juction Boxes
Bus Isolators
132 KV Bus Isolators Without E/S
33 KV Bus Isolators Without E/S
Surge Arrestors
132 KV Surge Arrestors
33 KV Surge Arrestors
Potential Transformer
132 KV Potential Transformers with junction boxes
33 KV Potential Transformers with junction boxes
132/33 KV T/F control & Protection panel ,RTCC Panel and 132 KV Bus couplar panel conventional type
Apex meter Energy meter installation
Laying of following sizes of control cable in cable trench from various equipments to control panel/ Junction box with proper dressing and saddling of cable at every 75 mm distance with MS Saddle of size 25x3 mm including carriage of cable drums from store to site and shifting back to store and fixing of cable tray as per cable schedule as per lay out and technical specifications of UPPTCL and all other associated work to complete the job.
2 Core X 2.5 Sq .mm
4 Core X 2.5 Sq .mm
6 Core X 2.5 Sq .mm
10 Core X 2.5 Sq .mm
For construction of 132 KV & 33 KV bay termination of all Control Cable as per cable schedule including making necessary hole in gland required. Supply and fixing of suitable cable gland of appropriate size, supply and providing ferrules in each core of cable and its termination with Lugs and all other associated work to complete the job.
Erection of Lattice Type main and Auxillary Structures (ABL-03 Nos.,EKR-02 Nos,ALP-15 Nos, BBR-01No,APR-02 Nos.,YMR-02 Nos.CCR-2 No,CGR-1 No,CPR-2 No,TMR-2 No,BBL-2 Nos,BTM-3 No,ATM-2 No,AXM-4 No,XPM-4 No,YMM-4No) including shorting , shifting ,Cutting , bending ,matching of hole where necessary ,streightening and other associated work to complete the job. As per technical specifications of UPPTCL including shifting of materials/equipments from store to erection site and including all other associated work to complete the job.
Stringing of Jack bus bar upto 36 mtr. long 3-phase above 132 KV main bus with Panther conductor including fixing of 120/70 KN Disc insulator/Tension/suspension fitting/ PG Clamp etc. Cutting of conductor and also shifting of all material from store to site of work and all other associated work to complete the job satisfactory.
Stringing of Jack bus bar upto 15 mtr. long 3-phase (in three sections) for 33 KV side 132 KV main bus to newly erected BTM Gantry with Zebra conductor including fixing of 120/70 KN Disc insulator/Tension/suspension fitting /PG Clamp etc.Cutting of conductor and also shifting of all material from store to site of work and all other associated work to complete the job satisfactory.
In newly constructed 132 KV & 33 KV bay proper Earthing of various Equiptment as per instruction of supervising enginner by MS Flat of following size including painting with standard quality primer then two coat of green paint.
75 x 10 mm MS Flat
50 x 6 mm MS Flat
Bay wise interconnection of equipments with Panther conductor (jumpering) of 132 KV feeder bay.
Jumpering between Main bus to BSI including clamp/connector.
Jumpering between section of BSI to Jack bus including fixing of 120/70 KN Disc insulator/Tension/Suspension fitting/ PG Clamp etc.PG Clamp
Jumpering between CB to Jack bus including fixing PG Clamp
Jumpering between CB to CT.
Jumpering (dropper) for LA making Y-Shape from jack bus by PG clamp.
Jumpering (dropper) for T/F HV making Y-Shape from jack bus by PG clamp.
Bay wise interconnection of equipments with twin Zebra conductor (jumpering) of 33 KV bay.
Jumpering between T/F LV to CT across LA.
Jumpering between CT to CB.
Jumpering between BSI to 33 KV Main bus.
Fixing of spacer clamp at an equal interval between both Zebra conductor of 33 KV Jack bus.
Earthing of 132 KV & 33 KV LA consisting of 40 mm dia,3 meter long Electrodes which is to be fabricated and piercing inside the ground and connecting all the electrodes with 75x10 mm MS Flat below 700 mm from ground level including excavation, back filling and levelling of earth.
Dismantaling, shifting ,erection and re-connection of staion transformer 33/0.4KV,fuse set,BI and power cable after it if cable found short and re-termination of control/power cable as per requirement for satisfactory completion of work.
Dismantaling and shifting of 132 KV Bus couplar bay equipment 01 No CT,01BI,01 CB and control/power cable after IT if cable found short re-laying of fresh and re-termination of control/power cable as per requirement for satisfactory completion of work.
Dismantaling and shifting of 33 KV Pathrahiya-I feeder bay equipment 03 No CT,01BI,01 CB and control/power cable after IT if cable found short re-laying of fresh and re-termination of control/power cable as per requirement for satisfactory completion of work.
Laying of eartmat in the the switchyard by digging upto 1 meter in X-Y axis in switchyard and laying of 40 mm MS round bar as per standard norms and connecting it by 40 mm MS round bar spikes of length 3 meter and grouting it in ground at edge of earthmat in the corner alongwith welding of earthmat at crossing point by double angle/MS flat ,then connecting it to main earthmat of switchyard by welding MS flat.
Installation of 132/33KV, 40 MVA T/F alongwith shifting, Erection, Centrifuging oil, earthing and commissioning and other associated work of 40MVA, 132/33 KV T/F at 132/33 KV s/s Mirzapur under ETD, Mirzapur
Complete Erection of 40 MVA T/F by erection of radiators, conservator tank, all bushing with their turrets, connecting oil pipe, cooling fans, motor drive mechanism with tap changer, RTCC panel, and associated oil pipe line etc. to complete the job satisfactorily, including first filling of oil and topping up of T/F oil in tank, radiator pipe lines, conservator tank etc and attending oil leakage, if any and all other associated work for satisfactory completion of work along with arrangement of labour and T&P to complete the job in all respect.( Hydra, crane, special tools, will be arranged by contractor.
Laying & termination of new control cables for 40 MVA T/F from control and relay panel to marshelling box / equipment / JB etc. for 40 MVA T/F as per cable schedule and inter-connection with control cable at marshalling box and OLTC panel to RTCC panel to each fan with re-ferruling and re-dressing with proper gland & ferrule etc as per drawing schedule.
Centrifuging of complete 40 MVA T/F oil in T/F & Tank by connecting Centrifuging pipes, circulating the T/F oil through centrifuging 12KL machine to be provided by the contractor & taking the BDV value of the oil periodically till the required value is achieved as per direction of supervising engineer, all T&P, labour, and centrifusing machine shall be provided by the contractor.
Earthing of erected 40 MVA T/F main tank, marshaling box, OLTC, RTCC, panel etc at two points using 75x10/50x6mm. M.S. flat the above also includes painting of earthing strip with one coat of red oxide primer and two coat of green synthetic enameled paint.
Carriage of 20KL oil tanker/ drum for the centrifuging of transformer oil where it is available within distance of 100km approx.
Conducting BDV, PPM and DGA tests of transformer oil of 40 MVA t/f job includes 03 nos. sample collection of t/f oil in suitable container tank and its transportation to NABL and submitting its test report. First job after completion of work and second job after charging of 15 days.
Shifting/ Dragging of oil filled 40 MVA T/F of m/s TAL make from store to loading point (up to 20 Meter Distance) at 132 kv s/s JIGNA
Additional shifting of 40 MVA T/F for 100 Meter (@ 5 Meter/job.
loading of oil filled main tank of the 40 MVA transformer (m/s TAL make ) on trailer at 132 kv s/s JIGNA. The Job includes jacking the T/F tank for placing the wooden sleeper and simultaneously lifting the tank by jacking & placing sleepers continuously under the tank till the wooden sleepers platform comes upto height of trailer bed, then placing the rails over the trailer bed & wooden sleeper plateform and shifting the tank on the trailer bed. finally, Removal of the rails from under the tank then, properly securing/ lashing the tank with the help of steel wire ropes and turn buckles for safe transportation of the oil filled transformer tank to 132 kv s/s MIRZAPUR
Shifting & loading of all accessorises/ item like conrvator tank, radiator, turrets, OLTC Panel, pipe lines header, HV/LV/NV Bushing in packing crates, and T/F Oil in drums etc. of 40 mva t/f (m/s TAL make) from storage place to loading points at 132Kv S/S JIGNA
safe carriage of 40 MVA T/F (M/S TAL make) tank from 132Kv S/S Jigna to 132/33 Kv S/S Mirzapur & carriage all accessorises/ item like conrvator tank, radiator, turrets, OLTC Panel, pipe lines header, HV/LV/NV Bushing in packing crates, and T/F Oil in drums etc. of 40 mva t/f (m/s TAL make) by pvt Truck/ Trailer with transit insurance to be done by contractor prior to transportation which shall be reimbused later on as per actual
unloading after opening of lashing of filled main tank of the 40 MVA T/F (m/s TAL make) at 132/33 Kv S/S Mirzapur by jacking the tank for placing the rail under the t/f shifting it on wooden sleepers platform, removing the rail under the t/f tank on wooden sleeper, lowering the tank towards the ground by slowley and removing the wooden sleeper under the tank including the various associated accessories like oil filled drums bushing, radiators, conservator tank, cooling fans, OLTC Panel , marshling box etc from trailer/ Trucks.
Replacement of all gaskets of open parts as radiators/ Bushing/ pipeline of t/f by providing and fixing of new gasket as per existing size made of rubberized cork sheet Kotika/ turboze brand grade 07
Rewinding of 3-Phase 415 Volt ,1.2 KW,700 RPM ,36'' sweep heavy duty defective cooling exhaust fan with class "B" enameled copper w ire of same gauge,changing of damaged ball bearings,rubber pads,rubber washer with new ones of same size work including dismantling and re-fixing with all cost of men,materials and T&P required for the job
Repairing of 3-Phase 415 Volt, 1.2 KW,700 RPM ,36'' sweep heavy duty cooling exhaust fan by cleaning ,servicing,changing of damaged ball bearings with new ones of same size ,work including dismantling and re-fixing with all cost of men,materials and T&P required for the job
Conducting SFRA, WRM tests of 40 MVA t/f
Shifting/ Dragging of oil filled 40 MVA T/F of m/s TAL make from store to erection site (up to 20 Meter Distance) at 132 KV S/S Mirzapur
Additional shifting of 40 MVA T/F for 100 Meter (@ 5 Meter/job. At 132/33 KV S/S Mirzapur.
Spray painting of panels with one coat of red oxide primer & two coat of standard make sythentic enamel paint of 1st quality after proper leaning of rust, dirty & oily surface by applying suitable chemical, scratching by emery paper/brush/cloth from all surfaces of transformer, OLTC panel, cooling fans & marshaling box including all accessories etc
Attending of oil leakage of 40 MVA t/f Top cover TAL make at 132/33 kv s/s Mirzapur by applying high quality of sealant and the resin-based epoxy compound of J. B. Weld make after proper tighening of nuts and bolts.
Making of Delta earthing by 40mm MS round bar and 75x10 mm MS flat including digging, welding, and connecting in earthing grid at installed transformer all other associated work. Complete the job satisfactorily with man material and T&P
Hi-tech power transmission
Technocrat Electrical
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .