| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.6 LAccepted-AOC | ₹20.6 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹21.0 L+₹38,019.50 (1.85%)Rejected-AOC | ₹21.0 L+₹38,019.50 (1.85%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | KANNA I H1 | M.RAJESWARI H2 |
|---|---|---|---|---|---|
| 1.01Autoclaved Cellular Aerated Concrete Blocks in following Cement Mortar using best quality of Blocks 600mm x 200mm x 200mm" for foundation and basement including curing, etc., complete complying with standard specifiction. | |||||
| 1.02 | first floor | 47.84 | M3 | 5,800 ₹2,77,491.78 | 5,711.16 ₹2,73,241.37 Lowest |
| 1.03Providing steel centring shuttering for sides and soffits without strutting arrangements for R.C.C. slab, bed block in ground level including all labour chargesetc., complete as per standard | |||||
| 1.04 | (a) For column first floor | 98.76 | M2 | 1,800 ₹1,77,768 | 1,000 ₹98,760 Lowest |
| 1.05 | (g) beam | 213.88 | M2 | 1,300 ₹2,78,045.17 | 1,023 ₹2,18,800.16 Lowest |
| 1.06Reinforeced cement concrete 1:1.1/2:3 (One and one and half sand and three stone jully) using 20mm gauge hard granite broken stone jelly of RCC items of works excluding centering,shuttering and also cost of reinforecement grill in position butincluding costing laying and curing etc. ,complete complying with standards specifications. | |||||
| 1.07 | Ground floor beam and roof slab | 39.57 | M3 | 8,800 ₹3,48,253.54 | 8,682.66 ₹3,43,609.9 Lowest |
| 1.08 | Supplying fabricating and placing in position of R.T.S./M.S. Rods including cost of binding wire and all labour charges etc complete as per standard spcifications. | 3,000 | Kgs | 90 ₹2,70,000 | 89.88 ₹2,69,640 Lowest |
| 1.09 | Plastering in CM 1:3 (one cement and three sand) 10 mm thick finishing including cost andconveyance of all materials to site labourcharges, watering to site labour charges,watering curring and all other incidental charges etc complete., | 200 | M2 | 310 ₹62,000 | 309.91 ₹61,982 Lowest |
| 1.10 | Plastering in CM 1:5 (one cement and five sand) 12 mm thick finishing including cost andconveyance of all materials to site labourcharges, watering to site labour charges,watering curring and all other incidental charges etc., complying with standard specification. | 455 | M2 | 290 ₹1,31,950 | 269.22 ₹1,22,495.1 Lowest |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
27 Feb 2026, 3:00 pmClosed
commissioner,
sivakasi Corporation
Construction of Community hall First floor at Ward No 35 Maruthupandiar Street in Sivakasi city Municipal corporation
2026_MAWS_665437_1
1176/2026/E1
Open Tender
Civil Works - Buildings
Works
Sivakasi Corporation
Please Refer Tender Document
2 documents required · 2 mandatory
₹0
₹25,000
Yes
8 Jul 2026
24 Feb 2026
27 Feb 2026
24 Feb 2026
27 Feb 2026
24 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Autoclaved Cellular Aerated Concrete Blocks in following Cement Mortar using best quality of Blocks 600mm x 200mm x 200mm" for foundation and basement including curing, etc., complete complying with standard specifiction. | - | - | - | - |
| 1.02 | first floor | 47.84 | M3 | 1,863.8 | ₹89,170.55 |
| 1.03 | Providing steel centring shuttering for sides and soffits without strutting arrangements for R.C.C. slab, bed block in ground level including all labour chargesetc., complete as per standard | - | - | - | - |
| 1.04 | (a) For column first floor | 98.76 | M2 | 686.8 | ₹67,828.37 |
| 1.05 | (g) beam | - | M2 | 623.4 | - |
| 1.06 | Reinforeced cement concrete 1:1.1/2:3 (One and one and half sand and three stone jully) using 20mm gauge hard granite broken stone jelly of RCC items of works excluding centering,shuttering and also cost of reinforecement grill in position butincluding costing laying and curing etc. ,complete complying with standards specifications. | - | - | - | - |
| 1.07 | Ground floor beam and roof slab | 39.57 | M3 | 1,863.8 | ₹73,758.52 |
| 1.08 | Supplying fabricating and placing in position of R.T.S./M.S. Rods including cost of binding wire and all labour charges etc complete as per standard spcifications. | 3,000 | Kgs | 256.8 | ₹7,70,400 |
| 1.09 | Plastering in CM 1:3 (one cement and three sand) 10 mm thick finishing including cost andconveyance of all materials to site labourcharges, watering to site labour charges,watering curring and all other incidental charges etc complete., | 200 | M2 | 686.8 | ₹1,37,360 |
| 1.1 | Plastering in CM 1:5 (one cement and five sand) 12 mm thick finishing including cost andconveyance of all materials to site labourcharges, watering to site labour charges,watering curring and all other incidental charges etc., complying with standard specification. | 455 | M2 | 256.8 | ₹1,16,844 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_799235.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
BOQ_799235.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .