| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC | L1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | NITHIYAKUMARAN CONTRACTOR L1 |
|---|---|---|---|---|
| 1.00Name of the work : 1. Construction of Drainage with CC Pavement at K.S Ravi Nagar II nd Steet Chandra Sekar House to Main Road H/o Balakrishnapuram Estimate amount : Rs. 16.00 Lakhs | ||||
| 2.00Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | ||||
| 3.00 | Drainage | 99 | cum | 196 ₹19,404 Lowest |
| 4.00 | Corewall | 18 | cum | 130 ₹2,340 Lowest |
| 5.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete for 10m3 | 87 | cum | 5,455 ₹4,74,585 Lowest |
| 6.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 360 | Sqm | 545 ₹1,96,200 Lowest |
| 7.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental o | 50.85 | cum | 5,725 ₹2,91,116.25 Lowest |
| 8.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 67.5 | Mt | 280 ₹18,900 Lowest |
| 9.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 50.06 | cum | 6,748 ₹3,37,804.88 Lowest |
| 10.00 | Provision for Name board cum Citizen Information Board | 1 | No | 1,900 ₹1,900 Lowest |
Tender Value
₹16 L
EMD Value
₹16,000
Closing Date
24 Feb 2026, 3:00 pmClosed
Block Development Officer (VP)
Block Development Officer (VP)
Construction of Drainage with CC Pavement at K.S Ravi Nagar II nd Steet Chandra Sekar House to Main Road H/o Balakrishnapuram
2026_RDTN_661669_1
Construction of Drainage with CC Pavement at K.S Ravi Nagar II nd Steet Chandra Sekar House to Main
Open Tender
Civil Works
Works
Construction of Drainage with CC Pavement at K.S R
Construction of Drainage with CC Pavement at K.S Ravi Nagar II nd Steet Chandra Sekar House to Main Road H/o Balakrishnapuram
4 documents required · 4 mandatory
₹0
₹16,000
Yes
Panchayat Union Office Dindigul
26 Mar 2026
20 Feb 2026
24 Feb 2026
20 Feb 2026
24 Feb 2026
20 Feb 2026
21 Feb 2026
Name of the work : 1. Construction of Drainage with CC Pavement at K.S Ravi Nagar II nd Steet Chandra Sekar House to Main Road H/o Balakrishnapuram Estimate amount : Rs. 16.00 Lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Drainage
Corewall
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete for 10m3
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental o
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Provision for Name board cum Citizen Information Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
Tendernotice_2.pdf
PDF • 0.35 MB
Tendernotice_3.pdf
PDF • 0.60 MB
BOQ_794230.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .