Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Finance | -32.45% | ₹1.1 L | L1 | Admitted-Finance |
| 2 | L2₹1.1 LAdmitted-Finance | -32.00% | ₹1.1 L | L2 | Admitted-Finance |
| 3 | L3₹1.3 LAdmitted-Finance | -21.56% | ₹1.3 L | L3 | Admitted-Finance |
| 4 | L4₹1.4 LAdmitted-Finance | -15.00% | ₹1.4 L | L4 | Admitted-Finance |
Tender Value
₹1.6 L
EMD Value
₹3,200
Closing Date
15 May 2026, 4:00 pmClosed
Er. Mohd Qasim
Executive Engineer PWD R and B Division Billawar
Please refer in BOQ
2026_PWDJK_309674_1
e-NIT No 12 of 2026-27 dated 09-05-2026
Open Tender
Civil Works
180 days
Billawar
Please refer Tender documents
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R and B Division Billawar
₹3,200
21 May 2026
9 May 2026
15 May 2026
9 May 2026
15 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables, etc. (not exceeding 1.5m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5m including getting out excavated earth and disposal of surplus excavated earth as directed lead upto 1mtr. from cutting edge. All kinds of soil. | 6.8 | Cum | 479.3 | ₹3,259.24 | 53.9 |
| 2 | Providing and laying cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:5:10 (1 cement:5 coarse sand:10 graded stone aggregate 40mm nominal size). | 0.56 | Cum | 4,826.5 | ₹2,702.84 | 35.06 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement:3 coarse sand:6 graded stone aggregate 20mm nominal size) with 20% boulders. | 3.4 | Cum | 4,774.46 | ₹16,233.16 | - |
| 4 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 4.18 | SQM | 416.5 | ₹1,740.97 | - |
| 5 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:A) 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 2.55 | Cum | 7,788.4 | ₹19,860.42 | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level A) Cold twisted bars. | 254.89 | kg | 123.2 | ₹31,402.45 | - |
| 7Centering and shuttering including strutting, propping etc.and removal of form work for : | ||||||
| 7.1 | Foundation, footings, bases of columns etc. for mass concrete. | 22.3 | Sqm | 286.35 | ₹6,385.61 | - |
| 7.2 | Suspended floors, roofs, landings, balconies and access platforms. | 4.18 | sqm | 718.2 | ₹3,002.08 | - |
| 7.3 | Edges of slabs and breaks in floors and walls Under 20 cm wide | 39.63 | mtr | 262.2 | ₹10,390.99 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.40 MB
BOQ_1002334.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid