| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.8 L+₹3,686.75 (0.22%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ARWINDAR CONSTRUCTION L2 | RAJAGANESH CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00DRAINAGE | |||||
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 258 | M3 | 186 ₹47,988 | 184.5 ₹47,601 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 45 | M3 | 5,311 ₹2,38,995 | 5,309 ₹2,38,905 Lowest |
| 3.00 | Supplying and erecting centering for vertical plain/ RCC concrete walls of supply channel, retaining wall etc upto 90Cm height with necessary supports,all cross bracing with mild steel size of 90cm x60 cm and gauge BG 10 stiffened with welded mild steel sheet angles of size 25 mm x25 mm x3mm for bearing laid silver Oak/ Country wood joist of size 7.50 cm x5.0 cm spaced @ about 90 cm C/C and supported by Casurina props of 10 cm to 13 cm spaced @ 75 cm C/C etc,, complete complaying with standered specfications and as directed by the departmental officers | 883 | M2 | 462 ₹4,07,946 | 459.5 ₹4,05,738.5 Lowest |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 119 | M3 | 6,761 ₹8,04,559 | 6,759 ₹8,04,321 Lowest |
| 5.00 | Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 145 | M2 | 165 ₹23,925 | 163.5 ₹23,707.5 Lowest |
| 6.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 1,012.5 | KG | 90 ₹91,125 | 89.5 ₹90,618.75 Lowest |
| 7.00 | Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3.- | 8.1 | M3 | 8,305 ₹67,270.5 | 8,300 ₹67,230 Lowest |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
13 Aug 2025, 3:00 pmClosed
EXECUTIVE OFFICER
CHINNALAPATTI TOWN PANCHAYAT
RETENDER 15TH FINANCE COMMISSION 2025-26 - 1ST INSTALLMENT TIED GRANT CONSTRUTION OF DRAINAGE WITH CULVERT AT 9TH WARD HOSPITAL WEST STREET -1,NEW STREET-1,13TH WARD THAMBITHOTTAM STREET NO-1 AND 1ST WARD KAMATCHI COLONY IN CHINNALAPATTY TOWN PANC
2025_DTP_586997_1
559/2025/C
Open Tender
Civil Works
Works
90 days
CHINNALAPATTI
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹20,000
19 Aug 2025
30 Jul 2025
13 Aug 2025
30 Jul 2025
13 Aug 2025
30 Jul 2025
Amount
DRAINAGE
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Supplying and erecting centering for vertical plain/ RCC concrete walls of supply channel, retaining wall etc upto 90Cm height with necessary supports,all cross bracing with mild steel size of 90cm x60 cm and gauge BG 10 stiffened with welded mild steel sheet angles of size 25 mm x25 mm x3mm for bearing laid silver Oak/ Country wood joist of size 7.50 cm x5.0 cm spaced @ about 90 cm C/C and supported by Casurina props of 10 cm to 13 cm spaced @ 75 cm C/C etc,, complete complaying with standered specfications and as directed by the departmental officers
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3.-
ARWINDAR CONSTRUCTION (BID ID -1425007)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .