| 1 | L1₹5.0 LAccepted-AOC WARD NO 2 CHAITANY COLONY MAJRI BASTI POST SHIVAJI NAGAR MAJRI DIST CHANDRAPUR | MAJRI | CHANDRAPUR | MAHARASHTRA | ₹5.0 L | L1 | Accepted-AOC AS L1 |
| 2 | L2₹6.7 L+₹1.7 L (33.2%)Rejected-Finance | ₹6.7 L+₹1.7 L (33.2%) | L2 | Rejected-Finance AS L2 |
Tender Value
₹6.7 L
EMD Value
₹8,400
Closing Date
20 May 2024, 4:00 pmClosed
Staff Officer Civil WNA
AGM Office Bhallar Township Wani North Area
Providing RCC hume pipe culvert on approach road to Bhandewada colony at Rajur under Ghonsa Sub Area. Note maximum labour required for this work 357 Nos.
2024_WCL_307533_4
wn4650-civ-e004-2024-25 Date 04.05.2024
Open Tender
Civil Works - Others
Item Rate
15 days
at Rajur under Ghonsa Sub Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,400
27 Jul 2024
6 May 2024
21 May 2024
7 May 2024
20 May 2024
7 May 2024
7 May 2024 - 14 May 2024
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / over areas (exceeding 30cm in dept h. 1.5m in width as well as 10 sqm on plant) inlcluding disposal of excavated earth lead upto 50m and lift upto 1.50m dispossed earth to be levelled & neatly deerssed All kinds of soil
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil
boulder and moorum filling in foundation including cost of all material and labour complete as per instruction-in-charge (100 cu.ft. boulderand 40 cu.ft.moorum for 100 cu.ft. finished work) inluding watering ramming and consolidating complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 40 mm nominal size derived from natural sources).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, ifnishing and reinforcement- All work up to plinth level : 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : Water thinnable cement primer
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying non-pressure NP3 class (Heavyt duty) RCC pipes with collars jointed with stiff mixture of cement morter in the proportion of 1:2 (1cement : 2 fine sand) including testing of joints etc. complete : 1200 mm dia. RCC pipe
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30cm in dept h. 1.5m in width as well as 10sqm un plan) including disposal of excavated earth lead upto 50m and lift upto 1.50m dispossed earth to be levelled & neatly deerssed-All kinds of soil
Providing and laying non-pressure NP3 class (Heavy duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete: 1200 mm dia. R.C.C. Pipe Labour rate Only)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening binding Materials to fill up the interstices of coarse aggregate. watering and compacting to the required density as per clause 404 of specification. By Manual Means (i) Grading (63 to 45mm) (a) Using Screening Type-A (13.2mm Agg 1
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per clause 404 of specification. By Manual Means (ii) Grading-11 153 to 22.4mm (a) Using Screening Type-B (11.2mm Agg)
Total impact of GST for the purpose of CTC
HAIDRI CONSTRUCTION
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_318686.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .