Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.1 L
EMD Value
₹4,500
Closing Date
10 Sept 2026, 3:00 pmClosed
ZONAL OFFICER-5
NO.61,BASIN BRIDGE ROAD, CHENNAI-600021
Improvements of Pump Room at East Kalmandapam Road in Dn-50, Unit-12, Zone-5
2026_CoC_701876_1
Z.O.V.C.NO.E1/234/2026
Open Tender
Civil Works
Works
120 days
CHENNAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,500
15 Oct 2026
6 Sept 2026
10 Sept 2026
6 Sept 2026
10 Sept 2026
6 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanica...2.40m Footing Depth. (including Refilling charges | 30 | CUM | 368.55 | ₹11,056.5 |
| 2 | Conveyance by roads in plains 0 to 10 km including Loading unloading and transportation charges | 30 | CUM | 225 | ₹6,750 |
| 3 | Supplying and filling in foundation, basement, etc...tion and as directed by the departmental officers. | 0.5 | CUM | 391.95 | ₹195.98 |
| 4 | Plain Cement Concrete 1:2:4 (one cement, two crush...departmental officers.-Mixing by mechanical means | 1.5 | SQM | 7,255.21 | ₹10,882.82 |
| 5 | Supplying and erecting centering for plane surface...g shall be given after the concrete is laid).BEAM | 3 | SQM | 1,267.76 | ₹3,803.28 |
| 6 | Supplying and erecting steel centering including n...l be given after the concrete is laid). FOUNDATION | 4.5 | SQM | 756.34 | ₹3,403.53 |
| 7 | Supplying, fabricating and placing in position Rib...t and binding wire) Above plinth / Basement level | 250 | KGS | 98.7 | ₹24,675 |
| 8 | Providing and laying in position, Standardised Con...the Department for the excess usage of materials). | 1 | CUM | 8,197.92 | ₹8,197.92 |
| 9 | Providing and laying, spreading and compacting gra... Is Applicable Only If Work Is Done During Night) | 4 | CUM | 2,734.71 | ₹10,938.84 |
| 10 | Providing and laying in position, standardised con...the Department for the excess usage of materials). | 4 | CUM | 8,015.86 | ₹32,063.44 |
stage.html
html • 0.02 MB
finance_843709.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
234.pdf
Tender Documents • 1.61 MB
BOQ_843709.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .