Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹54.7 L+₹1.7 L (3.27%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹57.4 L+₹4.4 L (8.32%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s S.B.S. Traders L1 | M/s Arya Construction L2 | M/s Electro Shine India L3 |
|---|---|---|---|---|---|---|
| 0.00fo|qr uxjh; forj.k [k.M&Jh xksj[kukFk] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r ttZj ,0ch0 dscyksa dks cnyus ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k | ||||||
| 1.00Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- | ||||||
| 1.01 | LT AB Cable (3X120+1X95+1X16) sq mm | 27.73 | Km | 15,000 ₹4,15,950 Lowest | 15,500 ₹4,29,815 | 16,000 ₹4,43,680 |
| 1.02 | PCC Pole 8.5 Mtr | 121 | No | 1,000 ₹1,21,000 Lowest | 1,050 ₹1,27,050 | 1,100 ₹1,33,100 |
| 1.03 | Earthing complete | 121 | No | 20 ₹2,420 Lowest | 25 ₹3,025 | 30 ₹3,630 |
| 2.00Supply of following material/fitting complete in all respect :- | ||||||
| 2.01 | LT Cable 1X35 sq mm | 1,008 | M | 90 ₹90,720 Lowest | 100 ₹1,00,800 | 120 ₹1,20,960 |
| 2.02 | GI Nuts & bolts of different sizes | 53 | Kg | 250 ₹13,250 Lowest | 260 ₹13,780 | 270 ₹14,310 |
| 2.03 | LT pole Clamp with nuts & bolts | 121 | No | 350 ₹42,350 Lowest | 360 ₹43,560 | 370 ₹44,770 |
| 2.04 | LT Three Phase Distribution box | 84 | No | 2,380 ₹1,99,920 Lowest | 2,400 ₹2,01,600 | 2,500 ₹2,10,000 |
Tender Value
Refer Docs
EMD Value
₹53,000
Closing Date
10 Jun 2026, 4:00 pmClosed
SUPERINTENDING ENGINEER EUDC GKP
SE EUDC GKP, BUNGALOW NO. 09, OLD POWER HOUSE COLONY, RAILWAY STATION ROAD, GORAKHPUR.
For the work of AB Cable Reconductoring, Damaged LT Pole Replacement and Bus Coupler sanctioned under Business Plan 2026-27 in areas under Electricity Urban Distribution Division- Sri Gorakhnath, Gorakhpur
2026_PVVNV_1155214_1
09/EUDC(G)/2026-27
Open Tender
Electrical Works
Lump-sum
30 days
EUDD II SRI GORAKHNATH
Please refer Tender documents.
2 documents required · 2 mandatory
₹53,000
SUPERINTENDING ENGINEER EUDC
₹53,000
23 Jun 2026
29 May 2026
11 Jun 2026
29 May 2026
10 Jun 2026
29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0fo|qr uxjh; forj.k [k.M&Jh xksj[kukFk] xksj[kiqj ds vUrxZr fctusl Iyku 2026&27 esa Lohd`r ttZj ,0ch0 dscyksa dks cnyus ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k | |||||
| 1Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- | |||||
| 1.01 | LT AB Cable (3X120+1X95+1X16) sq mm | 27.73 | Km | - | - |
| 1.02 | PCC Pole 8.5 Mtr | 121 | No | - | - |
| 1.03 | Earthing complete | 121 | No | - | - |
| 2Supply of following material/fitting complete in all respect :- | |||||
| 2.01 | LT Cable 1X35 sq mm | 1,008 | M | - | - |
| 2.02 | GI Nuts & bolts of different sizes | 53 | Kg | - | - |
| 2.03 | LT pole Clamp with nuts & bolts | 121 | No | - | - |
| 2.04 | LT Three Phase Distribution box | 84 | No | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.89 MB
TenderForm09.docx
Tender Documents • 0.14 MB
BOQ_2164020.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .