| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹3.1 L+₹9,344.75 (3.12%)Admitted-Finance 36 1 1 H 2 PULAN KHATIK ROAD KOLKATA 15 KOLKATA KOLKATA 700015 | KOLKATA | WEST BENGAL | 700015 | L2 | Admitted-Finance | ||
| 3 | L3₹3.3 L+₹29,591.71 (9.88%)Admitted-Finance 303 B D H ROAD KOLKATA 700034 | KOLKATA | WEST BENGAL | 700034 | L3 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
9 Oct 2026, 12:00 pmClosed
EX-ENG-IX
THE KOLKATA MUNICIPAL CORPORATION 11,BELVEDERE ROAD KOLKATA-700027
REPAIRING OF BUSTEE I.P. PASSAGE AT 1 TO 44/10 DURGAPORE LANE , 18 TO 20/1 CHETLA HAT ROAD AND SURROUNDING AREA IN WARD NO 074
2026_KMC_1043521_1
KMC/IX/074/2026-2027
Open Tender
CIVIL WORKS
Percentage
60 days
BR-IX
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
13 Oct 2026
29 Sept 2026
12 Oct 2026
29 Sept 2026
9 Oct 2026
29 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.5 | %M3 | 11,927 | ₹5,963.5 |
| 2 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 2. Labour for laying single brick flat soling including ramming and dressing bed to proper level and filling joints with powdered earth. | 182.67 | SQM | 40 | ₹7,306.8 |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | 274 | SQM | 361 | ₹98,914 |
| 4 | 35mm thick Cement Concrete Pavement (1:2:4) in floor/footpath etc. with graded stone chips 11.2mm down,properly leveled with 3mm thick screen on top by cement slurry [email protected] cement per Sqm. Rounding off corners, chequering as required including taking necessary protective measure complete in Gr.floor/footpath. | 456.78 | SQM | 244 | ₹1,11,453.83 |
| 5 | Raising cover and frame of Special Inspection Pit with CBW (1:4), 250 mm thick up to 100mm high with 20mm thick sand and cement plaster (1:4) including finishing with neat cement after cutting the asphaltum pavement taking out and re-fixing the existing cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. | 6 | EA | 1,511.81 | ₹9,070.86 |
| 6 | SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC.8.Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D) (viii) 5 MT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size (viii) 5 MT load bearing capacity gully pit cover with frame and hinge arrangement for opening of size Cover: 470 mm X 420 mm X 80 mm Frame: 590 mm X 550 mm X 170 mm opening: 380mm x 305mm Weight: 100 kg (approx) | 6 | EA | 2,001 | ₹12,006 |
| 7 | SANITARY AND DRAINAGE WORKS (B)-(IV)INSPECTION PIT,SEPTIC TANK,SOAK PIT ETC.8.Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S-12592(M.D) (vii) 3 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of size Cover: 450 mm X 50 mm Frame: 540 mm X 100 mm opening: 370mm weight:46kg approx | 5 | EA | 1,319 | ₹6,595 |
| 8 | Sub Total | - | - | - | - |
| 9 | GST 18% | 1 | Nos. | - | - |
| 10 | CESS 1% | 1 | Nos. | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
TF_74_02.pdf
Tender Documents • 0.76 MB
BOQ_2560362.xls
BOQ • 0.24 MB
ROAD.pdf
Additional Documents • 2.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .