Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33,670.35Admitted-Finance AIGAVAN UPARHAR DHARM RAJ MISHRA AIGAVAN UPARHAR MAHILA UPARHAR KARARI KAUSHAMBI UTTAR PRADESH 212216 UDYAM UP 46 0007784 | KAUSHAMBI | UTTAR PRADESH | 212216 | -5.50% | ₹33,670.35 | L1 | Admitted-Finance |
Tender Value
₹12 L
EMD Value
₹24,000
Closing Date
16 Feb 2026, 6:00 pmClosed
EE PHED Dn Merta city
Near Meera Dwar Merta city
Leakage Removal in UWSS Merta city Sub Division Merta Dist Nagaur(ARC)
2026_PHCJA_534419_1
NIT No 61/2025-26 EE PHED DN Merta
Open Tender
Civil Works - Water Works
365 days
Merta city
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MD RISL
₹24,000
Yes
16 Mar 2026
2 Feb 2026
17 Feb 2026
2 Feb 2026
16 Feb 2026
2 Feb 2026
Rates are based on PHED Circle Ajmer BSR 2021 Repairing of leakage in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated trench / Pit / Road shall be done Properly I.e. after a layer of 20 cm. with proper watering and ramming in layers , for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen Store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil AC/PVC/HDPE pipe
Add on above item no. 1.1.1 for B.T. Road ( 5% amount above rate)
Add on above item no. 1.1.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only. ( 15% amount above rate)
Add on above no. 1.1.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. ( 20% amount above rate)
Add on above no. 1.1.1 item if depth of pipeline is above 3.0 mtr. ( 30% amount above rate)
Repairing of leakage in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including taking out the burst pipe from trench, dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material, tightening of CID Joints to make repair leak proof and then refilling of excavated trench / Pit / Road shall be done Properly I.e. after a layer of 20 cm. with proper watering and ramming in layers , for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen Store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) In all type Soil
Add on above item no. 1.2.1 for B.T. Road ( 5% amount above rate)
Add on above item no. 1.2.1 for C.C. Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only. ( 15% amount above rate)
Add on above no. 1.2.1 item if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. ( 20% amount above rate)
Add on above no. 1.2.1 item if depth of pipeline is above 3.0 mtr. ( 30% amount above rate)
Replacement of CI/ DI Double flange sluice valves,non return valves,butter fly valves etc. in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refilling of excavated trench / Pit / Road shall be done Properly I.e. after a layer of 20 cm. with proper watering and ramming in layers , for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen Store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) In all type Soil
Add on above item no. 1.4.1 for B.T. Road ( 5% amount above rate)
Add on above item no. 1.4.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only. ( 15% amount above rate)
Add on above item no. 1.4.1 if depth of pipe line is above 1.5 mtr to 3.0 mtr ( 20% amount above rate)
Deduct on above item no. 1.4.1 if valve is fixed at plinth level / platform i.e. no excavation is required ( 20% amount above rate)
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/ uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated trench / Pit / Road shall be done Properly I.e. after a layer of 20 cm. with proper watering and ramming in layers , for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen Store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. In all type Soil
Add on above item no. 1.5.1 for B.T. Road ( 5% amount above rate)
Add on above item no. 1.5.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only. ( 15% amount above rate)
Add on above item no. 1.5.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. ( 20% amount above rate)
Add on above item no. 1.5.1 if depth of pipe line is above 3.0 mtr. ( 30% amount above rate)
Removal of Choking from pipe line, including tree roots, malba, sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refilling of excavated trench / Pit / Road shall be done Properly I.e. after a layer of 20 cm. with proper watering and ramming in layers , for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Jen Store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit.
Add on above item no. 1.6.1 for B.T. Road ( 5% amount above rate)
Add on above item no. 1.6.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only. ( 15% amount above rate)
Add on above item no. 1.6.1 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. ( 20% amount above rate)
Add on above item no. 1.6.1 if depth of pipe line is above 3.0 mtr ( 30% amount above rate)
Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixing of clamp revolving it 180 degree then refilling of excavated trench / Pit / Road shall be done Properly I.e. after a layer of 20 cm. with proper watering and ramming in layers , for entire job contractor will use his own T&P & labour.
Add on above item no. 1.7 for B.T. Road ( 5% amount above rate)
Add on above item no. 1.7 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only. ( 15% amount above rate)
Add on above item no. 1.7 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr ( 20% amount above rate)
Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated trench / Pit / Road shall be done Properly I.e. after a layer of 20 cm. with proper watering and ramming in layers , for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost).
80 mm to 110 mm
125 mm to 165 mm
200 mm to 300 mm
Add on above item no. 1.9.1 for B.T. Road ( 5% amount above rate)
Add on above item no. 1.9.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only. ( 10% amount above rate)
Add on above item no. 1.9.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr ( 20% amount above rate)
Work of Inter Connection in CI/DI/MS pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refilling of excavated trench / Pit / Road shall be done Properly I.e. after a layer of 20 cm. with proper watering and ramming in layers , for entire job contractor will use his own T&P & labour and will arrange transportation of material required from Store. (Material such as Tee/ Tee Clamp/rubber sheet/ CID joints required for inter connection shall be provided by the department free of cost). In all type Soil
80 mm to 100 mm
125 mm to 150 mm
200 mm to 300 mm
Add on above item no.1.10.1 for B.T. Road ( 5% amount above rate)
Add on above item no.1.10.1 for CC Road. Pit in CC Road shall be cut in optimum size through CC Cutter machine only. ( 15% amount above rate)
Add on above item no.1.10.1 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr ( 20% amount above rate)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.88 MB
BOQ_952292.xls
BOQ • 0.38 MB
61.pdf
Tender Documents • 0.76 MB
Download all tender documents and submit your bid