| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.6 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹21.4 L+₹91,407 (4.47%)Rejected-Finance | L2 | Rejected-Finance Bidder Quoted high rate | |
| 3 | L3₹22.5 L+₹2.1 L (10.2%)Rejected-Finance | L3 | Rejected-Finance Bidder Quoted high rate | |
| 4 | L4₹22.5 L+₹2.1 L (10.2%)Rejected-Finance 301 CHAMUNDA ENCLAVE PLOT NO 89 AIROLI SECTOR 8A NAVI MUMBAI 400 708 | THANE | MAHARASHTRA | 400708 | L4 | Rejected-Finance Bidder Quoted high rate | |
| 5 | L5₹22.6 L+₹2.1 L (10.4%)Rejected-Finance | L5 | Rejected-Finance Bidder Quoted high rate |
| Sl No | Description | Qty | Unit | SANJAY KAUSHIK L10 | BIJAY MITTAL L1 | GEETA CONSTRUCTION L12 | KARMA TSETEN BHUTIA L9 | DHARMINDER SINGH L8 | M/S S. S CHETTRI AND SONS L6 | RAAJ BANGAR L11 | S K ENTERPRISES L4 | KAMLESH ENTERPRISE L2 | MAHENDRA KHAWAS L7 | MANOJ VERMA L5 | M/S ANIL KUMAR THAKUR L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down chowkats or frames with shutter of any description (without taking down shutter from the frame) not exc. 1.5 Sqm each and removing from site complete all as directed. | 10 | Each | 325 ₹3,250 | 250 ₹2,500 Lowest | 338 ₹3,380 | 315 ₹3,150 | 250 ₹2,500 Lowest | 250 ₹2,500 Lowest | 325 ₹3,250 | 280 ₹2,800 | 270 ₹2,700 | 300 ₹3,000 | 290 ₹2,900 | 275 ₹2,750 |
| 2.00 | Taking down chowkats or frames with shutter of any description (without taking down shutter from the frame) exc. 1.5 Sqm but not exc. 4 Sqm each and removing from site complete all as directed. | 30 | Each | 380 ₹11,400 | 300 ₹9,000 Lowest | 395 ₹11,850 | 385 ₹11,550 | 380 ₹11,400 | 300 ₹9,000 Lowest | 400 ₹12,000 | 330 ₹9,900 | 315 ₹9,450 | 340 ₹10,200 | 350 ₹10,500 | 350 ₹10,500 |
| 3.00 | Taking down shutters of any description exc 1 Sqm and n.exc 2 Sqm each and removal from site complete all as directed. | 84 | Per Leaf | 155 ₹13,020 | 120 ₹10,080 Lowest | 161 ₹13,524 | 155 ₹13,020 | 150 ₹12,600 | 150 ₹12,600 | 165 ₹13,860 | 130 ₹10,920 | 120 ₹10,080 Lowest | 150 ₹12,600 | 135 ₹11,340 | 160 ₹13,440 |
| 4.00 | Taking down shutters of any description n exc 1 Sqm each and removal from site complete all as specified and as directed. | 12 | Per Leaf | 140 ₹1,680 | 110 ₹1,320 Lowest | 146 ₹1,752 | 145 ₹1,740 | 120 ₹1,440 | 150 ₹1,800 | 150 ₹1,800 | 120 ₹1,440 | 120 ₹1,440 | 125 ₹1,500 | 125 ₹1,500 | 130 ₹1,560 |
| 5.00 | Dismantling timber scantlings 40 Sqcm and over in section, in unframed work in any position complete all as directed | 0.6 | Cum | 990 ₹594 | 800 ₹480 | 1,030 ₹618 | 975 ₹585 | 750 ₹450 Lowest | 900 ₹540 | 1,000 ₹600 | 950 ₹570 | 910 ₹546 | 960 ₹576 | 980 ₹588 | 975 ₹585 |
| 6.00 | M&L for 2nd class hard wood scantling, timber fixed clean swan complete all as specified & as directed. | 0.6 | Cum | 92,000 ₹55,200 | 84,000 ₹50,400 Lowest | 95,680 ₹57,408 | 89,700 ₹53,820 | 85,000 ₹51,000 | 90,000 ₹54,000 | 90,200 ₹54,120 | 89,000 ₹53,400 | 85,500 ₹51,300 | 89,000 ₹53,400 | 91,200 ₹54,720 | 94,000 ₹56,400 |
| 7.00 | S&F 2nd class hard wood Plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered, put together with glue pinned at joints, complete all as specified and as directed. | 1.5 | Cum | 92,000 ₹1,38,000 | 84,000 ₹1,26,000 Lowest | 95,680 ₹1,43,520 | 89,600 ₹1,34,400 | 95,000 ₹1,42,500 | 90,000 ₹1,35,000 | 90,900 ₹1,36,350 | 87,500 ₹1,31,250 | 86,000 ₹1,29,000 | 88,000 ₹1,32,000 | 89,500 ₹1,34,250 | 91,000 ₹1,36,500 |
| 8.00 | S&F factory made 35 mm thick 2nd class hardwood plain framed, panelled shutter (two panel) with lock rail and panel of 9 mm B.W.P. commercial ply or 12 mm veneered particle board with commercial veneering on both faces. The size of rail and stile as per IS : 1003 (Part I), kiln seasoned and chemically pressure treated complete all as specified and as directed. | 20 | Sqm | 5,000 ₹1,00,000 | 4,500 ₹90,000 Lowest | 5,200 ₹1,04,000 | 4,800 ₹96,000 | 5,200 ₹1,04,000 | 4,800 ₹96,000 | 4,850 ₹97,000 | 4,800 ₹96,000 | 4,600 ₹92,000 | 4,750 ₹95,000 | 4,900 ₹98,000 | 4,750 ₹95,000 |
| 9.00 | S&F 35mm thick 2nd class class hard wood glazed and skelton shutter, open rebated and prepared to receive glass gauze etc, divided into squares (with sash bar), edges of framing plain, chamfered or rounded, fitted with cut and mitred beads for securing glass exc., size of members of shutter as specified in SSR part-I, sec 8 clause 8.24(a), supplied and fitted to chowkats, complete all as specified and directed. | 17 | Sqm | 5,000 ₹85,000 | 4,450 ₹75,650 Lowest | 5,200 ₹88,400 | 4,700 ₹79,900 | 4,600 ₹78,200 | 4,800 ₹81,600 | 4,700 ₹79,900 | 4,800 ₹81,600 | 4,600 ₹78,200 | 4,600 ₹78,200 | 4,800 ₹81,600 | 4,700 ₹79,900 |
| 10.00 | S&F 30 mm thick Flush door shutter, solid core construction, with block board core and plywood face panels. Commercial type on one side and other face covered with decorative face veneer with 6mm thick teak wood lipping / frame to match complete all as specified and as directed. | 15 | Sqm | 5,000 ₹75,000 | 4,400 ₹66,000 Lowest | 5,200 ₹78,000 | 4,750 ₹71,250 | 4,800 ₹72,000 | 4,700 ₹70,500 | 4,780 ₹71,700 | 4,800 ₹72,000 | 4,650 ₹69,750 | 4,650 ₹69,750 | 4,850 ₹72,750 | 4,650 ₹69,750 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
18 Sept 2026, 6:00 pmClosed
GE Gangtok
GE Gangtok New Mil Stn Gangtok Sikkim
REPAIRS TO JOINERY, FLOORING, ROOFS, PLUMBING WORKS AND OTHER CONNECTED WORKS AT CERTAIN LOCATION AT NEW MIL STN UNDER GE GANGTOK
2026_MES_785791_1
C/8493/A/E8
Open Tender
Miscellaneous Works
Works
180 days
GE Gangtok New Mil Stn Gangtok Sikkim
As per tender document
8 documents required · 8 mandatory
₹500
GE Gangtok
₹40,000
Yes
8 Oct 2026
21 Aug 2026
23 Sept 2026
21 Aug 2026
18 Sept 2026
4 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down chowkats or frames with shutter of any description (without taking down shutter from the frame) not exc. 1.5 Sqm each and removing from site complete all as directed. | 10 | Each | - | - |
| 2 | Taking down chowkats or frames with shutter of any description (without taking down shutter from the frame) exc. 1.5 Sqm but not exc. 4 Sqm each and removing from site complete all as directed. | 30 | Each | - | - |
| 3 | Taking down shutters of any description exc 1 Sqm and n.exc 2 Sqm each and removal from site complete all as directed. | 84 | Per Leaf | - | - |
| 4 | Taking down shutters of any description n exc 1 Sqm each and removal from site complete all as specified and as directed. | 12 | Per Leaf | - | - |
| 5 | Dismantling timber scantlings 40 Sqcm and over in section, in unframed work in any position complete all as directed | 0.6 | Cum | - | - |
| 6 | M&L for 2nd class hard wood scantling, timber fixed clean swan complete all as specified & as directed. | 0.6 | Cum | - | - |
| 7 | S&F 2nd class hard wood Plain, solid, straight chowkats and frames, wrought, framed rebated on the solid, rounded or chamfered, put together with glue pinned at joints, complete all as specified and as directed. | 1.5 | Cum | - | - |
| 8 | S&F factory made 35 mm thick 2nd class hardwood plain framed, panelled shutter (two panel) with lock rail and panel of 9 mm B.W.P. commercial ply or 12 mm veneered particle board with commercial veneering on both faces. The size of rail and stile as per IS : 1003 (Part I), kiln seasoned and chemically pressure treated complete all as specified and as directed. | 20 | Sqm | - | - |
| 9 | S&F 35mm thick 2nd class class hard wood glazed and skelton shutter, open rebated and prepared to receive glass gauze etc, divided into squares (with sash bar), edges of framing plain, chamfered or rounded, fitted with cut and mitred beads for securing glass exc., size of members of shutter as specified in SSR part-I, sec 8 clause 8.24(a), supplied and fitted to chowkats, complete all as specified and directed. | 17 | Sqm | - | - |
| 10 | S&F 30 mm thick Flush door shutter, solid core construction, with block board core and plywood face panels. Commercial type on one side and other face covered with decorative face veneer with 6mm thick teak wood lipping / frame to match complete all as specified and as directed. | 15 | Sqm | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_880556.xls
BOQ • 0.30 MB
Tenderdocuments8493A.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .