Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | -32.54% | ₹1.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.7 L+₹1,067.40 (0.64%)Admitted-Fee/PreQual/Technical/Finance | -32.11% | ₹1.7 L+₹1,067.40 (0.64%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.8 L+₹12,039.24 (7.19%)Admitted-Fee/PreQual/Technical/Finance | -27.69% | ₹1.8 L+₹12,039.24 (7.19%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.9 L+₹19,014.55 (11.4%)Admitted-Fee/PreQual/Technical/Finance | -24.88% | ₹1.9 L+₹19,014.55 (11.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹4,960
Closing Date
25 Aug 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SMC REGAL LANE LAL CHOWK
Upgradation/cement concrete lane from H/O Shabir Ahmad Bhat at Chesti colony Lane No.01 Mulfaq Burzahama
2026_HAUDD_319413_5
NOTICE INVITING ETENDER No. 25 of 2026-2027 Dated 04.08.2026 RRWD SMC
Open Tender
Civil Works
Percentage
60 days
Chesti colony Lane No.01 Mulfaq Burzahama
PLEASE REFER TO TENDER DOCUMENT
2 documents required · 2 mandatory
₹202
FA/CAO AC NO 0216010200000007
₹4,960
29 Aug 2026
5 Aug 2026
27 Aug 2026
6 Aug 2026
25 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Engagement of Labourers for site clearance | 6 | No. | 553 | ₹3,318 |
| - | Providing and laying stone soling laid hand packed | 16.98 | Cum | 850 | ₹14,433 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 8.49 | Cum | 5,202.9 | ₹44,172.62 |
| - | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 11.21 | Cum | 7,104.2 | ₹79,638.08 |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more | 784.7 | Kgs | 123.2 | ₹96,675.04 |
| - | Carriage of Material by Mechanical Transport: Sand/Aggregate | 26.59 | Cum | 375.89 | ₹9,994.92 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_1058620.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .