Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | ₹2.7 L Quoted ₹3.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.0 LRejected-AOC | ₹4.0 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M/S.KSM Engineering L2 | M/s. KSR Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for draining the oil from the gear box, cleaning the worm wheel worm shaft with neat cloth checking the blue matching, radial run out, backlash, arresting of oil leak if any. Dismantling the coolers, cleaning and refixing the above oil coolers. Removing the gear box bottom cover and inspection of vertical shaft lower thrust and radial bearing. Clearing the oil pump, inspection of Hi flex coupling cleaning, greasing, including transportation of materials from and to stores, cost of consumables and T&P's. | 6 | Nos | 47,500 ₹2.9 L | 46,700 ₹2.8 L |
| 2.00 | Charges for dismantling of lub oil cooler from Lub oil system, cleaning flushing the cooler oil pipe lines, water pipe lines, oil separator tank, checking of water line valves and nipple, replacement of wornout parts and reassembling the same conducting pressure test of cooler bundle for any tube puncture and plugging if necessary or changing the cooler bundle as per the instruction of site Engineer in charge. Checking of joy coupling L 110 of motor and pump alignment lub oil pump & motor after cleaning the bed portion and adding / removal of necessary shims of necessary conducting trial run after reassembling as per the direction of Engineers in charge including consumables welding electrode, etc., and T&P’s. | 6 | Mills | 18,500 ₹1.1 L | 17,900 ₹1.1 L |
Tender Value
Refer Docs
EMD Value
₹3,700
Closing Date
12 Aug 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI Circle AOH 25 26 MPM Dn Unit II Mills 2A 2B 2C 2D 2E 2F Checking the gear box internals overhauling of the LOP coolers flushing the lines and Checking the alignment works during Annual Overhaul for the year 2025 26
2025_EB_586569_1
CE SE MI NCTPS I 142 25 26
Open Tender
Power/Energy Projects/Products
45 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,700
Yes
17 Apr 2026
30 Jul 2025
13 Aug 2025
30 Jul 2025
12 Aug 2025
30 Jul 2025
Amount
Charges for draining the oil from the gear box, cleaning the worm wheel worm shaft with neat cloth checking the blue matching, radial run out, backlash, arresting of oil leak if any. Dismantling the coolers, cleaning and refixing the above oil coolers. Removing the gear box bottom cover and inspection of vertical shaft lower thrust and radial bearing. Clearing the oil pump, inspection of Hi flex coupling cleaning, greasing, including transportation of materials from and to stores, cost of consumables and T&P's.
Charges for dismantling of lub oil cooler from Lub oil system, cleaning flushing the cooler oil pipe lines, water pipe lines, oil separator tank, checking of water line valves and nipple, replacement of wornout parts and reassembling the same conducting pressure test of cooler bundle for any tube puncture and plugging if necessary or changing the cooler bundle as per the instruction of site Engineer in charge. Checking of joy coupling L 110 of motor and pump alignment lub oil pump & motor after cleaning the bed portion and adding / removal of necessary shims of necessary conducting trial run after reassembling as per the direction of Engineers in charge including consumables welding electrode, etc., and T&P’s.
M/S.KSM Engineering (BID ID -1424745)
stage.html
html • 0.04 MB
techsummary_700650.pdf
BOQ Comparative Chart
xlsx
finsummary_700650.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_700650.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid