Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹30.8 L
EMD Value
₹61,560
Closing Date
8 Sept 2026, 4:00 pmClosed
Executive Engineer
R and B Division Karan Nagar Srinagar
Upgradation / Beautification of Animal House at GMC Srinagar
2026_PWDJK_322551_1
etendering NIT 31 Karan Nagar Srinagar
Open Tender
Civil Works
Percentage
45 days
GMC
MOU as per eNIT
4 documents required · 4 mandatory
₹1,100
Executive Engineer
₹61,560
10 Sept 2026
27 Aug 2026
9 Sept 2026
27 Aug 2026
8 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Part | |||||
| 2 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles 10 mm to 25 mm | 52.97 | sqm | 57 | ₹3,019.29 |
| 3 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meters lead. | 14.99 | sqm | 38.9 | ₹583.11 |
| 4 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge 1:3:6 or richer mix (i/c equivalent design mix) | 14.29 | cum | 1,725.2 | ₹24,653.11 |
| 5 | Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of G.S. Sheet | 27.88 | sqm | 125.35 | ₹3,494.76 |
| 6 | Dismantling wood work in frames, trusses, purlins and rafters upto 10 meters span and 5 meters height including stacking the material within 50 meters lead Of sectional area 40 sqcm. and above | 0.12 | cum | 3,488.65 | ₹418.64 |
| 7 | Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 meters lead. | 52.43 | sqm | 43.6 | ₹2,285.95 |
| 8 | Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position. Budloo / Fir wood | 1 | cum | 40,509.4 | ₹40,509.4 |
| 9 | Providing and fixing 20mm thick wooden planks ceiling (frame work for base to be paid for separately) with M.S. screws .12.34.5 Budloo/fir wood | 52.43 | sqm | 763 | ₹40,004.09 |
| 10 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil 50 meter beyond 1m from cutting edge | 7.82 | cum | 673.3 | ₹5,265.21 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_1082271.xls
BOQ • 0.47 MB
EXTENSION31.pdf
PDF • 0.72 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .