Loading…
Loading…
Tender Value
₹97,000
EMD Value
₹1,940
Closing Date
31 Aug 2026, 6:00 pm7d left
xen rew udhampur
xen rew udhampur
boq
2026_RDPR_321727_14
2nd CALL e-NIT No. 115 REW UDHAMPUR of 2026-27 Dated 18-08-2026
Open Tender
Civil Works
Percentage
60 days
udhampur
nit
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹1,940
21 Aug 2026
21 Aug 2026
1 Sept 2026
21 Aug 2026
31 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge In cement mortar | 3.06 | cum | 1,740.45 | ₹5,325.78 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 2.01 | cum | 4,826.5 | ₹9,701.27 |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 11.4 | cum | 4,490 | ₹51,186 |
| 4 | 20mm Cement plaster of mix | 16.1 | SQM | 362.65 | ₹5,838.67 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 | 0.43 | CUM | 6,540.45 | ₹2,812.39 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 | 0.68 | CUM | 5,733.6 | ₹3,898.85 |
| 7 | A) Foundations, footings, bases for columns | 2.7 | SQM | 286.35 | ₹773.15 |
| 8 | a) Cement | 1.5 | MT | - | - |
| 9 | b) Sand | 5 | CUM | - | - |
| 10 | c) Stone Aggregates | 2.8 | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1075419.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].