| 1 | 1₹1.9 LAccepted-AOC | ₹1.9 L | 1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | hariharan L1 |
|---|---|---|---|---|
| 1.00 | Dismantling and removing the existing floor tiles including cost of labour charges, lead, lift, etc., complete as per standard specification. | 34 | m² | 67 ₹2,278 |
| 2.00 | Dismantling and removing the existing Plain cement concrete including cost of labour charges, lead, lift, etc., complete as per standard specification. | 10 | m3 | 526 ₹5,260 |
| 3.00 | Filling using gravel for foundation and basement or wherever necessary in well rammed including filling charges as per standard specification (watering & consolidation) including with all leads, lifts, as per specification etc., complete. | 10 | m3 | 599 ₹5,990 |
| 4.00 | Plain cement concrete in CC 1:3:6, using 40mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete. | 4 | m3 | 6,014 ₹24,056 |
| 5.00 | Reinforced cement concrete in C.C. 1:1 ½ :3 mix using 12 to 20mm HBG machine crushed metal for Raft including cost of cement, all materials, labour, curing, vibration charges, without shuttering all leads, lifts, as per standard specification, etc., complete. (but excluding cost of steel reinforcement.) | 4 | m3 | 9,426 ₹37,704 |
| 6.00 | Supplying and laying of vitrified tiles of approved quality and colour with ISI mark, laid in PCC 1:4:8, CM1:3, 20mm thick and pointing with white cement using 0.40kg/m2 including finishing the joint , and pointing flush with tile surface including cost of all materials,lead, lift, labour, curing etc., complete. | 34 | m² | 1,846 ₹62,764 |
| 7.00 | Providing steel reinforcement RTS rods up to 16 mm dia for reinforced concrete works, including cost of steel rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete. | 270 | kgs | 93 ₹25,110 |
| 8.00 | Disposal of excess of surplus earth away in low lying area with a head load lead 100m including spreading, levelling, labour, leads, lifts etc., complete, as per standard specification. | 44 | m3 | 71 ₹3,124 |
| 9.00 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹14,965.74 |
| 10.00 | CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | Lumpsum | 9 ₹14,965.74 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
27 Nov 2025, 2:00 pmClosed
SE/CEDC/North/CBE
O/o, The Superintending Engineer, CEDC/North, Coimbatore.
SE/CEDC/N/CBE/C/No.22/25-26
2025_EB_623231_1
SE/CEDC/N/CBE/C/No.22/2025-26
Open Tender
Civil Works
60 days
Saravanampatty SS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,000
Yes
13 Jan 2026
13 Nov 2025
28 Nov 2025
13 Nov 2025
27 Nov 2025
13 Nov 2025
Amount
Dismantling and removing the existing floor tiles including cost of labour charges, lead, lift, etc., complete as per standard specification.
Dismantling and removing the existing Plain cement concrete including cost of labour charges, lead, lift, etc., complete as per standard specification.
Filling using gravel for foundation and basement or wherever necessary in well rammed including filling charges as per standard specification (watering & consolidation) including with all leads, lifts, as per specification etc., complete.
Plain cement concrete in CC 1:3:6, using 40mm HBG metal including cost of cement, all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete.
Reinforced cement concrete in C.C. 1:1 ½ :3 mix using 12 to 20mm HBG machine crushed metal for Raft including cost of cement, all materials, labour, curing, vibration charges, without shuttering all leads, lifts, as per standard specification, etc., complete. (but excluding cost of steel reinforcement.)
Supplying and laying of vitrified tiles of approved quality and colour with ISI mark, laid in PCC 1:4:8, CM1:3, 20mm thick and pointing with white cement using 0.40kg/m2 including finishing the joint , and pointing flush with tile surface including cost of all materials,lead, lift, labour, curing etc., complete.
Providing steel reinforcement RTS rods up to 16 mm dia for reinforced concrete works, including cost of steel rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete.
Disposal of excess of surplus earth away in low lying area with a head load lead 100m including spreading, levelling, labour, leads, lifts etc., complete, as per standard specification.
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_745218.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid