Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹25.0 L
EMD Value
₹49,940
Closing Date
9 Nov 2026, 6:00 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
HQ CWE SRI GANGANAGAR
HQ CWE POST BOX 48 SRI GANGANAGAR-335001 (Rajasthan)
REPAIR/MAINT TO TRANSFORMER AND ALLIED WORKS AT SGNR MIL STN
2026_MES_791177_2
CA NO CWE SGNR/TOKEN-53 OF 2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE SRI GANGANAGAR
Class E and above and Category b(ii)
8 documents required · 8 mandatory
₹500
GE SRI GANGANAGAR
₹49,940
Yes
26 Oct 2026
26 Oct 2026
10 Nov 2026
26 Oct 2026
9 Nov 2026
2 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out transformer from its position from any location under GE SGNR area for major repair/servicing/rewinding of capacity 25 KVA to 100 KVA ,11/.433 KV volts disconnecting/opening HV,LV electrical connections/earthing connections complete all as specified and directed along with following other works:
(a)Transportation of transformer to civil work shop and back at the site by making necessary arrangement of T&P(Cranes, recovery, vehicle to be arranged by firm.
(b)Opening of transformer top cover by extraction, removing of serviceable /unserviceable nuts, bolts and washers etc.
(c )Drainage out of transformer oil and keeping in safe custody for reuse.
(d) Lifting primary coil and secondary coil, dismantling of transformer complete part by part carefully.
(e) Refiling topping up of transformer oil after dehydration and filtration in transformer.
(f) Transformer core heating in oven.
Note (a): (i) Replacement of u/s parts like bush insulators, bush studs, breather assembly, bush rod, silica gel brass rod, rewinding, reinsulating of primary and secondary coil with copper/aluminum, dehydration and filtration of transformer oil etc shall be measured & paid separately under relevant items of schedule.
(ii) Renewal of nuts, bolts and washer deemed to be included in above rate
(iii)Rate for Testing and testing equipment for transformer deemed to be included in above rate. | 8 | Each Job | - | - |
| 2 | All as per Srl item No. 01 above but for 160KVA to 315 KVA transformer complete all as directed. | 6 | Each Job | - | - |
| 3 | All as per Srl item No. 01 above but for 400KVA to 630 KVA transformer complete all as directed. | 4 | Each Job | - | - |
| 4 | M&L for replacement of insulation material such as gasket(cork sheet for top cover), LT terminal box, LV & HV bushing washer, paper insulation for coil for 25 KVA to 100 KVA transformer complete all as specified and directed by Engr-in-Charge. | 8 | Each Job | - | - |
| 5 | M&L for replacement of insulation material such as gasket(cork sheet for top cover), LT terminal box, LV & HV bushing washer, paper insulation for coil for 160 KVA to 315 KVA transformer complete all as specified and directed by Engr-in-Charge. | 6 | Each Job | - | - |
| 6 | M&L for replacement of insulation material such as gasket(cork sheet for top cover), LT terminal box, LV & HV bushing washer, paper insulation for coil for 400 KVA to 630 KVA transformer complete all as specified and directed by Engr-in-Charge. | 4 | Each Job | - | - |
| 7 | M&L for reconnecting 25 KVA to 100 KVA transformer after complete repairs including installation & testing the transformer as per relevant IS provisions incl connecting and showing to executive and signature in Job sheeet by Engr in charge complete all as specified and directed by Engr-in-Charge. | 8 | Each Job | - | - |
| 8 | M&L for reconnecting 160 KVA to 315 KVA transformer after complete repairs including installation & testing the transformer as per relevant IS provisions incl connecting and showing to executive and signature in Job sheeet by Engr in charge complete all as specified and directed by Engr-in-Charge. | 6 | Each Job | - | - |
| 9 | M&L for reconnecting 400 KVA to 630 KVA transformer after complete repairs including installation & testing the transformer as per relevant IS provisions incl connecting and showing to executive and signature in Job sheeet by Engr in charge complete all as specified and directed by Engr-in-Charge. | 4 | Each Job | - | - |
| 10 | Supply an filling in replacement of fresh, new, inhabited mineral insulating transformer oil confirming to IS 335(latest), having breakdown voltage (dielectric strength) not less than 60 KV (after filtration/treatment) and minimum 30 KV as delivered, water content <= 30 ppm complete including test certificate from the OEM, all as specified and directed by Engr-in-charge. | 2,000 | Ltr | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_892597.xls
BOQ • 0.26 MB
Tender_53.pdf
Tender Documents • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .