Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹1.9 LAccepted-Finance | ₹1.9 L | 1st | Accepted-Finance 1st Lowest |
| 2 | 2nd₹1.9 LAccepted-Finance | ₹1.9 L | 2nd | Accepted-Finance 2nd Lowest |
| 3 | 3rd₹2.0 LAccepted-Finance | ₹2.0 L | 3rd | Accepted-Finance 3rd Lowest |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
26 Nov 2020, 12:00 pmClosed
EE ETD BIJNOR
EE ETD BIJNOR 132 KV SUB STATION PREMISES BIJNOR
WORK FOR MAXIMIZE THE SECTIONAL GROUND CLEARANCE BY RESAGGING OF 132 KV NEHTAUR (220)-LUXOR/MANGLORE DC LINE UNDER ETD BIJNOR
2020_UPTCL_527289_1
07W/ETDBJ/2020-21
Open Tender
Electrical Works
90 days
132 KV NEHTAUR-LUXOR/MANGLORE LINE
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD BIJNOR
₹2,000
26 Nov 2020
2 Nov 2020
26 Nov 2020
2 Nov 2020
26 Nov 2020
2 Nov 2020
Amount
To maximize the sectional ground clearance by resagging of 132 KV Nehtaur-Luxor/Manglore (D/C) Line.
Dismantling of ACSR Wolf conductor after opening of jumpers of all the three phase etc. including dehoisting of insulating string at one end fitting of roller on each suspension insulator between following section.
Between L.No. 122C to 133C (3.630 km.)
Between L.No. 133B to 139C (2.470 km.)
Raising of ACSR Wolf conductor after correct measuring/Cutting/ fitting of tension fitting such as spacing between conductors and ground clearance of tower conductor suitably increase for minimum ground clearance.
Between L.No. 122C to 133C (3.630 km.)
Between L.No. 133B to 139C (2.470 km.)
Refitting of all hardware accessories at its specified points, clamping at suspension point after removing of rolloers and then jumpering etc.
Between L.No. 122C to 133C (3.630 km.)
Between L.No. 133B to 139C (2.470 km.)
M/S DHARMENDRA CHAUDHARY
M/S AJAY KUMAR POWER CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid