| Sl No | Description | Qty | Unit | NEW JEHLUM CONSTRUCTION CO. L9 | TRB INFRATECH PVT. LTD. L11 | Veer Kanwar Singh L6 | 8 BOUNDARIES BUILDERS PVT LTD L13 | ARUN KUMAR L5 | MOHINDER SINGH CHARAK L4 | M/s Shashi Sharma L3 | Baldev Singh L7 | ROMESH CHANDER L10 | Suri Construction Aids L14 | M/S HARI SHAM GOVT CONTRACTOR L1 | ROMESH SINGH L2 | M/S Chahal Hot Mix Plant L8 | naresh sharma L12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: (Bituminous road). | |||||||||||||||||
| 1.01 | (Bituminous road). | 720 | Sqm | 45 ₹32,400 | 100 ₹72,000 | 130 ₹93,600 | 700 ₹5,04,000 | 99 ₹71,280 | 50 ₹36,000 | 100 ₹72,000 | 200 ₹1,44,000 | 10 ₹7,200 Lowest | 180 ₹1,29,600 | 10 ₹7,200 Lowest | 130 ₹93,600 | 25 ₹18,000 | 230.94 ₹1,66,276.8 |
| 1.02 | (WBM road). | 720 | Sqm | 45 ₹32,400 | 100 ₹72,000 | 90 ₹64,800 | 300 ₹2,16,000 | 99 ₹71,280 | 50 ₹36,000 | 100 ₹72,000 | 200 ₹1,44,000 | 10 ₹7,200 Lowest | 225 ₹1,62,000 | 10 ₹7,200 Lowest | 130 ₹93,600 | 25 ₹18,000 | 117.17 ₹84,362.4 |
| 2.00 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 54 | Cum | 145 ₹7,830 | 120 ₹6,480 | 240 ₹12,960 | 260 ₹14,040 | 199 ₹10,746 | 250 ₹13,500 | 200.01 ₹10,800.54 | 200 ₹10,800 | 100 ₹5,400 | 450 ₹24,300 | 100 ₹5,400 | 200 ₹10,800 | 25 ₹1,350 Lowest | 209 ₹11,286 |
| 3.00 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 499.5 | Cum | 3,045 ₹15,20,977.5 | 3,000 ₹14,98,500 | 3,200 ₹15,98,400 | 3,000 ₹14,98,500 | 2,520 ₹12,58,740 | 2,700 ₹13,48,650 | 3,000 ₹14,98,500 | 3,000 ₹14,98,500 | 3,400 ₹16,98,300 | 4,900 ₹24,47,550 | 2,500 ₹12,48,750 Lowest | 2,750 ₹13,73,625 | 3,000 ₹14,98,500 | 3,668 ₹18,32,166 |
| 4.00 | Providng and laying reinforced cement concrete VDF/Trimix Pavement of M-25 grade with ready mixed concrete from Batching Plant following the process of VDF with screed vibration, placing of filter mat, top met, vaccum process, floating trowelling, broming etc. using Polycarboxylic technology to reduce the W/C ratio to permisible limit including application of Non-metallic Hardener of make Fos rock /sikka /Normet & equivalent @ 5 kg Per sqm with cutting of grooves of size 6mm x 25mm with cutting machine to make panels as directed by Engineer-in-charge then filling of grooves with PU (Polyurethane) Sealant. (Excluding cost of steel reinforment) | 804 | Cum | 8,045 ₹64,68,180 | 8,700 ₹69,94,800 | 7,700 ₹61,90,800 | 8,200 ₹65,92,800 | 7,200 ₹57,88,800 | 7,300 ₹58,69,200 | 6,200 ₹49,84,800 | 7,500 ₹60,30,000 | 8,700 ₹69,94,800 | 9,113 ₹73,26,852 | 5,500 ₹44,22,000 Lowest | 6,550 ₹52,66,200 | 8,200 ₹65,92,800 | 8,717 ₹70,08,468 |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : Cold twisted bars | 42,000 | Kg | 85.45 ₹35,88,900 | 78 ₹32,76,000 | 76 ₹31,92,000 | 85 ₹35,70,000 | 81 ₹34,02,000 | 71 ₹29,82,000 | 80 ₹33,60,000 | 80 ₹33,60,000 | 75 ₹31,50,000 | 73 ₹30,66,000 | 70 ₹29,40,000 | 71 ₹29,82,000 | 80 ₹33,60,000 | 65.77 ₹27,62,340 Lowest |
| 6.00Carriage of material by MT including loading /Unloading and stacking at site completed. | |||||||||||||||||
| 6.01 | Sand for an average lead of 10km. | 561.93 | Cum | 145 ₹81,479.85 | 137 ₹76,984.41 | 50 ₹28,096.5 | - | 99 ₹55,631.07 | 99 ₹55,631.07 | - | 50 ₹28,096.5 | 20 ₹11,238.6 | 35 ₹19,667.55 | 10 ₹5,619.3 | 100 ₹56,193 | 1 ₹561.93 Lowest | 202.17 ₹1,13,605.39 |
| 6.02 | Stone aggregate below 40mm size av. 10 kms | 1,123.87 | Cum | 145 ₹1,62,961.15 | 137 ₹1,53,970.19 | 50 ₹56,193.5 | - | 99.99 ₹1,12,375.76 | 99 ₹1,11,263.13 | - | 50 ₹56,193.5 | 20 ₹22,477.4 | 35 ₹39,335.45 | 10 ₹11,238.7 | 100 ₹1,12,387 | 1 ₹1,123.87 Lowest | 202.17 ₹2,27,212.8 |
Tender Value
₹1.5 Cr
Closing Date
6 Apr 2021, 6:00 pmClosed
Rajesh Bhagat
XEN PWD DIV NO II JAMMU
Improvement upgradation of road from Canal Head to Toph Bridge in stretches by way of providing and laying of RCC VDF tri-mix pavement
2021_PWDJK_120928_1
185 of 2020-2021
Open Tender
Civil Works
Item Rate
180 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
Yes
Treasury Challan under MH 0059
Exempted
8 Apr 2021
19 Mar 2021
7 Apr 2021
19 Mar 2021
6 Apr 2021
19 Mar 2021
Amount
Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: (Bituminous road).
(Bituminous road).
(WBM road).
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providng and laying reinforced cement concrete VDF/Trimix Pavement of M-25 grade with ready mixed concrete from Batching Plant following the process of VDF with screed vibration, placing of filter mat, top met, vaccum process, floating trowelling, broming etc. using Polycarboxylic technology to reduce the W/C ratio to permisible limit including application of Non-metallic Hardener of make Fos rock /sikka /Normet & equivalent @ 5 kg Per sqm with cutting of grooves of size 6mm x 25mm with cutting machine to make panels as directed by Engineer-in-charge then filling of grooves with PU (Polyurethane) Sealant. (Excluding cost of steel reinforment)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : Cold twisted bars
Carriage of material by MT including loading /Unloading and stacking at site completed.
Sand for an average lead of 10km.
Stone aggregate below 40mm size av. 10 kms
ROMESH SINGH
M/s Shashi Sharma
MOHINDER SINGH CHARAK
ARUN KUMAR
Veer Kanwar Singh
Baldev Singh
M/S Chahal Hot Mix Plant
NEW JEHLUM CONSTRUCTION CO.
ROMESH CHANDER
TRB INFRATECH PVT. LTD.
naresh sharma
8 BOUNDARIES BUILDERS PVT LTD
Suri Construction Aids
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_232695.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .