Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-Finance | ₹4.4 L | L1 | Accepted-Finance being 1st lowest |
| 2 | L2₹4.8 LRejected-Finance | ₹4.8 L | L2 | Rejected-Finance being 2nd lowest |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Not Upload ITR and Workdone |
| Sl No | Description | Qty | Unit | PITAMBER NEGI L2 | SUMIT NEGI L1 |
|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceed 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottom, lift upto 1.5 m, including getting out the excavated soil and disposal surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | 2.7.3 Hard Rock (blasting Prohibited) | 12.59 | cum | 290 ₹3,651.10 | 286 ₹3,600.74 |
| 2.00Providing & laying in position cement concrete of specified grade excluding the cost of centering ans shuttering - All work up to plinth level: | |||||
| 2.01 | 7.1.1 Cement mortar 1:6 (1 cement : 6 coarse
sand) | 3.04 | cum | 5,100 ₹15,504 | 4,900 ₹14,896 |
| 3.00Coursed rubble masonry (first sort) with hardstone in foundation and plinth with : | |||||
| 3.01 | 7.6.1 Cement mortar 1:6 (1 cement : 6 coarse
sand) | 7.46 | cum | 5,900 ₹44,014 | 5,700 ₹42,522 |
| 4.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level : | |||||
| 4.01 | 5.1.3 1:2:4 (1 cement : 2 coarse sand) : 4 graded
stone aggregate 20 mm nominal size) | 2.07 | sqm | 6,300 ₹13,041 | 6,200 ₹12,834 |
| 5.00Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 5.01 | 5.9.3 Suspended floors, roofs, landings,balconies and access platform | 12 | cum | 469 ₹5,628 | 469 ₹5,628 |
Tender Value
₹5.2 L
EMD Value
₹11,500
Closing Date
24 Apr 2026, 5:00 pmClosed
DCF Sarahan
Deputy Conservator of Forest, wildlife Division Sarahan
Construction of Toilet at Kalikutang
2026_FD_134583_1
25 dated 18/04/2026
Open Tender
Civil Works
Sarahan
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
DCF Sarahan
₹11,500
25 Apr 2026
18 Apr 2026
25 Apr 2026
18 Apr 2026
24 Apr 2026
18 Apr 2026
18 Apr 2026 - 24 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceed 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottom, lift upto 1.5 m, including getting out the excavated soil and disposal surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | 2.7.3 Hard Rock (blasting Prohibited) | - | cum | - | - |
| 2Providing & laying in position cement concrete of specified grade excluding the cost of centering ans shuttering - All work up to plinth level: | |||||
| 2.01 | 7.1.1 Cement mortar 1:6 (1 cement : 6 coarse
sand) | - | cum | - | - |
| 3Coursed rubble masonry (first sort) with hardstone in foundation and plinth with : | |||||
| 3.01 | 7.6.1 Cement mortar 1:6 (1 cement : 6 coarse
sand) | - | cum | - | - |
| 4Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level : | |||||
| 4.01 | 5.1.3 1:2:4 (1 cement : 2 coarse sand) : 4 graded
stone aggregate 20 mm nominal size) | - | sqm | - | - |
| 5Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 5.01 | 5.9.3 Suspended floors, roofs, landings,balconies and access platform | - | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
TenderNotice.pdf
Tender Documents • 0.76 MB
BOQ_199173.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid