Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Fee/PreQual/Technical/Finance | -23.35% | ₹2.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹3.5 L+₹81,375 (30.3%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹3.5 L+₹81,375 (30.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹3.5 L+₹81,725 (30.5%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹3.5 L+₹81,725 (30.5%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.5 L
EMD Value
₹10,500
Closing Date
10 Aug 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
CROSSING NHO BASHIR AH BHAT, HILAL AH SHALA, FAYAZ AH SHALA AND OTHERS BLOCK ANANTNAG
2026_RDPR_319100_6
ENIT84of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹10,500
2 Sept 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed all kinds of soil | 5.09 | CUM | 479.3 | ₹2,439.64 |
| 3 | Diversion of Nadi Canal ,dewatering of trenches during the execvation of work by engagement of labour & dewatering by water pump portable type | 6 | Nos | 553 | ₹3,318 |
| 4 | Providing and laying of hand Packed stone soling including carriage from approved source to site of work complete job | 2.77 | CUM | 1,174 | ₹3,251.98 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20mm nominal size) with carriage of materails lead of 5 kms | 0.5 | CUM | 5,418.18 | ₹2,709.09 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) with carriage of materails lead of 5 kms | 7.61 | CUM | 6,055.5 | ₹46,082.36 |
| 7 | Reinforcement including cutting bending placing in postion complete job | 1,247.5 | KGS | 115 | ₹1,43,462.5 |
| 8 | Providing and laying of Reinforced cement concrete 1:1.5:3 grade (1 cement : 1.5 coarse sand : 3graded stone aggregate 20 mm nominal size) of specified grade execluding the cost of centring and shuttering but including carriage of materails with lead of 5 kms comlpete job. | 11.42 | CUM | 8,038.7 | ₹91,801.95 |
| 9 | Centering shuttering incl.starightening proping & removal of form work etc Complete job | 1.67 | SQM | 286.35 | ₹478.2 |
| 10 | Centering shuttering incl.starightening proping & removal of form work etc Complete job Suspended floors ,roofs , | 77.29 | SQM | 718.2 | ₹55,509.68 |
| 11 | ADD FOR COST OF SIGNBOARD AND PHOTOGRAPHS | - | Each | 0.4 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1055872.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .