| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Finance ASHRAF TOLA UNNAO ROAD SANDILA HARDOI | SANDILA | HARDOI | UTTAR PRADESH | L1 | Admitted-Finance | ||
| 2 | L2₹2.0 L+₹1,692.40 (0.87%)Admitted-Finance KURNA TIMRUK SANDILA HARDOI UP 241204 | SANDILA | HARDOI | UTTAR PRADESH | 241204 | L2 | Admitted-Finance | ||
| 3 | L3₹2.0 L+₹4,181.23 (2.15%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.0 L+₹4,678.99 (2.41%)Admitted-Finance BH 6D 844 SECTOR 6 GOMTINAGAR EXTENSION LUCKNOW UP 226010 | LUCKNOW | LUCKNOW | UP | 226010 | L4 | Admitted-Finance |
Tender Value
₹2.1 L
EMD Value
₹21,000
Closing Date
30 Oct 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
EE PD PWD HARDOI
Special repair work on Sandila Kasimpur Road Km-4 to Kudauri Link Road
2026_CEUCZ_1199847_30
2460/M-11/E-TENDER/2026 DT- 15.10.2026
Open Tender
Civil Works - Roads
Percentage
60 days
HARDOI
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹21,000
Yes
5 Nov 2026
25 Oct 2026
30 Oct 2026
25 Oct 2026
30 Oct 2026
25 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m. / Excavation for roadwork in soil with hydraulic excavator of cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3. (Rates are including all texes but excluding GST) | 12.55 | Cum | 35 | ₹439.25 |
| 2 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row / Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. / 600 mm dia (Rates are including all texes but excluding GST) | 7.5 | RM | 1,783 | ₹13,372.5 |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 / I. P.C.C
grade M 10 / (i) Nominal mix 1:3:6 ( Mechanical mix) (Rates are including all texes but excluding GST) | 1.92 | Cum | 6,995 | ₹13,430.4 |
| 4 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 / I. Brick masonry in 1:3 cement mortar (Rates are including all texes but excluding GST) | 10.03 | Cum | 6,906 | ₹69,267.18 |
| 5 | Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204. (Rates are including all texes but excluding GST) | 28.99 | Sqm | 100 | ₹2,899 |
| 6 | Brick edging on both side of the road of 1st Class brick 8 cm. (3") wide and 12 cm. (41/2") deep laid with mud mortar all labour finished to the required template and in proper alignment and also including dressing & ramming the excavated earth including all labour, T&P sudries required for proper completion of work with material. (Rates are including all texes but excluding GST) | 0.02 | KM | 88,000 | ₹1,760 |
| 7 | Construction of Subgrade and Earthen Shoulders/Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.(local earth/Without Quartage) (Rates are including all texes but excluding GST) | 20.68 | Cum | 60 | ₹1,240.8 |
| 8 | Granular Sub-base with Well Graded Material (Table 400.1) / (A) By Mix in Place Method / Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. / (i) For Grading I Material (Rates are including all texes but excluding GST) | 8.25 | Cum | 3,781 | ₹31,193.25 |
| 9 | Water Bound Macadam Sub-base/base / 2) WBM Grading 2 / Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. / (A) By Manual Means (Rates are including all texes but excluding GST) | 4.5 | Cum | 4,475 | ₹20,137.5 |
| 10 | Water Bound Macadam Sub-base/base / 3) WBM Grading 3 / Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. / (A) By Manual Means (Rates are including all texes but excluding GST) | 4.5 | Cum | 4,508 | ₹20,286 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.28 MB
Tendernotice_2.pdf
PDF • 0.92 MB
BOQ_2271591.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .