| 1 | L1₹3.7 CrAdmitted-Finance | ₹3.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.9 Cr+₹18.6 L (5.00%)Admitted-Finance | ₹3.9 Cr+₹18.6 L (5.00%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JAWAHAR CONSTRUCTIONS L2 | SRI SIVASAKTHIBUILDES L1 |
|---|---|---|---|---|---|
| 1.00Part 1 : CONSTRUCTION OF BRIDGE ACROSS SHANMUGANATHI RIVER AT AMMAN KOVIL TO SHANMUGANATHI RIVER H/O MANOOR Estimate Amount Rs.378.97 Lakhs | |||||
| 2.00 | Earth work excavation in all classes of soil except kankar requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL. UNDER ABUTMENTS AND PIERS LOCATION. | 501.25 | cum | 164.43 ₹82,420.54 | 156.6 ₹78,495.75 Lowest |
| 3.00 | Earthwork excavation in all classes of soil except kankar and soft rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF FOOTINGS UNDER ABUTMENTS AND PIERS. | 407.5 | cum | 384.41 ₹1,56,647.08 | 366.1 ₹1,49,185.75 Lowest |
| 4.00 | Earthwork excavation in soft disintegrated rock not requiring blasting except hard rock requiring blastin and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF FOOTINGS UNDER ABUTMENTS AND PIERS. | 855.75 | cum | 483.74 ₹4,13,960.51 | 460.7 ₹3,94,244.03 Lowest |
| 5.00 | Vibrated Cement Concrete of grade M-15, Nominal Mix, 1:2:4 using 20mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE UNDER FOOTINGS OF ABUTMENTS, WINGS AND PIERS. | 40.75 | cum | 6,384 ₹2,60,148 | 6,080 ₹2,47,760 Lowest |
| 6.00 | Vibrated reinforced cement concrete M35 grade Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for FOOTINGS UNDER ABUTMENTS, RETURN WALLS AND PIERS. | 569.76 | cum | 8,859.26 ₹50,47,651.98 | 8,437.39 ₹48,07,287.33 Lowest |
| 7.00 | Vibrated reinforced cement concrete M-35 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for ABUTMENTS AND RETURN WALL STEM BELOW SILL. | 55.72 | cum | 9,835.64 ₹5,48,022.19 | 9,367.28 ₹5,21,926.11 Lowest |
| 8.00 | Vibrated reinforced cement concrete M35 grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for PIER COLUMNS BELOW SILL. | 12.21 | cum | 10,243.36 ₹1,25,122.64 | 9,755.58 ₹1,19,164.41 Lowest |
| 9.00 | Vibrated reinforced cement concrete M-35 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for ABUTMENTS AND RETURN WALLS ABOVE SILL LEVEL. | 296.84 | cum | 10,568.08 ₹31,37,060.57 | 10,064.84 ₹29,87,677.3 Lowest |
| 10.00 | Vibrated reinforced cement concrete M35 grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for PIER COLUMNS ABOVE SILL. | 60.95 | cum | 12,829.09 ₹7,81,933.04 | 12,218.18 ₹7,44,698.07 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.8 L
Closing Date
10 Apr 2023, 3:00 pmClosed
The Project Director , DRDA,Dindigul
The Project Director , DRDA,Dindigul
Construction of bridge across Shanmuganathi river at Amman kovil to Shanmuganathi river in Thoppampatti block of Dindigul District
2023_RDTN_297300_1
DIPR NO.1307/Tender / 2023 dated. 21.03.2023
Open Tender
Civil Works - Bridges
Item Wise
540 days
DRDA
Construction of bridge across Shanmuganathi river at Amman kovil to Shanmuganathi river in Thoppampatti block of Dindigul District
5 documents required · 5 mandatory
₹0
₹3.8 L
Yes
DRDA,DINDIGUL
12 Jul 2023
24 Mar 2023
10 Apr 2023
24 Mar 2023
10 Apr 2023
24 Mar 2023
4 Apr 2023
Amount
Part 1 : CONSTRUCTION OF BRIDGE ACROSS SHANMUGANATHI RIVER AT AMMAN KOVIL TO SHANMUGANATHI RIVER H/O MANOOR Estimate Amount Rs.378.97 Lakhs
Earth work excavation in all classes of soil except kankar requiring blasting and depositing on bank as per SS20B with all leads and lifts and all other incidental charges such as bailing out water shoring strutting, walling and forming protective bunds whereever necessary etc., complete as per relevent standard specification for DRESSING THE BED UPTO SILL LEVEL. UNDER ABUTMENTS AND PIERS LOCATION.
Earthwork excavation in all classes of soil except kankar and soft rock not requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF FOOTINGS UNDER ABUTMENTS AND PIERS.
Earthwork excavation in soft disintegrated rock not requiring blasting except hard rock requiring blastin and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for FOUNDATION OF FOOTINGS UNDER ABUTMENTS AND PIERS.
Vibrated Cement Concrete of grade M-15, Nominal Mix, 1:2:4 using 20mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE UNDER FOOTINGS OF ABUTMENTS, WINGS AND PIERS.
Vibrated reinforced cement concrete M35 grade Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for FOOTINGS UNDER ABUTMENTS, RETURN WALLS AND PIERS.
Vibrated reinforced cement concrete M-35 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for ABUTMENTS AND RETURN WALL STEM BELOW SILL.
Vibrated reinforced cement concrete M35 grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for PIER COLUMNS BELOW SILL.
Vibrated reinforced cement concrete M-35 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for ABUTMENTS AND RETURN WALLS ABOVE SILL LEVEL.
Vibrated reinforced cement concrete M35 grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for PIER COLUMNS ABOVE SILL.
Vibrated reinforced cement concrete M-35 Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for BED BLOCK CUM DIRT WALL OVER ABUTMENTS.
Vibrated reinforced cement concrete M35 (Design mix) using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for CAPPING BEAM OVER PIER COLUMNS.
Vibrated reinforced cement concrete M35 (Design mix) using 20mm & 12mm ISS metal, including cost and conveyance of all materials to site and cost of cement at site,but excluding cost and fabrication of steel but including cost of formwork labour charges for mixing transporting,laying,curing concrete,working at heights,soft water,hire charges for tools and plants,including all oter incidental charges,etc., complete for PEDESTALS OVER CAPPING BEAMS AND BED BLOCKS.
Supply and fixing of Elastomeric bearing of size 320x400x64mm including cost and conveyance to work site, labour for fixing the same in correct position and all other incidental charges etc., complete as per standard specifications.
Vibrated reinforced cement concrete M-35, Grade, Design Mix using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges, etc., complete as per standard specifications for T-BEAM MAIN GIRDERS AND CROSS GIRDERS.
Vibrated reinforced cement concrete M-30, Grade, Design Mix using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,including inspection chamber, inclusive of 150mm ducts and other accessories of footpath etc., complete for DECK SLAB as per MOST DRG NO. SD/241 & SD/205.
Vibrated reinforced Concrete M-30, Grade, Design Mix, using ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC HAND RAILS AND POSTS OVER DECK SLAB.
Vibrated reinforced Concrete M-40, Grade, Design Mix, using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC CRASH BARRIER
Providing and fixing of Galvinised Iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.
Vibrated Cement Concrete M-20, Grade, Design Mix 1:1.5:5 , using 20mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete,working at heights,hire charges for tools and plants, including all other incidental rges,etc.,complete as per standard specification for PCC PARAPET OVER APPROACHES.
Supplying and installation of STRIP SEAL EXPANSION joint system conforming to specifications for Road and Bridge Works-IV Revision; 2001 Published by Ministry of Surface Transport (Roads Wing) in the 40mm wide expansion gap provided in between decks over piers and in between deck and dirt wall over abutment with fatigue tested structural steel section at the nosing and anchorage assembly, including cost and conveyance of all materials, cost of testing as per the MOST specifications, including labour, equipment and incidental charges for fixing the joints complete in all respects, as per specifications.
Providing and fixing seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN BETWEEN THE ABUTMENTS AND WINGS, -
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MOST's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc,complete.
Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe-500, conforming to IS:1786-1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlaping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete,Fe-500 grade.
Upto 16mm dia.
Above 16mm dia.
Supply and fabrication of S-240 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings,including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc,complete, S-240 grade
Supply and fixing of High Quality of PVC pipes of 150mm dia. Including cost and conveyance of pipes to the site and fixing in position to prpoer grade and level, including labour charages for fixing and including all other incidental charges etc complete., for proving utility services in footpaths.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
JAWAHAR CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .